MONTHYEARML20217F9671999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20212B8561999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With ML20210R0931999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20209H4381999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20196B8051999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20206R0731999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Bfnp.With ML20205T5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bfnp.With ML20204C7891999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20199K8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With ML20198D9621998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bfn,Units 1,2 & 3. with ML20195H1941998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20154L5081998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Browns Ferry Nuclear Plant.With ML20151Y2681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20237B5511998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20236R2551998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Brown Ferry Nuclear Plant,Units 1,2 & 3 ML20249B5711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20247Q8381998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Browns Ferry Nuclear Plant ML20216K0101998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Browns Ferry Nuclear Plant ML20216H5961998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20202G4821998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Browns Ferry Nuclear Plant ML20198T0271997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Browns Ferry Nuclear Plant ML20203J7081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20199D1431997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20198J7911997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20210V0331997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for BFN ML20217M3761997-07-31031 July 1997 Monthly Operating Repts for July 1997 for BFN ML20141H2501997-06-30030 June 1997 Monthly Operating Repts for June 1997 for BFN Per TS Section 6.9.1.3 ML20141C0631997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Browns Ferry Nuclear Plant (BFN) Units 1,2 & 3 ML20141G2471997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20137T2001997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Browns Ferry Nuclear Plant Unit 1,2 & 3 ML20137A4711997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for BFN Units 1,2 & 3 ML20134M6601997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20133M1241996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20132E2421996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20129B8841996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Browns Ferry Nuclear Plant Unit 1,2 & 3 ML20129C2471996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Browns Ferry Nuclear Plant,Unit 1 & 2 ML20129B9101996-08-31031 August 1996 Revised MOR for Aug 1996 for Browns Ferry Unit 2 ML20116M6181996-07-31031 July 1996 Monthly Operating Repts for July 1996 for BFN ML20115G4121996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brown Ferry Nuclear Plant,Units 1,2 & 3 ML20112J2081996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20112B5201996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20107G0251996-03-31031 March 1996 Monthly Operating Repts for March 1996 for Browns Ferry Nuclear Plant ML20106G9401996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20101D0311996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20096D8751995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20095K3231995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Browns Ferry Nuclear Plant ML20096D8821995-11-30030 November 1995 Revised Monthly Operating Rept for Nov 1995 for Browns Ferry Nuclear Plant Unit 3 ML20094K4561995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Browns Ferry Nuclear Plant ML20093G6131995-09-30030 September 1995 Monthly Operating Repts for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20092G3511995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Browns Ferry Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18039A9041999-10-15015 October 1999 LER 99-010-00:on 990917,automatic Reactor Scram on Turbine Stop Valve Closure