Text
_ _ _ _
OPERATING DATA REPORT DOCKET NO.
50-259 DATE JUNE 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE 2.
Reporting period: JUNE, 1987
- 3. Licensed Thermal Power (MWt): 3293 4
Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065 6.
Maximum Dependable Capacity (Gross MWe): 1098.4 7.
Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.
Power Level To which Restricted, If Any (Net MWe). N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 720.0 4343 113263
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130 018. Net Electric Generation (MWh)
-1480.0
-20659 53690961
- 19. Unit Service Factor 0.0 0.0 51.44
- 20. Unit Availability Factor 0.0 0.0 51.44
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 44.51
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 44.51
- 23. Unit Forced Outage Rate 100.0 100.0 38.37
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
0 Revision 8808290336 090015 6
PDR ADOCK 05000259 R
PNV r
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit One DATE 07-01-87 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH June 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-1 17
-2 2
-2 18
-2 3
-2 19
-2 4
-2 20
-2 5
-2 21
-2 6
-2 22
-2 7
-2 23
-2 8
-2 24
-2 9
-2 25
-2 10
-2 26
-2 11
-6 27
-2 12
-3 28
-2 13
-2 29
-3 14
-2 30
-2 15
-2 31 r
16
-2 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Not for each day in the reporting month.
Compute to the nearest wholo megawatt,
- Completo Revision (9/77)
n.s r m a coup 4.su NUCLEAR PLANT OPERATING STATISTICS BROWNS FERRY NUCLEAR Plan t Period Hours 720 Month June 19 87 Item j
No.
Unit No.
' Unit 2 Unit 3 Plant Unit I 1
Averace Hourfy Gross Load. kW 0
0 0
0 2
Maximum Hour Net Generation, MWh 0
0 0
0
'l
'3 Core ThermalEnergy Gen. GWD fH2 0
0 0
0 4
Steam Gen. Thermal Energy Gen., GWD (t)2 5
5 Gross Electrical Gen., M'Wh O
O-0 0
3 6
Station Use, MWn 1480*
2178 5221 8879" E
7 Net Electrical Gen., MWh
-1480*
-2178
-522L
-8879" 5
8 Station Use. Percent 0
0 0
0 1
9 Accum. Core Avg. Excosure, MWD / Ton 1 0
0 0
0 10 CTEG This Month,106 BTU 0
0 0
((
11 SGTEG This Month,1068TU 12 13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use, Hours. Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 S
16 Turbine Avail. Factor. Percent 0
0 100_
33.3
)
17 Generator Avail. Facter. Percent 0
0 100 33.3 e
18 Turbooen. Avail. Factor. Percent 0
0 100 33.3 19 peacter Avail. Factor-Percent 0
0 100 11.3 2
20 Unit Avail. Factor. Percent 0
0 0
0 21 Turbine Startues 0
0 0
0 22 Reactor Cold Startuos 0
0 0
0 11
- f 24 Gross Heat Rate,8tu/kWh 0
0 0
0 25 Net Heat Rate, Blu/kWh 0
0 0
0 5
26 N
2_?
g _ 28 Throttle Pressure, pssg n
n n
n ct 29 Throttle T_emperature. *F n
n n
n
<j 30 Exhaust Pressure, inHg Abs.
0 0
0 0
g 31 Intake Water Temp., 'F 0
0 0
0 32 33 Main Feedwater M lb/hr I
34 35 36 37 Full Power Capacity, EFPO ( 3) 4 4
4 38 Accum. Cycle Full Power Days, EFPD 4
4 4
j 39 Oil Fired for Generation, Gallons 2__ 40 Oil Heatino Value. 8tu/ Gal.
4059 L39.600
__41 mestl Generation. MWh 25.2 49 Max. Hour Net Gen.
l Max. Day Net Gen.
Load MWh Time Date MWh Date Factor, %
3 43 0
0 0
IFor 8FNP this value is MWD /STU and for SONP and W8NP this value is MWD /MTU.
O Remarks:
j 2(t) indicates Thermal Energy.
3 1
'in f orm e lon furnished by Reactor Analysis Groun. Chattanooga 4 Administrative Hold
/)
m r
- Revision
~
d
/
Date Submitted -
Date Revised
' ^
s A_. d m
g3
~
Plant Superin(encent
. _ _ _ - _ _ _