ML20151Z414

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Nov 1986 for Browns Ferry Nuclear Plant
ML20151Z414
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/30/1986
From: Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290325
Download: ML20151Z414 (3)


Text

, .

OPERATING DATA REPORT DOCKET NO. 50-259 DATE NOVEMBER 86 ,

PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT ONE
2. Reporting period: NOVEMBER, 1986
3. Licensed Thermal Power (MWt): 3293 -
4. Nataeplate Rating (Gross MWe): 1152
5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWo): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 720.0 8016 108176
12. Hours Reactor Was Critical 0.0 0 59521
13. Reactor Reserve Shutdown Hours 0.0 0 6997 14 Hours Generator On Line 0.0 0 58267
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh) 0.0 0 168066787 l 17. Gross Electric Generation (MWh) 0.0 0 55398130 018. Net Electric Generation (MWh) -5104.0 -40439 53716570 l 19. Unit Service Factor 0.0 0.0 53.86

! 20. Unit Availability Factor 0.0 0.0 53.86

21. Unit Capacity Factor (MDC Net) 0.0 0.0 46.63 ,
22. Unit Capacity Factor (DER Net) 0.0 0.0 46.63 t
23. Unit Forced Outage Rate 100.0 100.0 34.87 l 24. Shutdowns Scheduled Over Next 6 Month j (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period, ,

Estimat ed Date Of Startup:

CRevision l

9 85J8290325 800815 PDR ADOCK 05000259 R PNU d -., ;&p

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-259 Unit one DATE 12-01-86 COMPLETED BY K.L. Creamer l TELEPHONE (205)729-2960 MONTH November 1986*

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVSL (MWe-Net) (MWe-Net) 1 -7 17 -8

-7 18 -7 2

3 -6 19 -9 4 -7 20 -7

-8 21 -7 5

6 -7 22 -8 7 -7 23 -7 8 -7 24 -7 9 -6 25 -7 10 -7 26 -8 11 -7 27 -7

~

12 -7 28 -

-7 29 -7 13 14 -7 30 -7 __

15 -6 31 16 -7 INSTRUCTIONS On this format, list the average daily unit power level in MWo-Net for each day in the reporting month. Computo to the nearest whole megawatt.

  • Complete Revision (9/77)

l

,r a +an NUCLEAR PLANT OPERATING STATISTICS Browns Fe rry Plant Period Hours 720 Month November 19 RA Item No. Unit No. Un i t-1 Unit -2 Unit-3 Plan t 1 Average Houriv Gross Load. kW 0 0 0 0 2 Maximum Hour Net Generation. MWh 0 0 0 0

_ 3 Core Thermal Enerav Gen. GWD (t)2 0 0 0 0 4 Steam Gen. Thermal' Energy Gen. GWO (1)2 8 5 Gross Electrical Gen.. MWh 0 0 0 0 5 6 Station Use, MWh 5,104

  • 2,185 4,298 ll e W "

2 7 Net Electrical Gen., MWh 15.,104 * -2,185 -4,298 -11,.582 *

$ 8 Station Use. Percent 0 0 0 0 9 Accum Core Avg. Exposure. MWO/ Ton 1 0 0 0 C 10 CTEG This Month.106 BTU 0 0 0 ~U '

11 SGTEG This Month.106 BTU 12 13 Hours fleactor Was Critical 0 0 0 0 la Unit Use. Hours. Min. 0 0 0 0 15 Capacity Factor, Percent 0 0 0 0 16 Turbine Avail. Factor. Percent 0 0 100 ,

33.3 g 17 Generator Avail. Factor. Percent 0 0 100 33.3 0 18 Turbooen. Avail. Factor Percent 0 0 100 33.3 h 19 ~

Reactor Avail. Factor. oercent 0 0 100 33.3

$ 20 Unit Avail. Factor. Percent 0 0 0 0 21 Turbine Startues 0 0 0 0 22 Reactor Cold Startuos 0 0 0 0

?3 -

g 24 Gross Heat Rate. 8tuAWh 0 0 0 0 y 25 Net Heat Raie, Btu /kWh 0 0 0 0 3 26 L 27 g 28 Throttle Pressure, psig 0 0 0 0 d' 29 Throttle Temperature, *F 0 0 0 0

  • 5 30

, Exhaust Pressure. InHg Abs. 0 0 0 0 E, 31 Intake Water Temo., 'F 0 0 0 H

0 32 33 Main Feedwater, M lb/hr i 34

$ 35 36 37 Full Power Capacity, EFPo (3) 4 4 4 38 Accum. Cycle Full Power Days, EFPO 4 4 4 N 39 Oil Fired for Generation. Gallons 13,888 5 40 Oil Heatina Value. Btu /Gaf. 139,400 41 Diese Generation. MWh 58.R 42 l Max. Hour Net Gen. Max. Day Net Gen. Load 1 MWh Time Date MWh Date Factor, %

l

,=- 43 0 0

~

o Remarks: IFor 8FNP this value is MWO/STU and for SQNP and WBNP this value is MWD /MTU.

8 2(t) indicates Thermal Energy.

j (3) Information furnished by Reactor Analysis Group, Ch at t an ooRa.

(4) Administrative hold.

I

  • Revision )

,,) ~ . - -A._-. M Date Submitted Date Revised e