ML20151Z519

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Feb 1988 for Browns Ferry Nuclear Plant
ML20151Z519
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/29/1988
From: Crawford J, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290349
Download: ML20151Z519 (3)


Text

. _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _

r OPERATING DATA REPORT DOCKET NO.

50-259 DATE FEBRUARY 88 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.

Unit Name: BROWNS FERRY UNIT ONE

2. Reporting period: FEBRUARY, 1988
3. Licensed Thermal Power (MWt): 3293 4

Nameplate Rating (Gross MWe): 1152 5.

Design Electric Rating (Net MWe): 1065

6. Maximum Dependable Capacity (Gross MWe): 1098.4 7

Maximum Dependable capacity (Net NWe): 1065

8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To which Restricted. If Any (Net MWe): N/A L
10. Reason For Restrictions. If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 696.0 1440 119120
12. Hours Reactor Was Critical 0.0 0

59521

13. Reactor Reserve Shutdown Hours 0.0 0

6997

14. Hours Generator On Line 0.0 0

58267

15. Unit Reserve Shutdown Hours 0.0 0

0

10. Gross Thermal Generation (MWh) 0.0 0

168066787

17. Gross Electric Generation (MWh) 0.0 0

55398130 c18. Net Electric Generation (MWh)

-3497.0

-5081 536T6392

19. Unit Service Factor 0.0 0.0 48.91
20. Unit Availability Factor 0.0 0.0 48.91
21. Unit Capacity Factor (MDC Net) 0.0 0.0 42.31
22. Unit Capacity Factor (DER Net) 0.0 0.0 42.31
23. Unit Forced Outage Rats 100.0 100.0 41.97
24. Shutdowns Scheduled Over Next 6 Month (Type. Date, and Duration of Sach):

i i

25. If Shut Down At End of Reporting Period, Estimated Date Of Startup:

i cRevision ObOB290349 800Bi5 17 PDR ADOCK 0500 9

R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-259 Unit One DATE 03-01-88 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH February 1988*

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-2 17

-6 2

-2 18

-6 3

-1 19

-7 4

-2 20

-5 5

-2 21

-6 6

-2 22

-6 7

-2 23

-6 8

-6 24

-6 9

-5 25

-6 10

-6 26

-6 11

-5 27

-6 4

12

-6 28

-6 13

-7 29

-5 14

-6 30 15

-6 31 r

16

-6 INSTRUCTIONS On this format, list the sverate daily unit power icvel in NWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

  • Complete Revision (9/77)

tva isara tour >4.a u NUCLEAR PLANT OPERATING STATISTICS 26 Browns Ferry Nuclear Plant Pereod Hour $

696 Month Pah m rv 19 RA Item No.

Unit No.

f'n i t I f_'n i t 2 f _'n i e 1 P1 w 1

Averace Hourtv Gross Load. kW O

O O

O 2

Maximum Hour Net Generation. MWh o

O O

o 3

Core Thermal Enerov G' n, GWO (t)2 O

O O

O e

4 Steam Gen Thermal Energy Gen., GWO (t)2 j

5 Gross Electrical Gen., MWh O

O O

O t

6 Station Use, MWh 3497

  • 1973 2570 8.04Q
  • 7 N,

Tlectrical Gen., MWh

-349] *

-1973

-2570

-80.40 *.

o 8

Station Use, Percent L

O O

0,__,..

9 Accum. Core Avg. Euocsure, MWO/Toni O

O O

O 10 CTEG This Month 100 87U O

O O

O SGTEG This Month,106 BTU 1?

13 Hours Reactor Was Critical O

O O

O 14 Unit Use, Hours Min.

O O

O O

15 Capacity Factor, percent O

O O

O j

16 Turbine Avail. Fattor. Percent O

O n

n 17.

Generator Avail. Factor Percent n

n n

o 4

18 Turbooen Avail. Factor. Percent O

O O

O g

19 Reactor Avail Detor. Percent O

O O

O 2 _ 20 Unit Avait. Factor Percent O

O O

O 21 Turbihe Startuos O

O O

O 22 Reactor Cold Startuns O

O O

O M

p 24 Gross Heat Rate, Btu /kWh 0

0 0

0 g

2$

Net Heat Rate, Atu/kWh O

O O

O 3

26 j

27 g

28 Throttle Pressure, psio O

O O

O g

29 Throttle Temperature. 7 0

0 0

0

',8 30 Fuhaust Pressure, InHg Abs.

O O

O O

g 31 Intake Water Temo., *F 0

0 0

0 32 33 Main Feedwater, M lb/hr i

34

[

35 36

  • 7 Full Power Capacity, E FPO (3)

(4)_

(4)

(4) 38 Accum. Cycle Fult Power Days, EFPO (4)

(4)

(4) h 39 Oil Fered for Generation, Galluns 4,_140 E

40 _ Oil Heatino Value. Blu/ Gat 1 M 700

... 41.,,_Qgtel Generation. MWh 14 A V

Man Hour Net Gen.

Man, Oay Net Gen.

Load MWh Time Date MWh Date Factor, %

3 43 0

1 O

O 3

R emark s-1For 8FNP this value is MWD /STU and for SONP and WBNP this value is MWD,M f U l

2(t) indicates Thermal Energy.

3 3 Inforrmtion furnished by Reactor Analyd@!p, Chattanooca 4 Adminnistrative hold.

a

/i A Il A

/>,V fil CRevision g[h DJtm Submitten Date R* vised d

N

-