. . 1 RA Tennessee Valley Authonty. Post Office Box 2000, Decatur. Atabama 35609 I

December 14, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 4 Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259

, Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - NONTHLY OPERATING REPORT FOR THE MONTH OF NOVEMBER 1995 1

In accordance with the requirements of BFN Units 1, 2, and 3 Technical Specifications, Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of November 1995 in the enclosure.

.) If you have any questions, please call me at (205) 729-26.36.

Sinc rely, ,

eA/o Salas anager of Site Licensing Enclosure cc: See page 2 28606h

g22ggg gagg5, m r

a g, u ,

l l

U.S. Nuclear Regulatory Commission j Page 2 December.14, 1995

! Enclosure 3_ cc (Enclosure):

Mr. Mark S. Lesser, Branch Chief

. U.S.. Nuclear Regulatory Commission

Region II i 101 Marietta Street, NW, Suite 2900 l Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director

~

Project Directorate II-4 Division of Reactor Projects I-II 4 Office of Nuclear Reactor Regulation, Mail 13 H3

Washington, D.C. 20555 i

i INPO Records Center l Institute of Nuclear Power Operations l 700 Galleria Parkway i- Atlanta, Georgia 30339-5957 i Mr. Jim Lang Director of Engineering and Operations

Electric Power Research Institute P. O. Box 10412 j Palo Alto, California 94304 l I

f NRC Resident Inspector i I

Browns Ferry Nuclear Plant 10833 Shaw Road i Athens, Alabama 35611 l

\

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 I

' Atlanta, Georgia 30323 l

Mr. Fred Yost, Director of Research

}'

Utility Data Institute 1200 G Street, NW Washington, D.C. 20005-3802 4

4 4

. . l ENCLOSURE TENNESSEE VALLEY AUTHORITY I BROWNS FERRY NUCLEAR PLANT (BFN)  !

UNITS 1, 2, AND 3 MONTHLY OPERATING REPORT NOVEMBER 1995 i

l (SEE ATTACHED) i i

)

1 4

4 1

1 1

l

  • l l

l OPERATIONAL

SUMMARY

. IIO7 EMBER 1995 1

BROWN 8 FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold

, since June 1, 1985. As a result, TVA considers that accrual j of reporting hours is suspended since the unit has a maximum i dependable capacity of 0 MWe, Accordingly, TVA does not consider

cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

~

1

! BROWN 8 FERRY 2 1

During the month Unit 2 operated at a capacity factor of 101.6 percent and generated 797,470 megawatt hours gross electrical

power. As of November 30, 1995, Unit 2 has operated continuously for 102 days.

) BROWN 8 FERRY 3 i

After being shutdown and on administrative hold since June 1, 4

1985, the Unit 3 reactor was restarted and declared critical at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on November 19, 1995. During the month Unit 3 operated at a capacity factor of 24.2 percent and generated 24,020 megawatt hours gross electrical power. The unit was online for 66.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The remainder of the period (209.23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br />) was spent in scheduled power ascension testing.

l

]

1 L

l 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 UNIT: BROWNS FERRY 1 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 MONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) 1 1 0 16 0 l

l 2 0 17 0 3 0 18 0 4 0 19 0 5 0 20 0 6 0 21 0 7 0 22 0 8 0 23 0 9 0 24 0 10 0 25 0 11 0 26 0 12 0 27 0 13 0 28 0 14 0 29 0 15 0 30 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY T. R. Smith TELEPHONE: (205) 729-295).

HONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1124 16 1102 2 1080 17 1063 l 3 1082 18 1044 4 1084 19 1111 5 1078 20 1072 6 1088 21 1085 7 1101 22 1072 8 1110 23 1085 9 1043 24 1087 10 1086 25 1082 11 1013 26 1081 12 1105 27 1091 13 1069 28 1084 14 1078 29 1084 15 1091 30 1083

i .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-296 UNIT: BROWNS FEBRY 3 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 I

HONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (HWe-Net) 1 0 16 0 2 0 17 0 1

