ML20151Z470

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Aug 1987 for Browns Ferry Nuclear Plant
ML20151Z470
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/1987
From: Crawford J, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290338
Download: ML20151Z470 (3)


Text

..

OPERATING DATA REPORT DOCKET NO.

50-259 DATE AUGUST 87 PREPARED.BY S.A.RATLIFF

  • TELEPHONE 205-729-2937 OPERATING STATUS 1.

Unit Name: BROWNS FERRY UNIT ONE 2.

Reporting period: AUGUST, 1987

3. Licensed Thermal Power (MWt): 3293 4.

Nameplate Reting (Gross HWe): 1152 5.

Design Electric Rating (Net MWe): 1065 6.

Maximum Dependable Capacity (Gross MWe): 1098.4 7.

Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.

Power Level To which Restricted, If Any (Net MWe): N/A

10. Reason For Restrictions. If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 744.0 5831 114751
12. Hours Reactor Was Critical 0.0 0

59521

13. Reactor Reserve Shutdown Hours 0.0 0

6997 14 Hours Generator On Line 0.0 0

58267

15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

168066787

17. Gross Electric Generation (NWh) 0.0 0

55398130

  1. 18. Het Electric Generation (MWh)

-1664.0 24008 53687612

19. Unit Service Factor 0.0 0.0 50.78
20. Unit Availability Factor 0.0 0.0 50.78
21. Unit Capaci?-y Factor (MDC Net) 0.0 0.0 43.93
22. Unit Capacity Factor (DER Net) 0.0 0.0 43.93
23. Unit Forced Outage Rate 100.0 100.0 39.33
24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period, f

Estimated Date Of Startup:

CRevision 6

8808290338 880815 PDR ADOCK 05000259 R

PNU

,m c..

-m+---m-

a.

AVERAGE DAILY UNIT POWER TEVEL DOCKET NO.

50-259 Unit

_One DATE 09-01-87 COMPLETED BY J.D. Crawford TELEPHONE f205)729-2507 MONTH August 1987*

DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-3 17

-1 2

-2 18

-2 3

-3 19

-2 4

-3 20

-2 5

-3 21

-3 6

-2 22

-3 7

-2 23

-2 8

-2 24

-3 9

-2 25

-3 10

-3 26

-2 11

-2 27

-2 12

-3 28

-3 13

-2 29

-2 14

-3 30

-3 15

-1 31

-3 r

16

-1 INSTRUCTIONS on this format list the average daily unit power icvel in MWo-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

  • Complete Revision (9/77)

rv a 72sta vo w + ail NUCLEAR PLANT OPERATING STATISTICS s

Browns Ferrv Nuclear Plant Period Hours 744 Month August gg 87 stem No.

Unit No.

Unit 1 Unit 2 Unit 3 Plant 1

Aversee Houriv Gross Load. kW 0

0 0

0 2

Maximum Hour Net Generation. MWN 0

0 0

0 3

Core Thermal Enerov Gen. GWO (t12 0

0-0 0

4 Steam Gen Thermal Eneroy Gen.. GWO (t)2 j

5 Gross Electrical Gen., MWh 0

0 0

0 3

6 Station use. MWh 1664

  • 4710 495s

.1,1,3 2 9,*

7 Net Electrical Gen.. MWh

-1664 *

-4710

-4955

-11329

  • e3 8

Station Use. Percant 0

0 0

'O' 9

Accum. Core Avg. Exposure. MWO/To9 0

0 0

i:

_ 10 CTEG Th s Month.100 BTU 0

0 0

et I!

SGTEG This Month,106 BTU 19 13 Hours Reactor Was Critical 0

0 0

0 14 Unit Usa. Hours Min.

0 0

0 0

15 Caoacity Factor. Percent 0

0 0

O j

16 Turbine Avail Factor. Pareent 1

0

_100 33.3

[

!7 Genar3 tor Ava,t. Factor. o reent 0

0 100 31.3

l*

18 Turbooen Avail. F ctor. Pareent 0

100 33 3 i

g

?9 Acaeter Avail. r3etnr. pareent, o

n 100 11.1 2

20 Unit Avait F ctor. oarrant 0

0 0

0 i

21 Tureae startuos 0

0 0

0 22 maaetor coed startuns 0

0 0

0 a,

p-24 Gress Heat Rate. 8tuskWh 0

0 0

0 y

25 Net Heat Rate stu,kWn 0

0 0

0 3

26 1

??

g 23 Throttle Pressure. osia 0

0 0

0 d-29 Throttle Temocrature. *F 0

0 0

0

.a 30 Exhaust Pressure. IriHo Abs.

0 0

0 0

n g

31 Intake Water Temo.. *F 0

0 0

0 32 33 Main Fecow'*er M lb/hr i

34 35 36 37 Full Power Capacity, E F AO (H

4 4

4 38 Accum. Cycle Full Power Days. EFPO 4

4 4

39 Oil Fired for Generation. Gallons 6337 ll1

.s o Oil Heatino Value. Piu/ Gal 1 38.900 41 Oesel Generation. MWh 37.8 19 l

Max. Hour Net Gen.

I Max. Day Net Gen.

Load I

MWh Time Date l

MWh j

Oate Factor. 'f.

2 43 1 0

i 0

i 0

Remarkg; IFor 8FNP this value is MWO/STU and for SONP and WBNP this value is MWO/MTU.

(

2(t) indicates Thermal Energy.

3 3 Information furnished bv Reactor Analysis Groun. Chattancotn 4 Administrative hold

//

f An.,

3

\\

1)Fi/!W k.

  • Revision na ? 5..,~.. o 9/11/87

, n oa n... n k

23