Occurred.Caused by High Water Level in Main Steam Moisture Separator 2C2.Unit 2C2 Reservoir Level Transmitter & Relays Were Replaced & Tested Satisfactorily ML18039A8981999-10-14014 October 1999 LER 99-009-00:on 990915,manual Reactor Scram Was Noted Due to EHC Leak.Caused by Failure of Stainles Steel Tubing Connection.Removed Damaged Tubing & Connection Plug ML18039A8951999-10-0808 October 1999 LER 99-008-00:on 990905,HPCI Was Inoperable Due to Failed Flow Controller.Caused by Premature Failure of Capacitor 2C3.Replaced Controller & HPCI Sys Was Run IAW Sys Operating Instructions ML18039A8751999-09-30030 September 1999 LER 99-005-00:on 990901,SR for Standby Liquid Control Sampling Was Not Met.Caused by Deficient Procedure for Chemical Addition to Standby Liquid Control.Revised Procedure.With 990930 Ltr ML20217F9671999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20212E6341999-09-23023 September 1999 Suppl to SE Resolving Error in Original 990802 Se,Clarifying Fact That Licensee Has Not Committed to Retain Those Specific Compensatory Measures That Were Applied to one-time Extension ML20212D3831999-09-20020 September 1999 Safety Evaluation Supporting Proposed Rev to Withdrawal Schedule for First & Third Surveillance Capsules for BFN-3 RPV ML20212B8561999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With ML18039A8821999-08-31031 August 1999 Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept. ML18039A8391999-08-0606 August 1999 BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts. ML20210N1221999-08-0202 August 1999 Safety Evaluation Accepting Licensee Request for Relief from ASME B&PV Code,Section XI Requirements.Request 3-ISI-7, Pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210R0931999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A8201999-07-26026 July 1999 LER 99-004-00:on 990625,facility Core Spray Divisions I & II Inoperable at Same Time Due to Personnel Error.Electrical Supply Breaker to Core Spray Division II Pump 3B Returned to Normal Racked in Position ML18039A8171999-07-20020 July 1999 LER 99-007-00:on 990623,discovered That SR for Monitoring of Primary Containment Oxygen Concentration Had Not Been Met. Caused by Failure of Operators to Adequately Communicate. Required Surveillances Were Performed.With 990720 Ltr ML18039A8161999-07-19019 July 1999 LER 99-006-00:on 990618,noted That Main Steam SRV Exceeded TS Setpoint Tolerance.Caused by Pilot Vlve disc-seat Bonding.Util Replaced All 13 SRV Pilot Cartridges with Cartridges Certified to Be Witin +/-1%.With 990719 Ltr ML20209J0771999-07-16016 July 1999 Safety Evaluation Concluding That Licensee Provided Adequate Information to Resolve ampacity-related Points of Concern Raised in GL 92-08 for BFN & That No Outstanding Issues Re GL 92-08 Ampacity Issues for Browns Ferry NPP Exist ML18039A8121999-07-12012 July 1999 LER 99-005-00:on 990617,ESF Actuation & HPCI Declared Inoperable.Caused by Personnel Error.Reset HPCI & Returned Sys to Operable Status with 25 Minutes.With 990712 Ltr ML20209H4381999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A8101999-06-28028 June 1999 LER 99-004-00:on 990530,safety Features Sys Actuations Occurred Due to RPS Trip.Caused by Failure of MG Set AC Drive Motor Starter Contractor Coil.Licensee Placed 2B RPS Bus on Alternate Feed & Half Scram Was Reset ML20196F8811999-06-23023 June 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves ML18039A8071999-06-14014 June 1999 LER 99-003-00:on 990515,automatic Reactor Scram Due to Turbine Trip Was Noted.Caused by Failure of Mechanical Trip Cylinder to Latch When Hydraulically Reset.Operations Crew Stabilized Reactor Following Scram ML18039A8021999-06-14014 June 1999 LER 99-002-00:on 990501,SRs for Single CR Withdrawal During Cold SD Were Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Applicable Plant Surveillances.With 990614 Ltr ML18039A8011999-06-14014 June 1999 LER 99-001-00:on 990515,automatic Reactor Scram Occurred Due to Tt.Caused by Failure of Mechanical Trip Cylinder to Latch When Hydraulically Reset.Operations Crew Stabilized Reactor Following Scram.With 990614 Ltr ML20196B8051999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A7791999-05-0606 May 1999 LER 99-003-00:on 990408,declared Plant HPCI Sys