3 0 18 0 4 0 19 0 5 0 20 0 l

6 0 21 0

'l 0 22 0 8 0 23 0 9 0 24 0 10 0 25 0 11 0 26 190 12 0 27 209 1

13 0 28 0 14 0 29 44 15 0 30 496

1 5 5 e e

Y 9 t A

V s

n

~

R h 2 n T e R t -  ;

s c

E i 9  ;

u i

L F m 2 i o S 7 P i f 9 S o r a o 5 N . ) t v n 2 W R

- O 5

0 n

o e v

i o) t2 0 R . 2 i l a2 5 B T f t e cc o r0 s a1 p-An e

: : : ere r eG rE vr o P RU OTYE i u t c t

rN NIBN ce d o(

N O eR r

l f s

TUDH r ha o .

st E EP o n nr K RE C er ve oo p C AL d i c i

t e O PE n t n cR D ET a ao u R e t rc rt t n P s sC s e u

a iR nN I nvE C '

imd dn Aa e

g t a t

S u N e O O o I 5 T 99 C 1 P W*d C i

t g

n s

U i x

D E R E R EB m

e 'e mf ao td RM s yCo mcn r

E E S aso r i WO V cct n O siao PN .

ll ant t ui o  : aamicr D e do uuot N st N ht MMACRO nnt andh aauoet e

A nnt ee r S

cv iEp o e-M123459 L e '

N W:H R O n D T o TN O r i t

U M f o gt o a H n ca i n

ST d i ot et 4 m a

T RO hu t R E x

I e hn M s u N P o e U ER D )

s n )

n e n i c i a i a

'no l p n od L l p

x s F x i n E a E (

( ts t a e c R ee rT i g rn r

o u r ti r) l snern n i o eivEi a

a R ai i o )s F ec rtl l t r 0 yT aap a u 2 t ngr rnx r o 7 nanort oE uN e nit osi(

m el atit D( pt el anar i nuurire

@ifa egemeh e pd pt

'ep E- MRROAoO S

y 'A BCDEFGN T

5 8

e /

t 1 a 0 d D / e 6 t 0 d a ed crhe o

1 oc F s N

'F s-l i llllil!llllI ll

F UNIT SHUTDOt1NS AND POWER REDUCTIONS DOCKET NO: 50-260 REPORT MONTH: NOVEMBER 1995 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. Smith .

TELEPHONE: (205) 729-2955 e4 Method of License Duration Shutting Event System en-p,=wnt Cause and Corrective Action to Prevent No. Date Type' (Nours) Reason' Down Reactor' ,

gArtNo. Code' Code

  • Recurrence N/A t

[

I

'F-Forced 'A-E pipment Falture (Explain) ' Method: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain)

._ _ _ . _ _ _ . . . _ _ _ _ .. . _ . . _ . _ _ _ _ . . . -___._...-.m____ ..__...m___ _m_._. . .-

l . ,

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-296 REPORT MONTH: NOVEMBER 1995 UNIT: BROWNS FERFI 3 PREPARED BY: T. R. Smith .

TELEPHONE: (205) 729-2955 Method of License i

Duration Shuttine Event System rwt cause and Corrective Action to Prevent

! No. Date Type' (Hours) Reason

  • Doun Reactor' Report No. Code' Code
  • Recurrence 1 11/25/95 F 7 5 5 Tripped main turbine due to excessive vibration 2 11/26/95 F 1 5 5 Tripped main turbine for maintenance on main generator current transfoneer circuits 3 11/26/95 s 2 5 5 Tripped main turbine to perform overspeed test 4 11/27/95 s 48 8 2. Manual scram of unit 3 reactor required by testing schedute. Also main generator had insufficient cooling flow through the exciter cooler.

