OPERATING DATA REPORT DOCKET'NO.
50-259 DATE FEBRUARY 87 -
PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit. fame: BROWNS FERRY UNIT ONE
- 2. Reporting period: FEBRUARY, 1987
- 3. Licensed Thermal Power (MWt). 3293 4
Nameplate Rating (Gross MWe). 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 672.0 1416
.110336
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997
- 14. Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066707
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-4842.0
-10401 53701219
- 19. Unit Service Factor 0.0 0.0 52.81
- 20. Unit Availability Factor 0.0 0.0 52.81
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 45.70
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 45.70
- 23. Unit Forced Outage Rate 100.0 100.0 36.41
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
- Rsvision 8008290331 880015 DR ADOCK 0000 9
6
-n-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit One DATE 03-01-87 COMPLETED BY K.L. Creamer TELEPHONE (205)729-2960 MONTH February 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-8 17
-7 2
-7 18
-8 3
-7 19
-8 4
-8 20
-7 5
-8 21
-7 6
-7 22
-7 7
-8 23
-6 8
-8 24
-6 9
-8 25
-8 10
-8 26
-5 11
-8 27
-7 12
-7 28
-7 13
-7 29 14
-7 30 15
-7 31 r
16
-7 INSTRUCTIONS On this format, list the average daily unit power icvel in MWo-Not for each day in the reporting month.
Compute to the nearest whole megawatt.
- Completo Revision (9/77)
TV A M8 2 A (ONP+8 0 NUCLEAR PLANT OPERATING STATISTICS Browns Ferrv Nuclear Plant Period Hours 672 Month February 19 87 ltem No.
Unit No.
U-l U-2 U-3 Plant 1
Averace Hourly Gross Load. kW 0
0 0
0 2
Maximum Hour Net Generation. M9/h 0
0 0
0 3
Core Thermal Energy Gen. GWD (t)2 0
0 0
0 4
Steam Gen. Thermal Energy Gen., GWD (t)2 8
5 Gross Electrical Gen., MWh 0
0 0
0 f
6 Station Use, MWh 4842
- 1426 2453 8849
- 7 Net Electrical Gen., MWh
-4842 *
-1426
-2453
-88_49
- h 8
Station Use, Percent 0
0 0
0 9
Accum. Core Avg. Exposure. MWD / Ton 1 0
0 0
0 10 CTEG This Month.106 BTU O
0 0
0 6
11 SGTEG This Month,10 BTU 12 13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use. Hours Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 y
16 Turbine Avail. Factor. Percent 0
0 100 33.3 17 Generator Avail. Factor. Percent 0
0 100 11.1 g
C 18 Turbooen. Avail, Factor. Percent 0
0 l_00 33.1 19 Reactor Avail. Factor. Percent O
O 100 11_1 E
20 Unit Avail. Factor. Percent 0
0 0
0 21 Turbine Startuos 0
0 0
0 22 Reactor Cold Startuos 0
0 0
0
?1 3
24 Gross Heat Rate,8tu/kWh 0
0 0
0
.{
25 Net Heat Rate, Btu /kWh 0
0 0
0
.4 26 U
27 g
28 Throttle Pressure, osig 0
0 0
0 d'
29 Throttle Temperature, 'F 0
0 0
0 y
30 Exhaust Pressure, inHg Abs.
0 0
0 0
E 31 Intake Water Temo., *F 0
0 0
0 H
32 33 Main Feedwater, M lb/hr
(
y 34 l
35 36 37 Full Power Capacity, EFPD (3) 4 4
4 38 Accum. Cycle Full Power Days. EFPD 4
4 4
j 39 Oil Fired for Generation, Gallons 516 2
40 Oil Heatino Value. Btu / Gal.
138.800 41 Diesd Generation. MWh 21.0 0
Max. Hour Net Gen.
Max. Day Net Gen.
Load MWh Time Date MWh Da te Factor. %
3 43 0
0 0
O Remarks: IFor OFNP this value is MWD /STU and for SONP and WBNP this value is MWD /MTU.
j 2(t) indicates Thermal Energy.
i 3
(3)
Information furnished hv Donctor Anniveie Crnon. chatennnnen (4)
Administrative hold 1
l l
Revisiomf/
/
j l
Date Submitted-9/d D Date Revised g
30