Inoperable Due to Loose Wire.Caused by Failure to Properly Tighten Screw at Some Time in Past.Loose Wire Was Tightened ML18039A7761999-04-30030 April 1999 Revised Surveillance Specimen Program Evaluation for TVA Browns Ferry Unit 3. ML20206R0731999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Bfnp.With ML18039A7561999-04-23023 April 1999 Bfnp Risk-Informed Inservice Insp (RI-ISI) Program Submittal. ML18039A7671999-04-0808 April 1999 Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2 Cycle 11 Colr. ML18039A7461999-04-0707 April 1999 LER 99-001-00:on 990308,determined That Two Trains of Standby Gas Treatment (SGT) Were Inoperable.Caused by Trip C SGT Blower Motor Breaker.Initiated Shutdown of Plant,Reset C SGT Blower Motor Breaker & Declared Train Operable ML20205N8341999-04-0101 April 1999 Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified ML20205F9341999-04-0101 April 1999 Safety Evaluation Authorizing Licensee 990108 Relief Request PV-38,from Requirements of ASME BPV Code Section XI IST Testing,Valve Program for Plant,Units 1,2 & 3 ML20205T5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bfnp.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205S0661999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with No Status Change from Previous Update,990331, Atlas Corp ML18039A7361999-03-11011 March 1999 Rev 4 to TVA-COLR-BF2C10, Bfnp,Unit 2,Cycle 10 Colr. ML20204C7891999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A6951999-02-19019 February 1999 LER 99-002-00:on 990122,LCO Was Not Entered During Calibration Testing of 3D 480 Volt Rmov Board.Caused by Personnel Error.Tva Has Briefed Operations Personnel to Preclude Recurrence of Event.With 990219 Ltr ML18039A6871999-02-12012 February 1999 LER 99-001-00:on 990114,Unit 3 HPCI Was Noted Inoperable. Caused by Oil Leak on Stop Valve.Corrective Maint Was Performed to Repair Oil Leak.With 990212 Ltr ML18039A6931999-02-0303 February 1999 Rev 3 to TVA-COLR-BF2C10, Bfnp Unit 2 Cycle 10 Colr. ML18039A6941999-02-0303 February 1999 Rev 1 to TVA-COLR-BF3C9, Bfnp Unit 3 Cycle 9 Colr. ML18039A6671998-12-31031 December 1998 LER 98-004-00:on 981202,SR Intent Was Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Procedures to Provide Proper SR Implementation.With 981231 Ltr ML18039A6661998-12-31031 December 1998 Ro:On 981215,HRPCRM 2-RM-90-273C Was Declared Inoperable. Caused by Downscale Indication.Containment RM Will Be Utilized as Planned Alternate Method of Monitoring Until Hrpcrm 2-RM-90-273C Can Be Returned to Operable Status ML20199K8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With ML20199F2721998-12-31031 December 1998 ISI Summary Rept (NIS-1), for BFN Unit 3,Cycle 8 Operation ML18039A6471998-12-15015 December 1998 LER 98-007-00:on 981116,unplanned ESF Following Loss of 4kV Unit Board 3B Occurred.Caused by Temporary Energization of Lockout Relay on 4kV Unit Board 3B When Resistor on Relay Monitoring Lamp Circuit Shorted.Replaced Resistor ML18039A6371998-12-0707 December 1998 LER 98-006-00:on 981116,MSSR Valves Exceeded TS Setpoint Tolerance.Caused by Pilot Valve Disc/Seat Bonding. Installed SRV Pressure Switches During Unit 3,cycle 8 Outage.With 981207 Ltr ML20199F2791998-12-0303 December 1998 Bfnp Unit 3 Cycle 8 ASME Section XI NIS-2 Data Rept ML20198D9621998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bfn,Units 1,2 & 3. with ML18039A6071998-11-12012 November 1998 LER 98-005-00:on 981014,mode Changes Not Allowed by TS 3.0.4 Were Made During Reactor Startup.Caused by TS LCO 3.0.4 Not Being Properly Applied.Training Info Memo Re Proper Application for TS LCO 3.0.4 Was Prepared.With 981112 Ltr 1999-09-30
[Table view] |
Text
-. -. . .
. . 1 RA Tennessee Valley Authonty. Post Office Box 2000, Decatur. Atabama 35609 I
December 14, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 4 Washington, D.C. 20555 Gentlemen:
In the Matter of ) Docket Nos. 50-259
, Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - NONTHLY OPERATING REPORT FOR THE MONTH OF NOVEMBER 1995 1
In accordance with the requirements of BFN Units 1, 2, and 3 Technical Specifications, Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of November 1995 in the enclosure.
.) If you have any questions, please call me at (205) 729-26.36.
