Monthly Operating Repts for Jan 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3
ML20101D031
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/31/1996
From: Davenport J, Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603190339
Download: ML20101D031 (13)


Text

P 1 I

1 l .

l Hl4 Temaessee Vamey Autec< ty Post Othce Box 2000 Decatur. A acama 35609 l

l February 14, 1996 ,

l i

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF JANUARY 1996 In accordance witf1 the requirements of BFN Units 1, 2, and 3 Technical Specifications, Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of January 1996 in the enclosure.

If you have any questions, please call me at (205) 729-2636.

Sincere ly, J

reuro Salas Manager of Site Licensing Enclosure cc: See page 2 e,\h 9603190339 960131 PDR ADOCK 05000259 > -

R PDR J

190036 g' i

~

U.S. Nuclear Regulatory Commission Page 2 February 14, 1996 l

Enclosure cc (Enclosure):  !

Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 -

Atlanta, Georgia 30323 f Mr. Frederick J. Hebdon, Director '

Project Directorate II-4 Division of Reactor. Projects I-II .

Office of Nuclear Reactor Regulation, Mail 13 H3 ,

Washington, D.C. 20555 l INPO Records Center j Institute of Nuclear Power Operations 700 Galleria Parkway .

Atlanta, Georgia 30339-5957 Mr. Jim Lang '

Director of Engineering and Operations Electric Power Research' Institute P. O. Box 10412 Palo Alto, California'94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute 1200 G Street, NW Washington, D.C. 20005-3802 l

i

. . . . - . . - . _ - - - . - - _ . = - . . _ . .

l ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 MONTHLY OPERATING REPORT JANUARY 1996 l

(SEE ATTACHED) i 1

I

,w

l OPERATIONAL

SUMMARY

JANUARY 1996 BROWNS FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe, Accordingly, TVA does not consider cumulative reporting period hours for the period beginning  ;

June 1, 1985, when calculating the operating status variables. ,

l BROWNS FERRY 2 During the month Unit 2 operated at a capacity factor of 99.6 porcent and generated 805,270 megawatt hours gross electrical l power. As of January 31, 1996, Unit 2 has operated continuously for 164 days.

1 BROWNS FERRY 3 l During the month Unit 3 operated at a capacity factor of 101.3 percent and generated 821,390 megawatt hours gross electrical power. As of January 31, 1996, Unit 3 has operated continuously l for 64 days.

l l

l i

a l

I I

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 UNIT: BROWNS FERRY l PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 1

1 l

I MONTH JANUARY 1996 I I

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 16 0 ,

2 0 17 0 )

l 3 0 18 0 1 4 0 19 0 l

I 5 0 20 0 j 1

I 6 0 21 0  !

7 0 22 0 1

8 0 23 0 9 0 24 0 10 0 25 0 l 11 0 26 0 12 0 27 0 1 13 0 28 0 14 0 29 0 15 0 30 0 I 1

1 31 0 i

I

4 Y AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 MONTH JANUARY 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1083 16 1069 2 1081 17 1068 3 1083 18 1069 4 1084 19 1069 5 1077 20 1040 6 1073 21 820 7 1076 22 1049 8 1067 23 1063 9 1083 24 1065 10 1073 25 1069 11 1016 26 1057 12 966 27 1057 13 1081 28 1061 l l

14 1073 29 1062 15 1089 30 1060 31 1060 I

I, i l

~

l l

AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO: 50-296 UNIT: BROWNS FERRY 3 ,

PREPARED BY: J. W. Davenport )

TELEPHONE: (205) 729-2690 1

MONTH JANUARY 1996 l l

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I (MWe-Net) (MWe-Net)

I 1 1075 16 1088 2 1096 17 1091 3 1084 18 1973 4 901 19 1094 5 1070 20 1085 6 1093 21 1086 l

7 1089 22 1093 ,

1 8 1076 23 1091 9 1095 24 1078 I

10 1082 25 1078 j 11 1073 26 1099 l 12 1054 27 1082 13 1097 28 1084 14 1082 29 1091 15 1091 30 1080 31 1079 i

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-259 REPORT MONTH: JANUARY 1996 UNIT: BROWNS FERRY 1 PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 i Method of Lics e Duration Shutting Event Systy Cgt cause and Corrective Action to Prevent Reason 2 Down Reactor 3 No. Date Type 3 (Nours) Report No. Code Code Recurrence 14 06/01/83 S 744 F 4 Achinistrative hold to resolve various TVA and NRC concerns.

A L I

F-Forced k-EquipmentFailure(Emplain) hthod: ' instructions for Preparation of Licensee t S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)  ;

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram  !

E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reauction G-Operational Error (Emplain) 9-Other ,

M-Other (Emplain) i h

. t k

_- .,----s -. - , m -- --- - - - - - - -- --.s-. . . - - - - -

- - - - ~s_<----.-,---&----- . *- * - . - - _ - ---- - - - - - - ---_i~.---- -

_ _ _ _ . . . _ =_. -

a .

