_

s.*

~o 1

TUA I

i Tennessee Valley Authooty. Post Office Box 2000 Decatur, Alabama 35609 October 13, 1998 U.S. Nuclear Regulatory' Commission l ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - SEPTEMBER 1998 MONTHLY OPERATING REPORT l The enclosure provides the September 1998 Monthly Operating Report as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this matter, please call I

me at (256) 729-2636.

S)ncer l .. ~

j Mana r of Licensing Td Industry AEfairs ,

[

Enc j 'j cc: See page Z l

n /

9810190335 980930 L k [-

PDR ADOCK 05000259 R PDR i

i i

l

  • - l

_ _ _ _ _ _ J

U.S. Nuclear Regulatory Commission

'Page'2 October 13, 1998 Enclosure cc (Enclosure):

Mr. Harold. O. Christensen, Branch Chief U.S. Nuclear Regulatory Commission Region II l 61 Forsyth Street, S.W. I Suite 23T85 ,

Atlanta, Georgia 30303 J

1 Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II J Office of Nuclear Reactor l Regulation, Mail 13 H3 Washington, D.C. 20555 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 Ms. Barbara Lewis McGraw-Hill Companies 1200 G Street, N.W.

Suite 1100 Washington, D.C. 20005-3802

l l '.

i-l'

, . ENCLOSURE l

l TENNESSEE VALLEY AUTHORITY l

l BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT SEPTEMBER 1998 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 i

I UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52  !

UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68 t

l r

l l

l- ..

i OPERATIONAL

SUMMARY

SEPTEMBER 1998 BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a naximum dependable capacity of zero MWe. Accordingly, TVA does not consider reporting cumulative hours for the period beginning June 1, 1985, when calculating the operating status variables.

BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of September, Unit 2 generated 779,590 megawatt hours gross electrical power and operated at a net capacity l factor of 99.3 percent. As of September 30, 1998, Unit 2 has j operated continuously for 335 days. j l

l BROWNS FERRY NUCLEAR PLANT UNIT 3 For the month of September, Unit 3 generated 357,660 megawatt hours gross electrical power with a net capacity factor of 45.1  ;

percent. On July 21, 1998, at 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br />, the unit began coastdown for the Cycle 8 refueling outage. On September 20, 1998, at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, Unit 3 started its scheduled Cycle 8 ,

refueling outage. At the time when Unit 3 started its refueling l outage, it had run continuously for 153 days, i

I l

E1

1 I

i ..

AVERAGE DAILY UNIT POWER LEVEL

- DOCKET NO. 50-259 UNIT NO. ONE DATE: Oct. 5, 1998 COMPLETED BY:. J. E. Wallace TELEPHONE 256-729-7874 MONTH September 1998  !

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)

1. 0 17. 0 l
2. 0 18. O l
3. 0 19. O l
4. 0 20. 0 )
5. 0 21. 0
6. 0 22. 0 .

l

7. 0 23. O
8. 0 24. 0
9. 0 25. 0
10. 0 26. 0
11. 0 27. 0

- 12 0 28. 0

13. 0 29. 0
14. 0 30. 0
15. 0
16. 0 i

l 4

E2 i

_ _ .~

l AVERAGE DAILY UNIT POWER LEVEL DOCKET'NO. 50-260 UNIT NO. TWO DATE: Oct. 5, 1998 COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874

MONTH September 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)
1. '1058 17. 1045 i
2. 1053 18. 1059
3. 1062 19. 1055
4. 1057 20. 1057
5. 10'o 9 21. 1060
6. 1058 22. 1061 ,
7. 1053 23. 1061 4 l
8. 1058 24. 1061  ;

l 9, 1065 25. 1062 I

10. 1061 26. 1063
11. 1054 27. 1063 12 1025 28. 1060
13. 1067 29. 1058
14. 1054 30. 1063
15. 1070
16. 1054 4

E-3

.c AVERAGE DAILY-UNIT POWER LEVEL 1

e

  • DOCKET NO. 50-296 UNIT NO. THREE DATE: Oct. 5, 1998 COMPLETED-BY: J. E. Wallace TELEPHONE 256-729-7874 MONTH September 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l

DAY (MWe-Net) DAY (MWe-Net)

1. 780 17, 706
2. 776 18. 713 i 1
3. 778 19. 705
4. 774 20. 221 .

I

5. 773 21. 0
6. 773 22. 0
7. 769 23. 0
8. 768 24. 0 l l
9. 765 25. 0
10. 749 26. 0
11. 751 27. O I 12 725 28. 0 l
13. 718 29. 0 14, 729 30. 0 15, 736
16. '718 I

l E-4 l

\ ~.

OPERATING DATA REPORT Docket No'. 50-259 Date: Oct. 5.1998 Completed By: J. E. Wallace Telephone: (256)-729-7874 1.. Unit Name: BFN Unit 1

2. Reporting Period: September 1998 l
3. Licensed Thermal Power (MWt): 3293 i
4. Nameplate Rating (Gross Mwe): 1152 l
5. Design Electrical Rating (Net Mwe): 1065 l
6. ' Maximum Dependable Capacity (Gross MWe): g i
7. Maximum Dependable Capacity (Net MWe): 9 l
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If any (net MWe): 0

- 10. Reasons for Restrictions, If any: Administrative Hold This Month Yr-To-Date Cumulative *

11. Hours in Reporting Period 0 0 95743
12. Number of Hours Reactor was Critical 0 0 59521
13. Reactor Reserve Shutdown Hours 0 0 6997 ,
14. Hours Generator On-Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) _

0 0 168066787

17. Gross Electric Energy Generated (MWh) 0 0 55398130
18. Net Electrical Energy Generated (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.86
20. Unit Availability Factor 0 0 60.86
21. Unit Capacity Factor (Using MDC Net) 0 0 _.

