ML20133M124

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1996 for Browns Ferry Nuclear Plant,Units 1,2 & 3
ML20133M124
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/31/1996
From: Abney T, Davenport J
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9701220273
Download: ML20133M124 (13)


Text

Tennessee Valley Authority Post Othee Box 2000. Decatur, Alabama 35009 JANUARY 14, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Auth.^rity ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF DECEMBER 1996 In accordance with the requirements of BFN Units 1, 2, and 3 Technical Specifications, Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of December 1996 in the enclosure.

If you have any questions, please call me at (205) 729-2636.

Sin m 31y,

/

% . A T. E. Abney l~

Manager of Li ensinc and Industr Affairs 1 Enclosure '\ k I

cc: See page 2 ,

/ ,

9701220273 DR 961231 ADOCK 05000259 eDR ,

i

U.S. Nuclear Regulatory Commission Page 2 JM4UARY 14,1997

-Enclosure cc (Enclosure) :

Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlarta, Georgia 30323 Mr. Frederick J. Hebdon, Director I Project Directorate II-4 Divisi~on of Reactor Projects I-II Office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C. 20555 l INPO Records Center i Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P. O. Box 10412 Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 3 10833 Shaw Road i Athens, Alabama 35611

]

)

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Ms. Elizabeth Hannon Utility Data Institute 1200 G Street, NW Washington, D.C. 20005-3802 i

l 1

ENCLOSURE ,

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 MONTHLY OPERATING REPORT DECEMBER 1996 s

r (SEE ATTACHED)

I 4

i 1

k i

l l

l 1

OPERATIONAL

SUMMARY

DECEMBER 1996 BROWNS FERRY 1 Unit.1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit ~1 has been on administrative I hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe. Accordingly, TVA does not consider cumulative reporting period hours for the '

period beginning June 1, 1985, when calculating the operating status variables.  :

BROWNS FERRY 2 l

For the month of December, Unit 2 generated 814,840 megawatt I hours gross electrical power and operated at a net capacity factor of 100.5 percent. As of December 31, 1996, Unit 2 has operated continuously for 59 days.

J i  :

, BROWNS FERRY 3

?

.For the month of December, Unit 3 generated 793,150 megawatt i hours gross electrical power and operated at a net capacity factor of 97.7 percent. As of December 31, 1996, Unit 3

! has operated continuously for 106 days. It should be noted, that Unit 3 has begun its " coast down" for the cycle 7 refueling outage scheduled to begin on February 21, 1997.

?

A r

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 UNIT: BROWNS FERRY 1 PREPARED EY: J. W. Davenoort TELEPHONE: (205) 729-2690 MONTH DECEMBER 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 16 0 ,,_,

-2 0 17 0 3 0 18 0 i l

4 0 19 0 l l

5 0 20 0 6 0 21 0 l

7 0 22 0 8 0 23 __ 0 9 0 24 0 10 0 25 0 11 0 26 0 12 0 27 0 13 0 28 0 14 0 29 0 15 0 30 0 31 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY: J. W. Davenoort TELEPHONE: (205) 729-2690 i

MONTH DECEMBER 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1081 16 1080 i

2 1084 17 1080 ,,,,

3 1081 18 1084 4 1082 19 1084 _

5 1083 20 1082 6 1081 21 1082 7 1083 22 1081 e

8 1078 23 1084 9 1085 24 1082 10 1087 25 1086 1

11 1080 26 805 12 1085 27 959 13 1083 28 1092 14 1082 29 1001 15 1082 30 1080 31 1088

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-296 UNIT: BROWN 9 FERRY 3 PREPARED BY: J. W. Davennort TELEPHONE: (205) 729-2690 MONTH DECEMBER 1996 DAY AVERAGE DAILY PCWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 842 16 1's67 2 1056 17 1066 3 1099 18 1061 4 1067 19 1061 5 1088 20 _

1056 1

6 1087 21 1050 t

1 7 1042 22 1044 1

l 8 1021 23 1043 9 1017 24 1037 4

10 1071 25 1035 11 1067 26 1029 12 1074 27 933 13 1076 28 1037 14 1063 29 1047 15 1063 30 957 31 1014 I I

l

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-259 -

-REPORT MONTH: DECEMBER 1996 UNIT: BROWNS FERRY 1 PREPARED BY: J. W. Davennert TELEPHONE: (205) 729-2690 -

e Method of License Duration shutting Event Systy C t Cause and Corrective Action to Prevent go, Date Type (Hours) Reason2 Dom Reactor 3 Report No. Code Code Recurrence 1 06/01/85 5 744 F 4 Achainistrative hold to resolve various TVA and NRC concerns.

