Monthly Operating Repts for Oct 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3
ML20199D143
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/31/1997
From: Abney T, Davenport J
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9711200270
Download: ML20199D143 (13)


Text

  • BlA v a n .4, v . , 4,. ~ . . i, rsvnto.no % ,4sw, wo November 13, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - OCTOBER 1997 MONTHLY OPERATING REPORT The en..osure provides the October 1997 Monthly Operating Report as required by BFN Technical Specifications Section 6.9.1.3.

If you have any questions concerning this matter, please call me at (205) 729-2636.

Sincerely, l f f

. .. Abney Manager of L . T. h g and Indu ry Af sirs b. h ' I j Enclosure cc: See page ? l 1 n at t=O

.;. v t,1 ; s 9711200270 971031 PDR ADOCK 05000259:

!!!hh h k!k

I i

U.S. Nuclear Regulatory Commission

'Page*2 November'13, 1997 i

I Enclosure cc -(Enclosure) :

Mr. Mark.S. Lesser, Branch Chief i

0. S. Nuclear Regulatory Commission Region'II-61 Forsyth-Street, S.W. .

Suite 23T85 t Atlanta, Georgia 30303-Mr. Frederick J. Heb'3on, Director Project Directorate II-4 Division of Reactor Projects I-II

-Office of Nuclear Reactor

  • Regulation, Mail 13 H3 Washington, D.C. 20555 INPO Records Center Institute of Nuclear Power Operations 700 3alleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission

. Region II. _ _

61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 Ms. Barbara Lewis-McGraw-Hill-Companies 1200 G Street, N.W.

Suite 1100 Washington, D.C. 20005-3802 l:

(

L

ENCLOSURE  ;

4 i

1 TENNESSEE VALLEY AUTHORITY I f

BROWNS FERRY NUCLEAR PLANT (BFN) ,

MONTHLY OPERATING REPORT OCTOBER 1997  ;

UNIT 1 DOCKET NUMBER 50-9.59 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

l OPERATIONAL SUt44ARY OCTOBER 1997 F

BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit i remains shutdown on administrative hold to resolve various TVA and 11RC concerns. Unit I has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual  !

of reporting hours is suspended since-the unit has a maxiraum dependable capacity of zero MWe. Accordingly, TVA does not consider reporting cumulative hours for the period beginning June.1, 1985, when calculating the operating status variables. ,

l BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of october, Unit 2 generated 231,400- megawatt hours gross electrical power and operated at a net capacity .

factor of 28.2 percent. Unit 2 shutdown at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 27, 1997, for the Cycle 9 refueling outage. The unit resumed operation at 0218 hours0.00252 days <br />0.0606 hours <br />3.604497e-4 weeks <br />8.2949e-5 months <br /> c1 October 19, 1997.

The duration of the refueling outage was 21 days and 15.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. '

After resuming operation, the unit experienced an automatic scram on October 28, 1997, due to a reactor low water level  :

signal caused by a pressure perturbation in the Electro-liydraulic Control (EliC) System. The unit resumed operation at 1002 hours0.0116 days <br />0.278 hours <br />0.00166 weeks <br />3.81261e-4 months <br /> on October 30, 1997 As of October 31, 1997, Unit 2 has operated continuously for 2 days.

BROWNS FERRY NUCLEAR PLANT UNIT 3 j For the month of October, Unit 3 generated 799,790 megawatt hours gross electrical power with a net capacity factor of 98.4 percent. As of October 31, 1997, Unit 3 has-operated continuously for 232 days, i

i i

E1 j l

l

l 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-259 UNIT NO. ONE DATE: Nov. 15, 1997 COMPLETED DY: J. W. Davenport TELEPHONE 205-729-2690 MONTH October 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20. 0
5. 0 21. 0
6. 0 22. 0
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0
10. 0 26. O
11. 0 27. 0 12 0 28. 0
13. 0 29. 0
14. 0 30. 0
15. 0 31. O l- 16. 0 l

t

{

l E2 l

l l - .-..

l

\

AVERAGE DAILY UNIT POWER LEVEL r

l DOCKET No. 50-260 UNIT No. TWO DATE: - Nov. 15, 1997 l l

COMPLETED BY: -J. W. Davenport TELEPHONE 205-729-2690 I Mot:TH October 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY (MWe-Net) (MWe-Net)  ;

