Revised Monthly Operating Repts for Sept 1987 for Browns Ferry Nuclear Plant
ML20151Z475
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/30/1987
From: Crawford J, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290339
Download: ML20151Z475 (3)


Text

.-

=

OPERATING DATA REPORT DOCKET NO.

50-259 DATE SEPTEMBER 87, PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.

Unit Name: BROWNS FERRY UNIT ONE

2. Reporting period: SEPTEMBER, 1987
3. Licensed Thermal Power (MWt): 3293 4

Nameplate Rating (Gross MWe): 1152 5.

Design Electric Rating (Net MWe): 1065

6. Maximum Dependable Capacity (Gross MWe): 1098.4 7.

Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.

Power Level To which Restricted, If Any (Net MWe): N/A

10. Reacon For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 720.0 6551 115471
12. Hours Reactor Was Critical 0.0 0

59521

13. Reactor Reserve Shutdown Hours 0.0 0

6997 14 Hours Generator On Line 0.0 0

58267

15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

168066787

17. Gross Electric Generation (MWh) 0.0 0

5E398130

  • 18. Net Electric Generation (MWh)

-1570.0

-25578 52686042

19. Unit Service Factor 0.0 0.0 50.46
20. Unit Availability Factor 0.0 0.0 50.46
21. Unit Capacity Factor (MDC Net) 0.0 0.0 43.66
22. Unit Capacity Factor (DER Net) 0.0 0.0 43.66
23. Unit Forced Outage Rate 100.0 100.0 39.78 24 Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
  • Revision B9082903399%pgh59 PDR ADOCK O R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-259 Unit one DATE 10-01-87 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH September 1987*

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-2 17

-3 2

-2 18

-1 3

-3 19

-2 4

-2 20

-3 5

-2 21

-3 6

-2 22

-2 7

-2 23

-2 8

-2 24

-1 9

-3 25

-2 10

-2 26

-2 11

-2 27

-2 12

-3 28

-3 I?

-2 29

-3 14

-2 30

-3 15

-2 31 i

16

-3 INSTRUCTIONS On this format, list the averaEe daily unit power level in MWe-Net for each day in the reportinE month. Compute to the nearest whole moEawatt.

  • Complete Revision (9/77)

.. r tv.s iss c tona4.eu NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plant Period Hours 720 Month Sontember 19 87 Item No.

Unit No.

Unit 1 Unie 2 Unit 3 Plant 1

Averace Houriv Gross load kW 0

0 0

0

_2 Maximurn Hour Net Generation. MWh 0

0 0

0 3

C' ore Thermal Energy Gen, GWD (tl2 0

0

__ 0 0

4 Steam Gen. Thermal Energy Gen.. GWD (t)2

,j 5

Gross Efectrical Gen., MWh

_ 1170

  • 483f 4295 10.700*

0 0"

0 o

g 6

Station Use, MWh g

7 Net Electrical Gen., MWh

-1570 *

-4835

-4295

-10760*

,o 8

Station Use, Percent 0

0 0

0 i

9 Accum. Core Avg. Exposure. MWD / Ton 1 0

0' 0

~

0

~'~

10 CTEG 'This Month 106 BTU 0

0 0

0'~

~'

6 TU 11 SGTEG This Month, IO B

13 Hours Reactor Was Critical 0

0 0

0

~

14 Unit Use, Hours. Min.

0 0

0 0

15 Capacity Factor, Percent 0

1 0

0 2

16 Turbine Avail. Factor. Pereent 0

0 100 33.3 17 Generator Avail. Factor. Percent 0

0 100 33.3 e

18 Turt ocen, Avail. Factor. Percent 0

0 100 33.3 19 Reseter Avail. Factor. Percent 0

0 100 33.3 2

20 Unit Avaii. raeter. Percent 0

0 0

0 21 Turbine Startues 0

0 0

0 J

Reactor Cold Startues 0

0 0

0 n

24 Gross Heat Rate, Btu /kWh 0

0 0

0 f

25 Net Heat Rate, Blu/kWh 0

0 0

0 3

26 C

27 g

28 Throttle Pressure, psig 0

0 0

0 ct 29 Throttle Temperature. *F 0

0 0

0 y

30 Exhaust Pressure, InHg Abs.

0 0

0 0

E 31 Intake Water Temo., *F 0

0 0

0 32 33 Main Feedwater, M lb/hr i

34

  • 8$

35 36 37 Full Power Capacity, EFPo (3) 4 4

4 38 Accum. Cycle Full Power Days, EFPD 4

4 4

j 39 Oil Fired for Generation, Gallons

'3802 e

2 _. 40 Olf Heatino Value_ Btu / Gal.

139,400

_ 41 Diestt Generation. MWh 25.2 o

Max. Hour Net Gen.

Max. Day Net Gen.

l.oJ d

~

MWh Time Date MWh Date Factor, %

2 43 0

0 0

Q Remarks: IFor BFNP this value is MWD /STU and for SONP and WBNP this value is MWD /MTU.

~

l 2(t) indicates Therre.1 Energy, 3

(3)'Information furnished by Reactor Analysis Group. Chattanooga (4) Administrative hold n

.n A II I

flu

  • Revision DJte Submitted Date Revise <1

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _