OPERATING DATA REPORT
~
DOCKET NO.
50-259 DATE JULY 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE
- 2. Reporting period: JULY, 1987
- 3. Licensed Thermal Power (MWt): 3293 4
Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reason: N/A
- 9. Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 744.0 5087 114007
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Elrictric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-1685.0
-22344 53689276
- 19. Unit Service Factor 0.0 0.0 51.11
- 20. Unit Availability Factor 0.0 0.0 51.11
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 44.22
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 44.22
- 23. Unit Forced Outage Rate 100.0 100.0 38.86
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
- Revision 8808290337 880015 6
PDR ADOCK 05000259 R
PNU
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit One DATE 08-01-87 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH Ju1Y 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-3 17
-2 2
-2 18
-1 3
-2 19
-2 4
-2 20
-2 5
-2 21
-2 6
-2 22
-3 7
-3 23
-3 8
-2 24
-3 9
-3 25
-2 10
-2 26
-2 11
-3 27
-2 12
-3 28
-2 i
13
-3 29
-2 14
-3 30
-3 15
-3 31
-2 i
16
-3 INSTRUCTIONS On this format, list the average daily unit power icvel in MWe-Net for each day in the reporting month. Compute to the nearest wholo mosawatt.
- Complete Revlolon (9/77)
TV A M82A (OW44tl NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plant feriod Hour $
744 Month _.Iuly
}9 R7 Item No.
Unit No.
U1 U2 U3 PLANT 1
Aversee Hourly Gross Loar1. kW 0
0 0
0 2
Maximum Hour Net Generation. MWh 0
0 0
0 3
Core Therma! Energy Gen. GwD (t)2 0
0 0
0 4
Steam Gen. Thermat Energy Gen., GWO (t)2
,j 5
Gross Electrical Gen., MWh 0
0 0
0 g
6 Station Use, MWh 1685*
2154 5349 9188*
7 Net Electrical Gen., MWh
-1685*.
-2154
-5349
-9188*
d 8
Station Use, Percent
'/6 ~
0 0
0 9
Accum. Core Avg. Exposure MWD / Ton!
0 0
0 7
10 CTCG This Month,10DBTU 0
0 0
0 11 SGTEG This Month,106 BTU 1?
13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use, Hours. Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 2
16 Turbine A< ail. Factor. Percent 0
0 100 33.3 3
17 Generator Avait. Factor Derr.g 0
0 100 33.3 0
18 Turbocen.. Avail. Factor. Percent 0
0 100 33.3 19 Reactor Avail. F3ctor. Percent 0
0 100 33.3 2
20 Unit Ava,s. r ctor. Percent 0
0 0
0 a
21 Turbine Startuos 0
0 0
0 22 Reactor Cold sintuns 0
0 0
0 v
g 24 Gross Heat Rate. Btu /kWh 0
0 0
0 j
25 Net Heat Aste, Gtu/kWh 0
0 0
0 E
26 D
27 g
28 Throttle Presture. osig 0
0 0
0 g
29 Throttle Temperature. 'F 0
0 0
0
- j 30 Exhaust Pressure, inHg Abs.
0 0
0 0
E 31
_ Intake Water Temo., 'F 0
0 0
0 F
32 33 Main Feedwater M lb/hr i
34 35 36 37 Futt Power Capacity, EFPO (3) 4 4
4 38 Accum. Cycle Full Power Days. EFPO 4
4 4
d 39 Oil Fired for Generation, Gallons 4602 5
40 Oi! Heatino Value. Btu / Gat.
139,100 i
33 6 41 Ossef Generation. MWh 49 Man. Hour Net Gen.
Mar. Day Net Gen.
Load MWh Time Date MWh Date F.vtor, % _
a 43 0
0 0
Remarks: A For BFNP this value is MWD /STU and for SONP and WBNP this value is MWD /MTU.
N..
l 2(t) indicates Ther' i Energy.
3 1 Information furnished by Reactor Analysis Group, Chattanooga 4 Administrative Hold r
/