1. 0 17. 0
2. 0 18. 0
3. 0 19. 251

~4. 0 20, 824

5. 0 21. 957 I
6. 0 22, 1049
7. 0 23. 1049
8. 0 24. 1086 ,
9. 0 25, 1101 -l
10. 0 26. 1111
11. 0 27, 780 h

12 0 28. 0

13. 0 29. 0
14. 0 30, 129
15. 0- - 31 1076
16. O i

E-3 3

-,w + - - - - - .r- sv er w, ,m.4 - - - , ,-y-,-

,---g.-,,-n,--nenn m- -a g . , , mm,- --m.w,- nw-- e g- ,,,,w+~,- ,ne, --m--s er > g - e s3--

. _ . . _ . _ - . . - _ . -._._ _ . - - . _ __-_ee_ _ _ ... _ . _ _ _ _ _ _ _ _ _ _ _ __ _ __ _

i AVERAGE DAILY UNIT POWER LEVEL

?

DOCKET NO. 50-296 UNIT NO. THREE DATE: Nov. 15, 1997 >

COMPLETED BY: J. W. Davenport TELEPHONE -205-729-2690 HONTH October 1997 e ,

AVERAGE DAILY POWER LEVEL  !

AVERAGE DAILY POWER LEVEL DAY DAY (MWe-Net) (MWe-Net)

1. 1069 17, 1079
2. 1076 18. 1071
3. 1077 19. 1082-
4. 558 20. 1106
5. 813 21. 1096
6. 1054 22, 1096
7. 1065 23. 1097
8. 1094 24. 1092
9. 1090 25. 1096 10, 1090 26. 095 11, 942 27. 1097

- 12 940 28. .1094

13. 1069 29, 1097

' 14. 1092 30. 1091

- 15. 1032 31, 1101-

16. 1082

- E-4 T

, - - . 4ver-+we,-o,~v-.v- ,em-v.,c+,--w,-=w .n5-.*- e 4., =<, = . . , * - - -c,+rwe-or---- t---se-e.- .

e wh-e *--. --.-,a

, w .-.e-+wr- ee =<w-- e- -

-v - e e->-

OPERATING DATA REPORT Docket No. 50-259 Date: Narember 15.1997 Completed By: L_.W. Daveano.11 Telephone: 205-729 2600

1. Unit Name: DENNE. nil).
2. Reporting Period: October 1997
3. Licensed Thermal Power (MW ): 3 91
4. Nameplate Rating (Gross Mwe): J ].S
5. Design Electrical Rating (Net hiwe): 1065
6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capaclty (Net MWe): 0
8. If changes Occur in Capacity Rating (item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if any (net MWe): 0 10 Reasons for Restrictions,if any: Administrative lloid This Month Yr-To Date Cumulative' i 1. Ilours in Reporting Period 0 0 95743
12. Number ofIlours Reactor was Critical 0 0 59521
13. Reactor Reserve Shutdowu llours 0 0 6997
14. Ilours Generator On Line 0 0 58267
15. Ur.d Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWh) 0 0 168066787
17. Gross Electric Energy Generated (MWh) 0 0 55398130
18. Net Electrical Energy Generated (MWh) 0 0 53796427
19. Unit Senice Factor 0 0 60.9
20. Unit Availability Factor 0 0 60.9
21. Unit Capacity Factor (Using MDC Net) 0 0 52.8
22. Unit Capacity Factor (Using DER Net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6
24. Shutdowns Scheduled Over Next 6 Months (Type.