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-260 REPORT MONTH: JANUARY 1996 UNIT: BROWNS FERRY 2 +

PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 i

,e Method of License Duration ., Shutting Event Systep Cgt Cause and Corrective Action to Prevent ,

g 3 No. Date Type (Hours) Reason'" Down Reactor Report No. Code Code Recurrence NIN i

t i

i t

t I F-Forced k-EquipmentFailure(Explain) hthod: knstructionsforPreoarationofLicensee S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NURU+ 1022)

C-Refueling 2-Manuel Scram .

D-Regulatory Restriction .

3-Automatic Scram J E-Operator Training and License Examination 4-Continuation of Existing Outage F- Administrative S-Reduction G-Operational Error (Emplain) 9-Other N-Other (Emptain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-296 REPORT MONTH: NOVEMBER 1996 UNIT: BROWNS FERRY 3 PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 Method of License Duration Shutting Event Systep Cgt Cause and Corrective Action to Prevent 3 2 3 Code Code Recurrence No. Date Type (Hours) Reason Down Reactor Report No.

N/A I

F Forced k-Equipment Failure (Explain) hthod: bnstructionsforPreparationofLicensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F- Administrative 5-Reduction G-operational Error (Explain) 9-Other M-Other (Explain)

OPERATING DATA REPORT O

\ .

8 DOCKET: 50-259 UNIT: BROWNS FERRY 1 PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT 1
2. Reporting Period: JANUARY 1996
3. Licensed Thermal Power (MWt): 3293 l
4. Nameplate Rating (Gross MWe): 1152 j
5. Design Electrical Rating (Net MWe): 1065 l
6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Net MWe): 0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A l
9. Power Level To Which Restricted, If Any (Net MWe): 0
10. Reason For Restrictions, If Any: Administrative Hold THIS MONTH YEAR TO DATE CUDEJLATIVE*
11. Hours in Reporting Period 0 0 95743
12. Hours Reactor Was Crftical 0 0 59521
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator on Line 0 0' 58267
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Generation (MWh) 0 0 168066787
17. Gross Electrical Generation (MWh) 0 0 55398130
18. Net Electrical Generation (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9
20. Unit Availability Factor 0 0 60.9
21. Unit Capacity Factor (MDC Net) 0 0 52.8
22. Unit Capacity Factor (DER net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6 l
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To Be Determined Excludes hours under administrative hold (June 1, 1985 to present)

8 OPERATING DATA REPORT DOCKET: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY: J. W. Davenport TELEPHONE: (205) 729-2690 OPERATING STATUS

1. Unit Name: BRONNS FERRY UNIT 2
2. Reporting Period: JANUARY 1996
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 115z
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1099.4
7. Maximum Dependable Capacity _(Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS MONTH YEAR TO DATE CtBAJLATIVE*
11. Hours in Reporting Period 744.0 744 131575
12. Hours Reactor Was Critical 744.0 744 91523
13. Reactor Reserve Shutdown Hours 0.0 0 14200
14. Hours Generator On Line 744.0 744 89232
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh) 2423568.0 2423568 261763900
17. Gross Electrical Generation (MWh) 805270.0 805270 86970588
18. Net Electrical Generation (MWh) 785846.0 785846 84572717
19. Unit Service Factor 100.0 100.0 67.8
20. Unit Availability Factor 100.0 100.0 67.8
21. Unit Capacity Factor (MDC Net) 96.2 96.2 60.4
22. Unit Capacity Factor (DER net) 96.2 96.2 60.4
23. Unit Forced Outage Rate 0.0 0.0 15.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling outage, March 23, 1996, 30 days
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A Excludes hours undar administrative hold '

(June 1, 1985 to May 24, 1991) l

(

i

. o CPERATING DATA REPORT DOCKET: 50-296 UNIT: BROWNS FERRY 3 .

PREPARED BY: J. W. Davenport l TELEPHONE: (205) 729-2690 OPERATING STATUS

'1. Unit Name: BROWNS TERRY UNIT 3

2. Reporting Period: JANUARY 1996
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS NONTH YEAR TO DATE CIS4ULATIVE*
11. Hours in Reporting Period 744.0 744 74819
12. Hours Reactor Was Critical 744.0 744 47039
13. Reactor Reserve Shutdown Hours 0.0 0- 5150
14. Hours Generator On Line 744.0 744 45749
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh 2431344.0 2431344 136701625
17. Gross Electrical Generation (MWh) 821390.0 821390 45085580
18. Net Electrical Generation (MWh) 802281.0 802281 43680908
19. Unit Service Factor 100.0 100.0 61.1
20. Unit Availability Factor 100.0 100.0 61.1
21. Unit Capacity Factor (MDC Net) 101.3 101.3 54.8
22. Unit Capacity Factor (DER net) 101.3 101.3 54.8
23. Unit Forced Outage Rate 0.0 0.0 21.0
24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): N/A i
25. If Shut Down At End Of Reporting Period, i Estimated Date of Startup: N/A Excludes hours under administrative hold (June 1, 1985 to November 19, 1995)

-- <