ML20132E242
| ML20132E242 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 11/30/1996 |
| From: | Abney T, Davenport J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9612230176 | |
| Download: ML20132E242 (13) | |
Text
.
l i
Tennessee Vallt / Authonty. Post Office Dox 2000, Decatur. Alabama 35609 December 11, 1996 i
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 i
Tennessee Valley Authority
)
50-260 j
50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT ET>R THE MONTH OF NOVEMBER 1996 In accordance with the requirements of BFN Units 1, 2,
and 3 l
Technical Specifications, Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of November 1996 in the enclosure.
If you have any questions, please call me at (205) 729-2636.
dcerely,,,(
S f.
h T.
E. Abney Manager of Lic sin and Industry ffa rs i
Enclosure cc:
See page 2
.. l} L} /}
- b. o
~'
9612230176 961130 l
PDR ADOCK 05000259 1
R PDR
...-._.__..-_..___.m.._.m.
.. y I
l t
U.S. Nuclear Regulatory Commission l
Page 2 l
[
December 11, 1996 I
l Enclosure i
cc (Enclosure):
l L
Mr. Mark S. Lesser,. Branch Chief i
i U.S. Nuclear Regulatory Commission l
Region II.
l l
101 Marietta Street, NW, Suite 2900 L
' Atlanta, Georgia 30323 l
Mr. Frederick J. Hebdon, Director l
Project Directorate II-4 L
Division of Reactor Projects I-II i
Office of Nuclear Reactor l
7 L
Regulation, Mail 13 H3 l
Washington, D.C. 20555 INPO Records Center Institute of Nuclear Power Operaticas 700 Galleria Parkway l
Atlanta, Georgia 30339-5957 i
Mr. Jim Lang I
' Director of Engineering and Operations Electric Power Research Institute P.-O. Box-10412 Palo Alto, California 94304 i
NRC Resident Inspector Browns Ferry Nuclear Plant i
10833 Shaw Road i
Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Ms. Elizabeth Hannon Utility Data Institute 1200 G Street, NW l
Washington, D.C. 20005-3802 i
c i
i d
. - _. -.. = _.... - -.. _ _, -
1 a
]
ENCLOSURE l
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2,
AND 3 NONTHLY OPERATING REPORT l
NOVEMBER 1996 4
I
}
(SEE ATTACHED) i 5
l i
i l
1 i
i
l i
i OPERATIONAL SUbMARY NOVEMBER 1996 l
d l
BROWNS FERRY 1 i
Unit I remains shutdown on administrative hold to resolve various TVA and NRC concerns.
Unit 1 has been on administrative hold since June 1, 1985.
As a result, TVA considers that accrual of reporting hours is suspended since the unit has a j
maximum dependable capacity of zero MWe, Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.
BROWNS FERRY 2 For the month of November, Unit 2 generated 702,540 megawatt
)
hours gross electrical power and operated at a net capacity factor of 89.4 percent.
On October 29, 1996, at approximately 1538 hours0.0178 days <br />0.427 hours <br />0.00254 weeks <br />5.85209e-4 months <br />, a full reactor scram on control valve fast closure occurred.
The unit remained shutdown for maintenance until November 3, 1996.
As of November 30, 1996, Unit 2 has operated continuously for 28 days.
BROWNS FERRY 3 For_the month of November, Unit 3 generated 791,270 megawatt hours gross electrical power and operated at a net capacity factor of 100.6 percent.
As of November 30, 1996, Unit 3 has operated continuously for 75 days.
l
i i
AVERAGE DAILY UNIT POWER LEV.'L DOCKET NO:
50-259 UNIT:
BROWNE FERRY 1 PREPARED BY J.
W.
Davennort TELEPHONE:
f205) 729-2690 MONTH NOVEMEER 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
l 2
0 17 0
l 3
0 18 0
l 4
0 19 0
l l
5 0
20 0
4 l
6 0
21 0
7 0
22 0
8 o
23 0
j i
i 9
0 24 0
10 0
25 0
11 0
26 0
12 0
27 0
1 13 0
28 0
j l
i 14 0
29 0
1 15 0
30 0
]
i i
)
}.
i s
f
I i
i h
AVERAGE DAILY UNIT POWER LEVEL j
i DOCKET NO:
50-260 i
UNIT:
BROWNS FERRY 2 I
PREPARED BY:
J.
W.