Date, and Duration of Each): N/A

- 25. If Shutdown at End of Report Period, Estimate Date of Startup: To Be Determined a

Excludes hours under Administrative lloid (June I,1985 to present)

E-5

l OPERATING DATA REPORT Docket No. 50-260 Date: November 15.1997 Completed By: 1 W. Davenport Telephone: 205-729 2690

1. Unit Name. BFN Unit 2
2. Reporting Period: .

October 1997

3. Licensed Thermal Power (hiWt): En
4. Nameplate Rating (Gross hiwe): .l L1
5. Design Electrical Rating (Net hiwe): 1065
i. . hiaximum Dependable Capacity (Gross hiWe): 1998.4
7. hiaximum Dependable Capacity (Net htWe): .LO61 6
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if any (net hiWe): N/A
10. Reasons for Restrictions, if any: N/A This Month Yr-To Date Cumulative *
11. Ilours in Reporting Period 745.0 7296.0 146911
12. Number ofilours Reactor was Critical 287.0 6693.0 105342
13. Reactor Reserve Shutdown llours 0.0 0.0 14200
14. Ilours Generator On Line 268.0 6666.0 102949
15. Unit Reserve Shutdown llours 0.0 0.0 0
16. Gross Thermal Energy Generated (htWh) 704328.0 21049008 305236108
17. Gross Electric Energy Generated (htWh) 231400.0 6957850 101379218
18. Net Electrical Energy Generated (htWh) 223631.0 6786045 98619210 19 Unit Service Factor 35.9 91.4 70.1
20. Unit Availability Factor 35.9 91.4 70.1
21. Unit Capacity Factor (Using h1DC Net) 28.2 87.3 63.0
22. Unit Capacity Factor (Using DER Net) 28.2 87.3 63.0
23. Unit Forced Outage Rate 13.8 1.6 14.3
24. Shutdowns Scheduled Over Next 6 hionths (Type, Date, and Duration of Each): The Unit 2 c3cle 9 Refueling Outage llegan at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on 9/27/97, and completed at 0218 hours0.00252 days <br />0.0606 hours <br />3.604497e-4 weeks <br />8.2949e-5 months <br /> on 10/19/97. The duration of the outage was 21 days, and 15.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
25. If Shutdown at End of Report Period, Estimate Date of Startup: N/A
  • Excludes hours under Administrative lloid (June 1.1985 to May 24,1991)

E-6

l OPERATING DATA REPORT Docket No. 50 296 Date: November 15.1997 Completed By: 1 W. Davenport Telephone: 205-729-2690

1. Unit Name: HFN Unit 3 ,
2. Reporting Period: October 1997
3. Licensed Thermal Power (MWt): 73 92
4. Nameplate Rating (Gross Mwe): ,[Jf1 <
5. Design Electrical Rating (Net Mwe): 1065 6, Maximum Dependable Capacity (Gross MWe): 1998.4
7. Maximum Dependable Capacity (Net MWe): 1065 8, if changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if any (net MWe): N/A
10. Reasons for Restrictions, if any: N/A This Mo!Lth Yr-To Date Cumulative *
11. Ilours in Reporting Period 745.0 7296.0 90133
12. Number ofIlours Reactor was Critical 745.0 6856.0 61610
13. Reactor Reserve Shutdown llours 0.0 0.0 5150
14. Ilours Generator On Line 745.0 6838.2 60257
15. . Unit Reserve Shutdown liours 0.0 0.0 0
16. Gross Thermal Energy Generated (MWh) 2377944.0 21439680 182670337
17. Gross Electric Energy Generated (MWh) 799790.0 7131200 61155340
18. Net Electrical Energy Generated (MWh) 780761.0 6952145 58634276 19 Unit Service Factor 100.0 93.7 66.9
20. Unit Availability Factor 100.0 93.7 66.9
21. Unit Capacity Factor (Using MDC Net) 98.4 89.5 61,1
22. Unit Capacity Factor (Using DER Net) 98.4 89.5 61.1
23. Unit Forced Outage Rate 0.0 e 17.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each'r N/A

' 25. If Shutdown at End of Report Period, Estimate Date of Startup: N/A

  • Excludes hours under Administratise lloid (June 1,1985 to November 19,1995)

E7

4 UNITSHUTDOWNS AND POWER REDUCTIONS -

REPORT MONTH: OCTOBER 1997 .

i DOCKET NO: 50-259 '

UNIT NAME: BFN-1 DATE: November 15,1997 COMPLETED BY: J. W. Davenport TELEPHONE: (205) 729-2690 2

Not . Date Type' Duration Reason ~ Method of Ilcu; ~ Syssesu Consponent Cause and Corrective Acties to Prevent (Homes) Shutting : Event Report Code