Sinc rely, ,
eA/o Salas anager of Site Licensing Enclosure cc: See page 2 28606h
- g22ggg gagg5, m r
a g, u ,
l l
U.S. Nuclear Regulatory Commission j Page 2 December.14, 1995
! Enclosure 3_ cc (Enclosure):
Mr. Mark S. Lesser, Branch Chief
. U.S.. Nuclear Regulatory Commission
- Region II i 101 Marietta Street, NW, Suite 2900 l Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director
~
Project Directorate II-4 Division of Reactor Projects I-II 4 Office of Nuclear Reactor Regulation, Mail 13 H3
- Washington, D.C. 20555 i
i INPO Records Center l Institute of Nuclear Power Operations l 700 Galleria Parkway i- Atlanta, Georgia 30339-5957 i Mr. Jim Lang Director of Engineering and Operations
- Electric Power Research Institute P. O. Box 10412 j Palo Alto, California 94304 l I
f NRC Resident Inspector i I
- Browns Ferry Nuclear Plant 10833 Shaw Road i Athens, Alabama 35611 l
\
Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 I
' Atlanta, Georgia 30323 l
Mr. Fred Yost, Director of Research
}'
Utility Data Institute 1200 G Street, NW Washington, D.C. 20005-3802 4
4 4
. . l ENCLOSURE TENNESSEE VALLEY AUTHORITY I BROWNS FERRY NUCLEAR PLANT (BFN) !
UNITS 1, 2, AND 3 MONTHLY OPERATING REPORT NOVEMBER 1995 i
l (SEE ATTACHED) i i
)
1 4
4 1
1 1
l
l OPERATIONAL
SUMMARY
. IIO7 EMBER 1995 1
BROWN 8 FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold
, since June 1, 1985. As a result, TVA considers that accrual j of reporting hours is suspended since the unit has a maximum i dependable capacity of 0 MWe, Accordingly, TVA does not consider
- cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.
~
1
! BROWN 8 FERRY 2 1
During the month Unit 2 operated at a capacity factor of 101.6 percent and generated 797,470 megawatt hours gross electrical
- power. As of November 30, 1995, Unit 2 has operated continuously for 102 days.
) BROWN 8 FERRY 3 i
After being shutdown and on administrative hold since June 1, 4
1985, the Unit 3 reactor was restarted and declared critical at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on November 19, 1995. During the month Unit 3 operated at a capacity factor of 24.2 percent and generated 24,020 megawatt hours gross electrical power. The unit was online for 66.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The remainder of the period (209.23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br />) was spent in scheduled power ascension testing.
l
]
1 L
l 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 UNIT: BROWNS FERRY 1 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 MONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) 1 1 0 16 0 l
l 2 0 17 0 3 0 18 0 4 0 19 0 5 0 20 0 6 0 21 0 7 0 22 0 8 0 23 0 9 0 24 0 10 0 25 0 11 0 26 0 12 0 27 0 13 0 28 0 14 0 29 0 15 0 30 0
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY T. R. Smith TELEPHONE: (205) 729-295).
HONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1124 16 1102 2 1080 17 1063 l 3 1082 18 1044 4 1084 19 1111 5 1078 20 1072 6 1088 21 1085 7 1101 22 1072 8 1110 23 1085 9 1043 24 1087 10 1086 25 1082 11 1013 26 1081 12 1105 27 1091 13 1069 28 1084 14 1078 29 1084 15 1091 30 1083
i .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-296 UNIT: BROWNS FEBRY 3 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 I
HONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (HWe-Net) 1 0 16 0 2 0 17 0 1
3 0 18 0 4 0 19 0 5 0 20 0 l
6 0 21 0
'l 0 22 0 8 0 23 0 9 0 24 0 10 0 25 0 11 0 26 190 12 0 27 209 1
13 0 28 0 14 0 29 44 15 0 30 496
1 5 5 e e
Y 9 t A
V s
n
~
R h 2 n T e R t - ;
s c
E i 9 ;
u i
L F m 2 i o S 7 P i f 9 S o r a o 5 N . ) t v n 2 W R
- O 5
0 n
o e v
i o) t2 0 R . 2 i l a2 5 B T f t e cc o r0 s a1 p-An e
- : : : ere r eG rE vr o P RU OTYE i u t c t
rN NIBN ce d o(
N O eR r
l f s
TUDH r ha o .
