r
.c2 RATING DATA REPORT DOCKET NO.
50-259 DATE MARCH 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE 2.
Reporting period: MARCH, 1987
- 3. Licensed Thermal Power (MWt): 3293 4.
Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065 6.
Maximum Dependable Capacity (Gross MWe): 1098.4 7.
Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.
Power Level To which Restricted, If Any (Net MWe)- N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 744.0 2160 111080
- 12. F.'ours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997
- 14. Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130 018. Net Electric Generation (MWh)
-4705.0
-15106 53696514
- 19. Unit Service Factor 0.0 0.0 52.46
- 20. Unit Availability Factor 0.0 0.0 52.46
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 45.39
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 45.39
- 23. Unit Forced Outage Rate 100.0 100.0 36.92
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
CRevision g8 B2 9
9 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit One DATE 04-01-87 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH March 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-7 17
-6 2
-7 18
-7 3
-6 19
-7 4
-7 20
-7 5
-6 21
-6 6
-6 22
-6 7
-6 23
-6 8
-7 24
-6 9
-7 25
-7 10
-10 26
-6 11
-5 27
-6 12
-6 28
-6 13
-7 29
-7 l
14
-7 30
-3 15
-6 31
-3 16
-6 INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for cach day in the reporting month. Compute to the nearest whole megawatt.
- Complete Revision (9/77)
L.
tva 0:24 con #4SI)
NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plan t Period Hours
'744 Month Mnrch 19 87 Item No.
Unit No.
U-l U-2 U-3 Plant 1
Averace Hourly Cross Load, kW 0
0 0
0 2
Maximum Hour Net Generation. MWh 0
0 0
0
_ 3 C' ore Thermal Energy Gen. GWo (tP 0
0 0
0 4
Steam Gen. Therrrial Energy Gen., GWO 412 8
5 Gross Electrical Gen., MWh
.. 0 0
0 0
6 Station Use. MWh 4705
- 3203 2386 10,297*
7 Net Electrical Gen., MWh
-4705 "
-3203
-2386
-10,'297*
~
b 8
Station Use, Percent 0
0 0
0 9
Accum. Core Avg. Exposure. MWD /TonI O
O O
O
~
10 CTEG This Month.1068TU 0
0 0
0 6
11 SGTEG This Month.10 BTU 12
^
13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use, Hours. Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 3
16 Turbine Avail. Factor Percent 0
0 100 33.3 17 Generator Avail. Factor. Percent 0
0 100 33.3 18 Turbooen. Avail Factor. Percent 0
0 100 33.3 19 Reactor Avait. Factor. Percent 0
0 100 33.3 2
20 Unit Avail. Factor. Percent 0
0 0
0 21 Turbine Startuos 0
0 0
0 22 Reactor cold Startuos 0
0 0
0
?3 3
24 Gross Heat Rate, Btu /kWh 0
0 0
0 25 Net Heat Rato, Blu/kWh 0
0
.E 26 0
0 0
27 g
28 TMottle Pressure, osig 0
0 0
0 e
29 Throttle Temperature, *F 0
0 0
0
.,5 30 Exhaust Pressure. InHg Abs.
0 0
0 0
.E 31 Intake Water Temo., *F 0
0 0
0 H
32 33 Main Feedwater. M ib/hr a
y 34
~
h 35 36 37 Full Power Capacity. EFPO (3) 4 4
4 38 Accum. Cycle Full Power Days. EFPO 4
4 4
j 39 Oil Fired for Generation, Gallons 627 E
40 Oi! Heatino Value. 8tu/ Gal.
139.500 t
41 0:+1eJ Generation. MWh 25,2
.t s l
Max. Hour Net Gen.
Max. Day Net Gen-Load VWh Time Date MWh Date Factor, %
2 43 0
0 0
S Remarks: IFor GFNP this value is MWD /STU and for SONP and WBNP this value is MWD /MTU.
2(t) indicates Thermal Energy.
o I
j (3) Information furnished by Reactor Analysis Group. Chattanooca (4) Administrative Hold
- Revision i
^4M DJte Submitted Date Revised
.s.,
,'Y Plant Sq:)c6nte-S ent i