52.76

22. Unit Capacity Factor (Using DER Net) 0 0 52.76
23. Unit Forced Outage Rate 0 0 25.57
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shutdown at End of Report Period, Estimate Date ofStartup: To Be Determined
  • Excludes hours under Administrative Hold

, (June 1,1985 to present)

E-5

1

.. I

OPERATING DATA REPORT l l

' l Docket No. 50-260 Date: Oct. 5.1998 l Completed By: J. E. Wallace l Telephone: (2561-729-7874 l

! I

1. Unit Name: BFN Unit 2  ;
2. Reporting Period: September 1998
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross Mwe): 1152
5. Design Electrical Rating (Net Mwe): 1065 l
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065 1
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if any (net MWe): N/A j
10. Reasons for Restrictions, If any: N/A This Month Yr-To-Date Cumulative *
11. Hours in Reporting Period 720.0 6551.0 154926
12. Number of Hours Reactor was Critical 720.0 6551.0 113357
13. Reactor Reserve Shutdown Hours 0.0 0.0 14200
14. Hours Generator On-Line 720.0 6551.0 110964
15. Unit Reserve Shutdown Hours 0.0 0.0 0
16. Gross Thermal Energy Generated (MWh) 2368303.0 21479840 331515324
17. Gross Electric Energy Generated (MWh) 779590.0 7151490 110153968
18. Net Electrical Energy Generated (MWh) 761639.0 _. 6988805 107194897
19. Unit Service Factor 100.0 100.0 71.6 ,
20. Unit Availability Factor 100.0 top 0 71.6
21. Unit Capacity Factor (Using MDC Net) 99.3 Ifx 2 65.0
22. Unit Capacity Factor (Using DER Net) 99.3 100.2 65.0
23. Unit Forced Outage Rate 0.0 0.0 13.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A i 25. If Shutdown at End of Report Period, Estimate Date

! cf Startup: N/A a

Excludes hours under Administrative Hold (June 1,1985 to May 24,1991)

E-6 l

l

OPERATING DATA REPORT Docket No 50-296 Date: Oct. 5.1998 Completed By: J. E. Wallace Telephone: (256)-729-7874

1. Unit Name: BFN Unit 3
2. - Reporting Period: Sentember 1998
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross Mwe): 1152
5. Design Electrical Rating (Net Mwe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (det MWe): 1065
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If any (net MWe): N/A
10. Reasons for Restrictions, If any: N/A This Month Vr-To-Date Cumulative *
11. Hours in Reporting Period 720.0 6551.0 98148
12. Number of Hours Reactor was Critical 465.0 6028.0 69102
13. Reactor Reserve Shutdown Hours 0.0 0.0 5150
14. Hours Generator O Line 465.0 6001.6 67723
15. Urit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWh) 1131137.0 18276192 205711105
17. Gross Electric Energy Generated (MWh) 357660.0 6006620 68770030
18. Net Electrical Energy Generated (MWh) 345474.0 5848825 66054323 l-
19. Unit Serv. a Factor 64.6 91.6 69.0
20. Unit Availability Factor 64.6 91.6 69.0
21. Unit Capacity Factor (Using MDC Net) 45.1 83.8 63.2
22. Unit Capacity Factor (Using DER Net) 45.1 83.8 63.2
23. Unit Forced Outage Rate 0.0 0.1 15.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 3 Cycle 8 Refueling Outage, began September 20,1998,

, with a scheduled Duration of 22 days

(

25. If Shutdown at End of Report Period, Estimate Date of Startup: October 14,1998
  • Excludes hours under Administrative Hold (June 1,1985 to November 19,1995)

E-7 l

5 UNIT SHUTDOWNS AND POWER REDUCTIONS f REPORT MONTH: SEPTEMBER 1998 -

DOCKET NO: 50-259 UNIT NAME: BFN-1 .

DATE: - October 5,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 N% 2: Datet Type' Duration; :Reasoni; Alethod;ofi . Licensee} .

~

Systent Component l '.Cause.and Corrective-Action to' Prevent.;

(Hours) - Shuttingi Event Report: Code 9 Codet Recurrence?' '

Down!

No:

Reac't6r' !

l 06/01/85 S 720 F 4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

2

  • F: Forced Reason: ' Method
  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other ,

G-Operational Error (Explain)

H-Other (Explain)

E-3

UNIT SHUTDOWNS AND POWER REDUCTIONS /.

REPORT MONTH: SEPTEMBER 1998 DOCKET NO: 50-260 UNIT NAME: BFN-2 .

DATE: October 5,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874

-N M iDate) . Type' Duration: Reason * ! . Method. of';; .Licenseel System i Component! Cause;and Corrective Action to Preventi

~(Hours).;. Shutting 5. Event Repoit . Codet Code'? l Recurrence?:

DownL  ;

Nor-Reactor'J N/A l

2

' F: Forced Reason: ' Method

  • Instnictions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-9

i UNIT SHUTDOWNS AND POWER REDUCTIONS J REPORT MONTH: SEPTEMBER 1998 DOCKET NO: 50-296 UNIT NAME: BFN-3 . -

DATE: October 5,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. !Date( Type :Durationi . Reason2J Method of- : Licensee;; -System i Component; Cause and Corrective' Actien to' Prevent A

'(Hours); Shutting!l Event Report! Coddf Codei~  ! Recurrence ?

' Down s - No3 ReactorN 10 09/20/98 S 255 C 2 N/A N/A N/A The Unit 3, Cycle 8 refueling outage began at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 20,1998. The unit is schedule for breaker closure for Cycle 9 on October 14,1998.

2

  • F: Forced Reason: ' Method
  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1622)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-10