st E EP o n nr K RE C er ve oo p C AL d i c i
t e O PE n t n cR D ET a ao u R e t rc rt t n P s sC s e u
a iR nN I nvE C '
imd dn Aa e
g t a t
S u N e O O o I 5 T 99 C 1 P W*d C i
t g
n s
U i x
D E R E R EB m
e 'e mf ao td RM s yCo mcn r
E E S aso r i WO V cct n O siao PN .
ll ant t ui o : aamicr D e do uuot N st N ht MMACRO nnt andh aauoet e
A nnt ee r S
cv iEp o e-M123459 L e '
N W:H R O n D T o TN O r i t
U M f o gt o a H n ca i n
ST d i ot et 4 m a
T RO hu t R E x
I e hn M s u N P o e U ER D )
s n )
n e n i c i a i a
'no l p n od L l p
x s F x i n E a E (
( ts t a e c R ee rT i g rn r
o u r ti r) l snern n i o eivEi a
a R ai i o )s F ec rtl l t r 0 yT aap a u 2 t ngr rnx r o 7 nanort oE uN e nit osi(
m el atit D( pt el anar i nuurire
@ifa egemeh e pd pt
'ep E- MRROAoO S
y 'A BCDEFGN T
5 8
e /
t 1 a 0 d D / e 6 t 0 d a ed crhe o
1 oc F s N
'F s-l i llllil!llllI ll
F UNIT SHUTDOt1NS AND POWER REDUCTIONS DOCKET NO: 50-260 REPORT MONTH: NOVEMBER 1995 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. Smith .
TELEPHONE: (205) 729-2955 e4 Method of License Duration Shutting Event System en-p,=wnt Cause and Corrective Action to Prevent No. Date Type' (Nours) Reason' Down Reactor' ,
gArtNo. Code' Code
[
I
'F-Forced 'A-E pipment Falture (Explain) ' Method: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)
C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain)
._ _ _ . _ _ _ . . . _ _ _ _ .. . _ . . _ . _ _ _ _ . . . -___._...-.m____ ..__...m___ _m_._. . .-
l . ,
i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-296 REPORT MONTH: NOVEMBER 1995 UNIT: BROWNS FERFI 3 PREPARED BY: T. R. Smith .
TELEPHONE: (205) 729-2955 Method of License i
Duration Shuttine Event System rwt cause and Corrective Action to Prevent
! No. Date Type' (Hours) Reason
- Doun Reactor' Report No. Code' Code
- Recurrence 1 11/25/95 F 7 5 5 Tripped main turbine due to excessive vibration 2 11/26/95 F 1 5 5 Tripped main turbine for maintenance on main generator current transfoneer circuits 3 11/26/95 s 2 5 5 Tripped main turbine to perform overspeed test 4 11/27/95 s 48 8 2. Manual scram of unit 3 reactor required by testing schedute. Also main generator had insufficient cooling flow through the exciter cooler.