, I8 I F-Forced 2A-Equipment Failure (Explain) ' h thod: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUkEG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F- Acknini strative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

. _ _ _ _ _ _ = - _ _ _ . _ _ _ _ _ . _ - . - _ _ _ _ . _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - _ - _ _ _ _ _ _ - - . - _ - _ - - - - - _ _ - _ . _ - - . .___-_- . _ - , ~ _ _ ~ - _ _ ___-. .-- . _ . _ _ - _ - - - - .

k UNIT SE"IDOWNS AND POWER REDUCTICNS DOCICET NO: 50-260 -

REPORT MOh"IH: DECEMBER 1996 UNIT: BROWNS FERRY 2 PREPARED BY: J. W. Davennert TELEPHONE: f205) 729-2690 ,

Method of License Duration Shutting Event Systy- C t Cause and Corrective Action to Prevent No. Cate Type l (Hours) Reason2 Doian Reactor 3 Report No. code code Recurrence 5 12/26/96 S 17 8 5 N/A N/A N/A Poiser reduced to 70 percent for scheduled V :ntenance.

k I

'I -Forced F 2A-Equipment Failure (Explain) hthod: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022) i C-Refueling 2-Manual Scram i D-Regulatory Restriction 3-Automatic scram E-Operator Training and License Examination 4-Continuation of Existing Outage i F-Adninistrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Exptain)

_ . . _ _ . . _ _ _ _ _ _ _ _ . . . - _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ ..__. _ _- _ _ _ _ _ _ _ , ,.-. . . .%._ w r

^ '

.. ,j

- 4 7

UNIT SHUTDOWNS AND POWER' REDUCTIONS. DOCKET NO r 296 - ' ~.

YI . REPORT MONTH: DECEMBER 1996 UNIT: BROWNS FERRY 3-PREPARED-BY: J. W. Davannort TELEPHONE: -(205) 729-2690 Method of License Duration , Shutting Event Systy Cgt. ' Cause and Corrective Action to Prevent No. Date- Type (Nours) Reasort Down Reactor 3 Report No. Code Code Recurrence' II -12/01/96 s 18 8 5 N/A N/A N/A Poeser reduction for final feessater ' . .

redaction. Note: Unit 3 is in N oastdoise '

for the cycle 7 Refueling outage schechted to begin on 02/21/97.

4 i

d I F-Forced 2A-Equipment Failure (Explain) hthod: ' Instructions for Preparation of Licensee

.5-scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022).

C-Refueling 2-Manual scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other '

H-Other (Explain)

  • a

.i.

__ _ _ ._,_m - .____..__._o._m_.m__._ . _ _ . _ _ _ _ _ _ . _ . _ . . - __m_._- mma_.___m_ ___m __._m.____m_____m- --_ m m e. -

e-.-. em-w. ar e-e--m-*t.-n -wv=. .-%t-m-ww-*--we - w a- --wm- r . e,-e-

OPERATING DATA REPORT DOCKET: 50-259 UNIT: BROWNS FERRY 1 PREPARED BY: -J. W. Davenoort TELEPHONE: (205) 729-2690 OPERATING STATUS

1. Unit Name BRONNS FERRY UNIT 1
2. Reporting Period: DECEMBER 1996
3. Licensed Thermal Power (MWt) : 3293
4. Nameplate Rating (Gross MWe) : 1152
5. Design Electrical Rating (Net MWe) : 1065 ,
6. Maximum Dependable Capacity (Gross MWe) : 0
7. Maximum Dependable Capacity (Net MWe): 0
8. If Changes Occur in Capacity Ratings (Items Number i 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe) : 0 4
10. Reason For Restrictions, If Any: Administrative Hold l