  • Code' Reenrremec 1 Down . No. :

Reacto/ ' i i

1 06/01/85 S 745 F 4 N/A N/A N'A Administratr;c hold to resohr various TVA j and NRC concerns i i

s 5

' F: Forced

  • Reason: 'Methad
  • Exhibit G -Instructions for(NUREG  ;

j S: Scheduled A-Eqmpment Failure (Explain) 141anual Preparation of Data Entry sheets -

B4taintenance or Test 24fanual Scram for Licensee Event Report (LER) ,

C-Refueling 3-Automatic Scram File- NUREG - 1022 l D-Regulatory Restriction 4-Continuation of Existing  ;

d E-Operator Training and License Outage  !

3- Examination 5-Reduction 'Eshibit I-Saane Source j F-Administrative 9-O'her

G-Operational Error (Explain)

H-Other (Explain) i i'

E-8

~.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1997 -

DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: November 15, l'997 COMPLETED BY: J. W. Dcvenport TELEPHONE: (205) 729-2690 No. ' Date Type' l Duration Reasoe* - Method of Licensee Systems Component Cause and Conective Actice to Prevent 5

(Heers) Shetting Event Report Codf Code Recorrence Dowe . No.

R6scio/ L i

4 10/0I/97 S 434 C 4 N/A N/A N/A The Unit 2 Cycle 9 refueling outage began  !

at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 27,1997 and  !

continued until 0218 hours0.00252 days <br />0.0606 hours <br />3.604497e-4 weeks <br />8.2949e-5 months <br /> on October 19, ,

1997. The duration ofthe refueling outage l was 21 davs and 153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br />.

I 5 10/28/97 F 43 A 3 50-260/97007 N/A N/A The unit experienced an automatic scram at ,

i 1508 hours0.0175 days <br />0.419 hours <br />0.00249 weeks <br />5.73794e-4 months <br /> on October 28,1997 due to a

low reactor water level signal caused by a
pressure perturbation in the Electro- l' Hydraulic Control (EHC) System. The unit resumed operation at 1002 hours0.0116 days <br />0.278 hours <br />0.00166 weeks <br />3.81261e-4 months <br /> on l .

October 30,1997.

' F: Forced 2 g ,,,,, 2 Method

  • Exhih;t G -Instrections for(NUREG S: Scheduled A-Equipment Failare (Explain) 1-Manual Preparatian of Data Entry sheets B-Maintenance orTest 2-Manual Serr i for Licensee Event Report (LER) i C-Refueling 3-Acamatic Scram Fil,:- NUREG - 1922 D-Regulatory Restriction 4-Continuation of Existing E-OperatorTraining and License Outage Examination 5-Rc4xtion ' Exhibit I-Samme Source F-Administrative 9-Other G-Operational Error (Explain) f' i H-Other (Explain) i E-9 i

l

UNITSHUTDOWNS AND POWER REDUCrIONS

  • REPORT MONTH: OCTOBER 199s -

DOCKET NO: 50-296 '

i UNIT NAME: BFN-3  ;

DATE: November 15,1997 COMPLETED BY: J. W. Davenport '

TELEPHONE: (205) 729-2690 '{

2 No. Date  ; Type' Darstion Reason

  • Method of Licensee Systems Component Cause and _Cometive Acties to Pervent  :

.(Homes)1 Shutting Event Report Come* Cedf Recomece Dews No. -

l

.~

j -

j 4

5 10/04/97 F 0 B 5 N/A N/A N/A Power reduction to perform .naintenance on the 3A Recirculation Pump tt, correct  !

oscillations in flow and motor current.

!. I i

l i ' F: Forced

  • Reason:
  • Method
  • Exhibst G-lawructions for(NUREG ,

S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparateen of Data Entry sheets  ;

B-Maintenance or Test 2-Manual Scram for Licensee Esent Report (LER) ,

C-Refueling 3-Automatic Scram File- NUREG - 1922

D-Regulatory Restriction 4-Continuation of Existing  !

E-Operator Training and License Outage i Examination 5-Reduction ' Esbibit I-Sacee Scorce I F-Administratin: 9-Other

G-Operational Error (Explain)

H-Other (Explain) i I

l  !

i E-10 i' i

i