Davannert TELEPHONE:
(205) 729-2690 I
MONTH NOVEMBER 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 1089 2
0 17 1078 3
85 18 1088 4
796 19 1090 l
i 5
1035 20 1086 6
1025 21 1088 1
7 996 22 1093 8
1060 23 897 9
1058 24 947 10 1098 25 1094 1
11 1086 26 1094 j
12 1089 27 1091 13 1089 28 1075 1
14 1089 29 1088 i
15
.> a fag 5
~"
^
J I
AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO:
50-296 UNIT BRNME FERRY 3 PREPARED BY:
J.
W.
Davenoort TELEPHONE:
(205) 729-2690 l
MONTH NOVEMRPR 1996 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1133 16 1092 2
2 1089 17 1074 I
3 1082 18 1048 4
1091 19 1094 4
5 1091 20 1089 6
1083 21 1090 l
1 7
1092 22 1090 i
8 1072 23 1084 1
l 9
1081 24 1070 10 1060 25 1090 11 1091 26 1066 I
12 1093 27 1074 13 1094 28 1058 14 1093 29 1042 15 1091 30 757
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-259
~.
REPORT MONTH:
NOVEMRs*R 1996 UNIT: BROWNS FERRY l PREPARED BY:
J.
W.
Davenoort TELEPHONE:
f2051 729-2690 Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.
Date Type' (Mours)
RessorY Down Reactor' Report No.
Code
- Code' Recurrence l
1 06/01/85 S
720 F
4 Administrative hold to resolve various TVA and NRC concerns.
'F-Forced
'A Equipuu:nt Failure (Explain)
' Method:
" Instructions for Preparation of Licensee S-Scheduled g-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)
C-Refueling 2-Manuel Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction G-Operational Error (Explain) 9-Other h-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-260 REPORT MONTH:
NOVEMarR 1996 UNIT BROWNS FERRY 2 PREPARED BY:
J.
W.
Davenoort TELEPHONE:
f205) 729-2690 Method of License Duration Shutting Event system Component cause and Corrective Action to Prevent No.
Date Type (Hours)
Reason' Down Reactor Report No.
Code
- Code' Recurrence l
8 4
11/01/96 F
65 A
4 260/96007 TL EXC on 10/29/ %, at approximately 1538 hours0.0178 days <br />0.427 hours <br />0.00254 weeks <br />5.85209e-4 months <br />, a full reactor scram on control valve fast closure occurred. On 11/01/% the unit remained shutdown for meintenance. The imit restarted on 11/03/96 with breaker closure at 1718 hours0.0199 days <br />0.477 hours <br />0.00284 weeks <br />6.53699e-4 months <br />.
t
'F-Forced A-Equipment Failure (Explain)
' Method:
' instructions for Preparation of Licensee 5-Scheduled 8-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)
C-Refuellrg 2-Manual scram 0-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-operational Error (Explain) 9-Other M-Other (Explain)
t 3
r 0 o 9 e
Y n
6 t
e n
R n
2 e
ns R
e v
e E v 9 e
e c
r v
T a
2 P
i.
i L
D 7
re o
Dc f
6 S
t n
o 9
N 1
da 2
W W 5
n on n
o R e o
O 0
i t
i) 0 R
. 2 t e l n t2 cc oi a2 5
BJf An ra r0 e
t m a1 er n
p-vr od eG
- : : t iu C e rE OTYE t c t
P R NI BN ce r:2 U
eR od rN N
O r
f e o(
TUDH r
h f
o nc s
E EP C
os st K
RE i
n r C
AL d
td o o n
cn p
O PE a
ua t
i e
D ET d
cR e
ee u
R s
rs rt P
u i
n t
a rc s e C
er n v we E
I ox Pe t
e n
g S
e e
N n 'e A
+
O od
/
u po N
O I
mC T 6 o
g 9
C C
n 9
i U 1 t
D s
E R m 'e ix R
e A
E E
td
/
R B s o N
mf M
yC ao s
r E
E W
mcn V
aso O
r i
O P
cct n N
siao D
e o t ui N
lt ant st aemicr N
nn A
duuot t
J e A
ee
/
nnt ndh r
cv o N
o aauoet h
iE p t
MMACRO S
L e
%123459 N
R WO:H DT TN
'r n
U o
H O f
o gt i
o n c a
t M
S d ia n
t e 5
i o
T T t R m
h u R
t a
I h n e
O Msw Ex N P o
U D
e ER sn
)
)n e
n c
1
'n i
4 i
a o
L l
s 8
p n
R t
iod a
a x
e n
L E
t a
(
(
s c
e e i g r
rT rn o
n u
ti r) r snern o )s t
i l o eivEi u
1 a
R ai a
r t
e rtl l a
F o
6 c
yT aap ruH 2
t ngr rnx D(
n anort oE e nit osi(
m el ati t pt el anar nuurire iuif gem eh l e q a e e pd pt p
3 MRROAOO y
E T
A 8CDEFGM e
/
t 9
a 2
D
/
1 d
1 e
l du ed c e o
9 rh N
o c S
F S
i F
OPERATING DATA REPORT DOCKET:
50-259 UNIT:
BROWNS FERRY 1 PREPARED BY:
J.