THIS MONTH YEAR TO DATE CUMULATIVE *

11. Hours in Reporting Period 0 0 95743  !
12. Hours Reactor Was Critical 0 0 59521 l
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator On Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Generation (MWh) 0 0 168066787
17. Gross Electrical Generation (MWh) 0 0 55398130
18. Net Electrical Generation (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9 4 20. Unit Availability Factor 0 0 60.9
j. 21. Unit Capacity Factor (MDC Net) 0 0 52.8
22. Unit Capacity Factor (DER net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6 l 24. Shutdowns Scheduled Over Next 6 Months

('RWpe, Date, and Duration of Each): N/A i 25. If Shut Down At End Of Reporting Period, j Estimated Date of Startup: To Be Determined l

  • Excludes hours under administrative hold I (June 1, 1985. to present)

- . . - _ . .. - . . ~ . - . . . .

-- . - - . _ . . . .. _ - . _ ~

.. i

  • l OPERATING DATA REPORT l

I DOCKET: 50-260 I UNIT: BROWNS FERRY 2 PREPARED BY: J. W. Davenoort TELEPHONE: (205) 729-2690 l

OPERATING STATUS ,

1. Unit Names BROWNS FERRY UNIT 2
2. Reporting Period: DECEMBER 1996
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe) : 1152
5. Design Electrical Rating (Net MWe) : 1065
6. Maximum Dependable Capacity (Gross MWe) : 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A l

THIS MONTH YEAR TO DATE CUMULATIVE *

11. Hours in Reporting Period 744,0 8784.0 139615
12. Hours Reactor Was Critical 744.0 7870.0 98649
13. Reactor Reserve Shutdown Hours 0.0 0.0 14200
14. Hours Generator On Line 744.0 7795.0 96283
15. Unit Reserve Shutdown Hours 0.0 0.0 0
16. Gross Thermal Generation (MWh) 2415192.0 24846768 284187100
17. Gross Electrical Generation (MWh) 814840.0 8256050 94421368
18. Net Electrical Generation (MWh) 796236.0 8046294 91833165
19. Unit Service Factor 100.0 88.7 69.0
20. Unit Availability Factor 100.0 88.7 69.0 21.' Unit Capacity Factor (MDC Net) 100.5 86.0 61.8
22. Unit Capacity Factor (DER net) 100.5 86.0 61.8
23. Unit Forced Outage Rate 0.0 2.8 15.0 ,

l 1

24. Shutdowns Scheduled Over Next 6 Months (Type, I Date, and Duration of Each) : N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startupt N/A Excludes hours under administrative hold (June 1, 1985 to May 24, 1991) l I

I 3 '

1 1

\

OPERATING DATA REPORT l

i DOCKET: 50-296' UNIT: BROWNS FERRY 3 PREPARED BY J. W. Davenoort TFLEPHONE: (205) 729-2690 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 3
2. Reporting Period: 'DECENBER 1996
3. Licensed Thermal Power (MWt) : 3293
4. Nameplate Rating (Gross MWe) : 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe) : 1098.4
7. Maximum Dependable Capacity (Net MWe) : 1065 8..If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe) : N/A
10. Reason For Restrictions, If Any: N/A THIS MONTH YEAR TO DATE CUMULATIVE
  • a
11. Hours in Reporting Period 744.0 8784.0 82837
12. Hours Reactor Was Critical 744.0 8459.2 54754
13. Reactor Reserve Shutdown Hours 0.0 0.0 5150
14. Hours Generator On Line 744,0 8414.1 53419
15. Unit Reserve Shutdown Hours 0.0 0.0 0
16. Gross Thermal Generation (Mwh) 2384856.0 26960376 161230657
17. Gross Electrical Generation (MWh) 793150.0 9025810 54024140
18. Net Electrical Genr. ;stion (MWh) 774468.0 8803504 51682131
19. Unit Service Factot- 100.0 95.8 64.5
20. Unit Availability Factor 100.0 95.8 64.5
21. Unit Capacity Factor (MDC Net) 97.7 94.1 58.6
22. Unit Capacity Factor (DER net) 97.7 94.1 58.6
23. Unit Forced Outage Rate 0.0 2.7 18.8 i

4

24. Shutdowns Scheduled Over Next 6 Months  !

(Type, Date, and Duration of Each) : Refueling Outage (U3C7), 2/21/97, i 19.4 Days

25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A Excludes hours under administrative hold (June 1, 1985 to November 19, 1995)