ML20151Z403
| ML20151Z403 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/30/1986 |
| From: | Creamer K, Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20151Z364 | List: |
| References | |
| NUDOCS 8808290318 | |
| Download: ML20151Z403 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _.
OPERATING DATA REPORT DOCKET NO.
50-259 DATE SEPTEMBER 86, PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE 2.
Reporting period: SEPTEMBER, 1986
- 3. Licensed-Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes occur in Capacity Ratings (Items Number 3 Tnrough 7) Since Last Report, Give Reason: N/A 9.
Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions. If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 720.0 6551 106711
- 12. Hours Reactor Was critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0 1G. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130 c18. Net Electric Generation (MWh)
-4393.0
-30765 53726244
- 19. Unit Service Factor 00 0.0 54.60
- 20. Unit Availability Factor 0.0 0.0 54.60
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 47.27
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 47.27
- 23. Unit Forced Outage Rate 100.0 100.0 33.79
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
CRevision
, -d 8800 03193000h59 DOCK pyy P,DR _
s
(~
av m,
Mb -
A'IERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit One DATE 10-01-86 COMPLETED BY K.L. Creamer TELEPHONE (205)729-2955 MONTH September 1986*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) e 1
-6 17
-7 2
-6 18
-5 3
-7 10
-5 4
-6 20
-4 5
-5 21
-4 6
-5 22
-10 7
-6 23
-6 8
-5 24
-8 9
-6 25
-7 10
-7 26
-7 11
-6 27
-6 12
-6 28
-6 _
13
-6 29
-6 14
-6 30
-7 15
-6 31 I
r 16
-6 INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
- Complete Revision (9/77)
laarc iove an v
NUCLEAR PLANT OPERATING STATISTICS 30 Bresens Ferry Nuclear Pla n t Persoo Hours 72 0 Monin September 19 86 stem No.
Unit No.
Unit-1 Unit-2 Unit-3 Plant 1
Averace -ouriv Gross Leae. '<W 0
0 0
0 2
Voimum wovr Net Generation. MWh 0
0 0
0
__3 Core Thermal Emeriv Gen. GWO (tS o
0 0
0 4
Steam Gen. Therrnal Ene/gy Gen., Gwo (td l
5 Gross Electrical Gen.'. MWn n
0 0
_Q 6
station Use. MWn
_4.393*
3.501 3.206 11.101*
{
7 Net Electrical Gen., Mwn
-4d93*
-3.501 1.2ng
-11. lDI
- U a
station Use. Percent n
o 0
0 9
Accum. Core Avg. Exocture, MWDrron1 o
0 0
_0 10 CTEG This Month.106 BTU n
o 0
0 11 SG TEG This Montn.10 0 B TU
!?
13 Hours Aeactor was Critaal 0
0 0
'4 U.ait Use, wours. Min.
0 n
n 0
0 IS Capaesty Factor. Percent n
0 0
0 3
16 Turbine Avail. Fsc*er. P+rcent n
0 0
0 12 Generater Avail. Facter. serceat n
a 1
0 1B Tureocen Avail. Factor. c,:ent 0
0 0
0 e
19 De3eter Avol. Factor. Derceat 0
0 0
0 2
20 Ua't Avail. Factor. Derceat 0
0 0
0 21 Turbiae Startuos 0
0 0
0 22 Qeseter Csid Surtues 0
0 0
0
?S y
24 Gross Heat Rate. 8tu,kWh 0
0 0
0 g
25 Net west Aate atu/kWn 3
Os 0
0 0
0 1
27 g
23 Throttie Pressure, esig 0
0 0
0 c
29 Tnrottle Temeerature *F 0
0 0
0 y
30 En naust Pressure, inh 9 Aes.
0 0
0 0
- =
31 intawe water Temo. 'F 0
0 0
0 m
32 33 Main Feedwater, M ib/hr i
34 35 36 37 Full Power Capacity. E FPO (3)
(4)
(4)
(4) 38 Accum. Cycle Full Power Days. EFPD (4)
(4)
(4) 9 39 Oil Fired for GenerJtion. Galtons N
4.139 40 Od Westina Value. Stu! Gal.
140.000
~
41 D:euf G en e r a t!c n MWg 12.6 is ?
Max. Hour Net Gen.
I Max. Day Net Gen.
Loso
~
MWn I
Time l
Date i
MWn l
Oate F a c t o r. .
2 43 n
i j
i n
i n
R ema rk s -
AFor 8FNP tnis value is MWD /STU and for SONP and WBNP this value is MWDf MTV.
j 2(t) encicates Thermal Energy.
3- (1)
Informatten f urnished by Reactor Malvsis Group. Cli a t t anoo u (4)
Administrative hold.
- Revision Date $wemitted-Q Date Revised
_ A M.' G _
Ja --9
~
. Piant superinteNent