L i
'F-Forced 'A-Equipment Falture (Explain) ' Method:
- Instructions for Preparation of Licensee 5-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)
C-Refueling 2-Manuet scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-operational Error (Explain) 9-Other M-Other (Emplain)
1 -
l OPERATING DATA REPORT i
4 DOCKET: 50-259 UNIT: BROWNS FERRY 1 l
PREPARED BY: T. R. SMITH
- TELEPHONE: (205) 729-2955 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT 1
- 2. Reporting Periods NOVEMBER 1995 ,
- 3. Licensed Thermal Power (MWt): 3293 )
- 4. Nameplate Rating (Gross MWe): 1152 )
- 5. Design Electrical Rating (Net HWe): 1065 l
- 6. Maximum Dependable capacity (Gross NWe): 0
- 7. Maximum Dependable Capacity (Net MWe): 0 l
- 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
- 9. Power Level To which Rest ricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any: Administrative Hold THIS MONTE YEAR TO DATE CUMULATIVE *
- 11. Hours in Reporting Period 0 0 95743
- 12. Hours Reactor Was critical 0 0 59521
- 13. Reactor Reserve Shutdown Hours 0 0 6997
- 14. Hours Generator On Line 0 0 58267
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Generation (MWh) 0 0 168066787 j
- 17. Gross Electrical Generation (MWh) 0 0 55398130 l
- 18. Net Electrical Generation (MWh) 0 0 53796427
- 19. Unit Service Factor 0 0 60.9
- 20. Unit Availability Factor 0 0 60.9
- 21. Unit Capacity Factor (MDC Net) 0 0 52.8
- 22. Unit Capacity Factor (DER net) 0 0 52.8
- 23. Unit Forced Outage Rate 0 0 25.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
- Excludes hours under administrative told (June 1, 1985 to present)
f l
OPERATING DATA REPORT l
DOCKET: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 1
OPERATING STATUS I
- 1. Unit Names BROWNS FERRY UNIT 2 ]
- 2. Reporting Period: NOVEMBER 1995 1
- 3. Licensed Thermal Power (MWt): 3293 1
- 4. Nameplate Rating (Gross MWe): 1152 ;
- 5. Design Electrical Rating (Not MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Not MWe): 1065
- 8. .If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Not MWe): N/A
- 10. Reason For Restrictions, If Any N/A 4
THIS MONTE YEAR TO DATE CUMULATIVE
- s i 11. Hours in Reporting Period 720 8016 130087
- 12. Hours Reactor Was critical 720 7908 90035
- 13. Reactor Reserve Shutdown Hours 0 0 14200
- 14. Hours Generator On Line 720 7884 87744
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Generation (MWh) 2360902 25751931 256920846 4
- 17. Gross Electrical Generation (MWh) 797470 8606960 85350138
- 18. Net Electrical Generation (MWh) 779010 8400922 82990758
- 19. Unit Service Factor 100.0 98.4 67.4 4
- 20. Unit Availability Factor 100.0 98.4 67.4 i 21. Unit Capacity Factor (MDC Net) 101.6 98.4 59.9
- 22. Unit Capacity F?ctor (DER net) 101.6 98.4 59.9
- 23. Unit Forced Outage Rate 0.0 1.6 16.1
- 24. Shutdowns Scheduled Over Next 6 Months
- Refueling Outage; March 23, 1996; 30 days
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A i
!
- Excludes hours under administrative hold (June 1, 1985 to May 24, 1991) l l
1 l J
l L ____ l
~. ~ . _ - - _ . --._- .-
oa
. N -
OPERATING DATA REPORT DOCKET: 50-296 UNIT: BROWNS FERRY 3 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT 3
- 2. Reporting Periods NOVEMBER 1995
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: Items 6 and 7 changed from 0 to 1098.4 and 1065 respectively due to Unit 3 restarting after being shutdown and on administrative hold from June 1, 1985 to November 19, 1995.
- 9. Power Level To Which Restricted, If Any (Not MWe): N/A
- 10. Reason For Restrictions, If Any: N/A I
i TEIS MONTE YEAR TO DATE CUMULATIVE *
- 11. Hours in Reporting Period 276.0 276 73331 i 12. Hours Reactor Was critical 244.8 245 45551 l 13. Reactor Reserve Shutdown Hours 0.0 0 5150
? 14. Hours Generator On Line 66.7 67 44261
- 15. Unit Reserve Shutdown Hours 0.0 0 0 l 16. Gross Thermal Generation (MWh 135744.0 135744 132004011 l 17. Gross Electrical Generation (MWh) 24020.0 24020 43497780
, 18. Net Electrical Generation (MWh) 15993.0 15993 42130002 I 19. Unit Service Factor 24.2 24.2 60.4 4 20. Unit Availability Factor 24.2 24.2 60.4
- 21. Unit Capacity Factor (MDC Net) 5.4 5.4 53.9
! 22. Unit Capacity Factor (DER net) 5.4 5.4 53.9 j 23. Unit Forced Outage Rate 0.0 0.0 21.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, l
Estimated Date of Startup: N/A l
- Excludes hours under administrative hold (June 1, 1985 to November 19, 1995) i
!