ML20129B910

From kanterella
Jump to navigation Jump to search
Revised MOR for Aug 1996 for Browns Ferry Unit 2
ML20129B910
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/1996
From: Davenport J
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20129B873 List:
References
NUDOCS 9610230149
Download: ML20129B910 (1)


Text

. . . .- .~.

ae e OPERATING DATA REPORT DOCKET: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY: J. W. Davenoort TELEPHONE: (205) 729-2690 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 2
2. Reporting Ieriod: AUGUST 1996
3. Licensed Tisermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Depeadable Capacity (Gross MWe): 1b98.4
1. Maximum Dependable capacity (Set MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To Which Restri id, If Any (Net MWe): N/A
10. Reasca For Restrictions, "* 4 ray: N/A THIS NONTE YEAR TO DATE CUNULATIVE*
11. Hours in Reporting Period 744.0 5855.0 136686
12. Hours Reactor Was Critical 744.0 5051.0 95830
13. Reactor Reserve Shutdown Hours 0.0 0.0 14200
14. Hours Generator On Line 744.0 4987.0 93475
15. Unit Reserve Shutdown Hours 0.0 0.0 0
16. Gross Thermal Generation (MWh) 2430120.0 15728208 275068540
17. Gross Electrical Generation (MWh! 800530.0 5195370 91360688
18. Net Electrical Generation (MWh) 780708.0 5049342 88846213
19. Unit Service Factor 100.0 85.2 68.4
20. Unit Availability Factor 100.0 85.2 68.4
21. Unit capacity Factor (MDC Net) 98.5 81.0 61.0
22. Unit capacity Factor (DER net) 98.5 81.0 61.0
23. Unit Forced Outage Rate 00.0 2.0 15.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A
  • Excludes hours under administrative hold (June 1, 1985 to May 24, 1991) 9610230149 961015 PDR ADOCK 05000259 R PDR

-