W.
Davenoort TELEPHONE:
(205) 729-2690 OPERATING STATUS
- 1. Unit Names BROWMS FERRY UNIT 1
- 2. Reporting Periods NOVEMBER 1996
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable capacity (Gross MWe):
0
- 7. Maximum Dependable Capacity (Not MWe):
0
- 8. If Changes occur it Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any: Administrative Bold THIS MONTE YEAR TO DATE CUMULATIVE
- j
- 11. Hours in Reporting Period 0
0 95743
- 12. Hours Reactor Was Critical 0
0 59521
- 13. Reactor Reserve Shutdown Hours 0
0 6997
- 14. Hours Generator On Line 0
0 58267
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Generation (MWh) 0 0
168066787
- 17. Gross Electrical Generation (MWh) 0 0
55398130
- 18. Net Electrical Generation (MWh) 0 0
53796427
- 19. Unit Service Factor 0
0 60.9
- 20. Unit Availability Factor 0
0 60.9
- 21. Unit Capacity Factor (MDC Net) 0 0
52.8
- 22. Unit Capacity Factor (DER net) 0 0
52.8
- 23. Unit Forced Outage Rate 0
0 25.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup To Be Determined
- Excludes hours under administrative hold (June 1, 1985 to present)
l OPERATING DATA REPORT l
DOCKET:
50-260 UNIT:
BROWNS FERRY 2 PREPARED BY:
J.
W.
Davenoort i
TELEPHONE:
(205) 729-2690 OPERATINE STATUS
- 1. Unit Names BROWNS FERRY UNIT 2
- 2. Reporting Periods NOVEMBER 1996
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. Maximum Dependable Capacity (Net MWe):
1065 8.
If Changes Occur in Capacity Ratir.gs (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A l
- 10. Reason For Restrictions, If Any: N/A THIS NONTH YEAR TO DATE CUNULATIVE*
- 11. Hours in Reporting Period 720.0 8040.0 138871
- 12. Hours Reactor Was Critical 666.0 7126.0 97905
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 14200
- 14. Hours Generator On Line 655.0 7051.0 95539
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0
- 16. Gross Thermal Generation (MWh) 2090784.0 22431576 281771908.
- 17. Gross Electrical Generation (MWh) 702540.0 7441210 93606528
- 18. Net Electrical Generation (MWh) 685440.0 7250058 91036929
- 19. Unit Service Factor 90.9 87.7 68.8
- 20. Unit Availability Factor 90.9 87.7 68.8
- 21. Unit Capacity Factor (MDC Net) 89.4 84.7 61.6
- 22. Unit capacity Factor (DER net) 89.4 84.7 61.6
- 23. Unit Forced Outage Rate 9.1 3.0 15.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A
- Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)
~.
d Q
OPERATING DATA REPORT DOCKET:
50-296 UNIT:
BROWNE PERRY 3 PREPARED BY:
J.
W.
Davannert j
j TELEPHONE:
f205) 729-2690 l
OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT 3
- 2. Reporting Period NOVEMBER 1996
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065 j
- 6. Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. Maximum Dependable capacity (Not MWe):
1065
- 8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A j
i l
THIS MONTE YEAR TO DATE CUMULATIVE
- i
- 11. Hours in Reporting Period 720.0 8040.0 82093
- 12. Hours Reactor Was Critical 720.0 7715.2 54010
- 13. Reactor Reserve Shutdown Hours 0.0 0
5150
- 14. Hours Generator On Line 720.0 7670.1 52675
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (Mwh 2332680.0 24575520 158845801
- 17. Gross Electrical Generation (MWh) 791270.0 8232660 53230990
- 18. Net Electrical Generation (MWh) 771647.0 8029036 50907663
- 19. Unit Service Factor 100.0 95.4 64.2
- 20. Unit Availability Factor 100.0 95.4 64.2
- 21. Unit capacity Factor (MDC Net) 100.6 93.8 58.2
- 22. Unit capacity Factor (DER net) 100.6 93.8 58.2
- 23. Unit Forced Outage Rate 0.0 2.9 19.0
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): Refueling Outage (U3C7), 2/21/97, 19.4 Days
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup N/A Excludes hours under administrative hold (June 1, 1985 to November 19, 1995)