L i

'F-Forced 'A-Equipment Falture (Explain) ' Method:

  • Instructions for Preparation of Licensee 5-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manuet scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-operational Error (Explain) 9-Other M-Other (Emplain)

1 -

l OPERATING DATA REPORT i

4 DOCKET: 50-259 UNIT: BROWNS FERRY 1 l

PREPARED BY: T. R. SMITH

- TELEPHONE: (205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 1
2. Reporting Periods NOVEMBER 1995 ,
3. Licensed Thermal Power (MWt): 3293 )
4. Nameplate Rating (Gross MWe): 1152 )
5. Design Electrical Rating (Net HWe): 1065 l
6. Maximum Dependable capacity (Gross NWe): 0
7. Maximum Dependable Capacity (Net MWe): 0 l
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
9. Power Level To which Rest ricted, If Any (Net MWe): 0
10. Reason For Restrictions, If Any: Administrative Hold THIS MONTE YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 0 0 95743
12. Hours Reactor Was critical 0 0 59521
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator On Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Generation (MWh) 0 0 168066787 j
17. Gross Electrical Generation (MWh) 0 0 55398130 l
18. Net Electrical Generation (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9
20. Unit Availability Factor 0 0 60.9
21. Unit Capacity Factor (MDC Net) 0 0 52.8
22. Unit Capacity Factor (DER net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
  • Excludes hours under administrative told (June 1, 1985 to present)

f l

OPERATING DATA REPORT l

DOCKET: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 1

OPERATING STATUS I

1. Unit Names BROWNS FERRY UNIT 2 ]
2. Reporting Period: NOVEMBER 1995 1
3. Licensed Thermal Power (MWt): 3293 1
4. Nameplate Rating (Gross MWe): 1152  ;
5. Design Electrical Rating (Not MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Not MWe): 1065
8. .If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Not MWe): N/A
10. Reason For Restrictions, If Any N/A 4

THIS MONTE YEAR TO DATE CUMULATIVE

  • s i 11. Hours in Reporting Period 720 8016 130087
12. Hours Reactor Was critical 720 7908 90035
13. Reactor Reserve Shutdown Hours 0 0 14200
14. Hours Generator On Line 720 7884 87744
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Generation (MWh) 2360902 25751931 256920846 4
17. Gross Electrical Generation (MWh) 797470 8606960 85350138
18. Net Electrical Generation (MWh) 779010 8400922 82990758
19. Unit Service Factor 100.0 98.4 67.4 4
20. Unit Availability Factor 100.0 98.4 67.4 i 21. Unit Capacity Factor (MDC Net) 101.6 98.4 59.9
22. Unit Capacity F?ctor (DER net) 101.6 98.4 59.9
23. Unit Forced Outage Rate 0.0 1.6 16.1
24. Shutdowns Scheduled Over Next 6 Months
Refueling Outage; March 23, 1996; 30 days
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A i

!

  • Excludes hours under administrative hold (June 1, 1985 to May 24, 1991) l l

1 l J

l L ____ l

~. ~ . _ - - _ . --._- .-

oa

. N -

OPERATING DATA REPORT DOCKET: 50-296 UNIT: BROWNS FERRY 3 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 3
2. Reporting Periods NOVEMBER 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: Items 6 and 7 changed from 0 to 1098.4 and 1065 respectively due to Unit 3 restarting after being shutdown and on administrative hold from June 1, 1985 to November 19, 1995.
9. Power Level To Which Restricted, If Any (Not MWe): N/A
10. Reason For Restrictions, If Any: N/A I

i TEIS MONTE YEAR TO DATE CUMULATIVE *

11. Hours in Reporting Period 276.0 276 73331 i 12. Hours Reactor Was critical 244.8 245 45551 l 13. Reactor Reserve Shutdown Hours 0.0 0 5150

? 14. Hours Generator On Line 66.7 67 44261

15. Unit Reserve Shutdown Hours 0.0 0 0 l 16. Gross Thermal Generation (MWh 135744.0 135744 132004011 l 17. Gross Electrical Generation (MWh) 24020.0 24020 43497780

, 18. Net Electrical Generation (MWh) 15993.0 15993 42130002 I 19. Unit Service Factor 24.2 24.2 60.4 4 20. Unit Availability Factor 24.2 24.2 60.4

21. Unit Capacity Factor (MDC Net) 5.4 5.4 53.9

! 22. Unit Capacity Factor (DER net) 5.4 5.4 53.9 j 23. Unit Forced Outage Rate 0.0 0.0 21.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, l

Estimated Date of Startup: N/A l

  • Excludes hours under administrative hold (June 1, 1985 to November 19, 1995) i

!