ML20094K456

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1995 for Browns Ferry Nuclear Plant
ML20094K456
Person / Time
Site: Browns Ferry  
Issue date: 10/31/1995
From: Salas P, Tanya Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511160344
Download: ML20094K456 (13)


Text

-

l l

l IUA l

l Tennessee Valley Authority, Post Off.ce Box 2000. Decatur. Alabama 35609 i

November 13, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF OCTOBER 1995 In accordance with the requirements of BFN Units 1, 2,

and 3 Technical Specifications, Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of October 1995 in the enclosure.

If you have any questions, please call me at (205) 729-2636.

Sincerely,

/

o Salas Manager of Site Licensing Enclosure cc:

See page 2 l

l IGCOG9 9511160344 951031 7

PDR ADOCK 05000259 i

I R.

PDR l

t i

U.S. Nuclear Regulatory Commission Page 2 November 13, 1995 Enclosure cc (Enclosure):

Mr. Mark S.

Lesser, Acting Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.

20555 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P. O. Box 10412 Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute 1200 G Street, NW Washington, D.C.

20005-3802

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN) 1 UNITS 1, 2, AND 3 l

NONTELY OPERATING REPORT OCTOBER 1995 SEE ATTACHED 1

4 OPERATIONAL

SUMMARY

OCTOBER 1995 a

I BROWNS FERRY 1 i

Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 1 has been on administrative hold i

since June 1, 1985.

As a result, TVA considers that accrual j

i of reporting hours is suspended since the unit has a maximum J

dependable capacity of 0 MWe.

Accordingly, TVA does not consider cumulative reporting period hours for the period beginning l

June 1, 1985, when calculating the operating status variables.

3 BROWNS FERRY 2 i

l During the month Unit 2 operated at a capacity factor of 100.0 j

percent and generated 812,310 megawatt hours gross electrical i

power.

As of October 31, 1995, Unit 2 has operated continuously j

for 72 days.

BROWNS FERRY 3 Unit 3 remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 3 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.

Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

~.-

AVERAGE DAILY UN7T POWER LEVEL DOCKET NO:

50-259 UNIT BROWNS FERRY 1 PREPARED BY T.

R.

Smith TELEPHONE:

,G,Q5 ) 729-2955 MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

31 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-260 UNIT:

BROWN 8 FERRY 2 PREPARED BY:

T. R.

Smith TELEPHONE:

(205) 729-2955 MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 782 16 1079 2

1056 17 1084 3

1069 18 1075 4

1073 19 1081 5

1075 20 1075 6

1080 21 1061 7

1078 22 1061 8

1078 23 1084 9

1079 24 1083 10 1077 25 1086 11 1065 26 1084 12 1074 27 1077 13 1077 28 1087 14 1078 29 1077 15 1069 30 1084 31 1075

l

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-296 UNIT:

BROWNS FERRY 3 PREPARED BY:

T. R.

Smith j

TELEPHONE:

(205) 729-2955 MONTH OCTonR 1995 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

I 2

0 17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

1 31 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-259 REPORT MONTH:

OCTOBER 1995 UNIT BROWNS FERRY I PREPARED BY:

T.

R.

Smith TELEPHONE:

f2051 729-2955 Method of License Duration Shutting Event System Component cause and corrective Action to Prevent No.

Date Type' (Nours)

Reesor/

Down Reactor' Report No.

Code

  • Code
  • Recurrence 1

06/01/85 s

744 F

4 Administrative hold to resolve various TVA and NRC concerns.

i

'F-Forced

'A-Equipment Failure (Explain)

' Method:

  • Instructions for Properation of Licensee S-Schedsted B-Meintenance or Test 1-Manuel Event Reports (NUREG-1022)

C-Refueling 2-Menuel scram D-Regulatory Restriction 3-Automatic scram E-Operator Training and License Examinetton 4-Continuation of Existirg Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other N-Other (Explain) i k

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-260 REPORT MONTH:

OCTOBER 1995 UNIT: BROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

f2051 729-2955 Method of License Duration shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Down Reactor' Report No.

Code' Code

  • Recurrence

{

4 09/30/95 S

33 8

5 Deep / shallow control rod exchange and Reactor Feed Pump 2A repair. (Continued from September) l s

'F-Forced

'A-Equipment Failure (Explain)

' Method:

' Instructions for Properation of Licensee S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)

C-Refueling 2-Menuel Scram i

D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examinetton 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain)

UNIT SHUTD(MfMS AND PONER REDUCTIONS DOCKET NO: 50-296 REPORT MONTH:

OCTOBER 1995 UNIT: BROWNS FERRY 3 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 6

Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Nours)

Reason' Down Reector' Report No.

Code' Code' Recurrence 1

06/01/85 S

744 F

4 Administrattw hold to resolve various TVA and NRC concerns.

t i

h i

?

L F

'F-Forced

'A-EgJipment Failure (Explain)

' Method:

' Instructions for Preparation of Licensee S-Scheduled 5-Meintenance or Test 1-Menual Event Reports (NUREG-1022)

C-Refueling 2-Menuel Scram D-Regulatory Restriction 3-Automatic Scram i

E-Operator Training and License Examination 4-Continuation of Existlig (katoge F-Administrative 5-Redaction G-Operational Error (Explain) 9-Other l

H-Other (Explain) l

e OPERATING DATA REPORT DOCKET:

50-259 UNIT: BROWNS FERRY 1 PREPARED BY T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS i

1. Unit Names BROWNS FERRY UNIT 1
2. Reporting Periods October 1995
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Not MWe):

1065

6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Not MWe):

0

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Not MWe): 0
10. Reason For Restrictions, If Any Administrative Hold TEIS MONTE YEAR TO DATE CUNUIATIVE*
11. Hours in Reporting Period 0

0 95743

12. Hours Reactor Was critical 0

0 59521

13. Reactor Reserve Shutdown Hours 0

0 6997

14. Hours Generator On Line 0

0 58267

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 0 0

168066787

17. Gross Electrical Generation (MWh) 0 0

55398130

18. Net Electrical Generation (MWh) 0 0

53796427

19. Unit Service Factor 0

0 60.9

20. Unit Availability Factor 0

0 60.9 l

21. Unit capacity Factor (MDC Net) 0 0

52.8

22. Unit capacity Factor (DER net)

O O

52.8

23. Unit Forced Outage Rate 0

0 25.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
  • Excludes hours under administrative hold (June 1, 1985 to present)

e OPERATING DATA REPORT 9

DOCKET:

50-260 UNIT:

BROWNS FERRY 2 PREPARED BY:

T.

R.

SMITH TELEPHONE:

f205) 729-2955 OPEEaTING STATUS

1. Unit Names BROWNS FERRY UNIT 2
2. Reporting Periods October 1995
3. Licensed Thermal Power (MWt):

3293

)

4. Nameplate Rating (Gross MWe):

1152 1

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

1098.4

7. Maximum Dependable Capacity (Not MWe):

1065

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Not MWe): N/A l
10. Reason For Restrictions, If Any: N/A THIS MONTE YEAR TO DhTE CUNULATIVE*
11. Hours in Reporting Period 745 7296 129367
12. Hours Reactor Was critical 745 7188 89315
13. Reactor Reserve Shutdown Hours 0

0 14200

14. Hours Generator on Line 745 7164 87024
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 2426782 23391029 254559944
17. Gross Electrical Generation (MWh) 812310 7809490 84552668
18. Net Electrical Generation (MWh) 793495 7621912 82211748
19. Unit Service Factor 100.0 98.2 67.3
20. Unit Availability Factor 100.0 98.2 67.3
21. Unit Capacity Factor (MDC Net) 100.0 98.1 59.7
22. Unit capacity Factor (DER net) 100.0 98.1 59.7
23. Unit Forced Outage Rate 0.0 1.8 16.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None
25. If Shut Down At End of Reporting Period, Estimated Date of Startup: N/A
  • Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)

. ~... - _.

-_=.-

OPERATING DATA REPORT DOCKET:

50-296 UNIT: BROWNS FERRY 3 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 3
2. Reporting Periods October 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Not MWe):

1065

6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Not MWe):

0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold 1

TEIS HONTE YEAR TO DATE CUMULATIVE *

11. Hours in Reporting Period O

O 73055

12. Hours Reactor Was Critical 0

0 45306

13. Reactor Reserve Shutdown Hours 0

0 5150

14. Hours Generator on Line 0

0 44195

15. Unit Reserve Shutdown Hours O

O O

16. Gross Thermal Generation (MWh) 0 0

131868267

17. Gross Electrical Generation (MWh) 0 0

43473760

18. Net Electrical Generation (MWh) 0 0

42114009

19. Unit Service Factor 0

0 60.5

20. Unit Availability Factor 0

0 60.5

21. Unit Capacity Factor (MDC Net) 0 0

54.2

22. Unit Capacity Factor (DER net) 0 0

54.2

23. Unit Forced Outage Rate 0

0 21.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
  • Excludes hours under administrative hold (June 1, 1985 to present)