ML20151Z481

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for Oct 1987 for Browns Ferry Nuclear Plant
ML20151Z481
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/31/1987
From: Crawford J, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290340
Download: ML20151Z481 (3)


Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ -

OPERATING DATA REPORT DOCKET NO. 50-259 DATE OCTOBER 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT ONE
2. Reporting period: OCTOBER, 1987
3. Licensed Thermal Powcr (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net NWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To which Restricted. If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 745.0 7296 116216
12. Hours Reactor Was Critical 0.0 0 59521
13. Reactor Reserve Shutdown Hours 0.0 0 6997
14. Hours Generator On Line 0.0 0 58267
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh) 0.0 0 168066787
17. Gross Electric Generation (MWh) 0.0 0 55398130
  • 18. Net Electric Generation (MWh) -1736.0 -27314 53684306
19. Unit Jervice Factor 0.0 0.0 50.14
20. Unit Availability Factor 0.0 0.0 50.14
21. Unit Capacity Factor (MDC Net) 0.0 0.0 43.37
22. Unit Capacity Factor (DER Net) 0.0 0.0 43.37
23. Unit Forced Outage Rate 100.0 100.0 40.24
24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period.

Estimated Date Of Startup: '

CRavision BBP 790340 880815 , 6 PDR ADOCK 05000259 R PNV w

AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-259 Unit One DATE 11-01-87 COMPLETED BY J.D. Crawford TELEPHONE G05)729-250_7 d

MONTH October 1987*

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -1 17 -2 2 -3 18 -2 3 -2 19 -2 4 -2 20 -3 5 -2 21 -2 6 -2 22 -2 7 -2 23 -6 8 -2 24 -2 9 -2 _

25 -2 10 -2 26 -2 11 -2 27 -

-2 12 -2 28 -2 13 -2 29 -2 14 -3 30 -2 15 -3 31 -2 r

16 -3 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest wtole megawatt.

  • Complete Revision (9/77)

TVA 7382A (DNM.au NUCLEAR PLANT OPERATING STATISTICS ,

Browns Ferry Nuclent Plant Period Hours .745 Month n,.enhor gg g7 Item No. Unit No. Unit 1 Unit 2 Unit 3 Plant I:

1 Averace Hourly Gross Load. kW 0 0 0 0 ,

2 Maximum Hour Net Generation. MWh 0 0 0 0 3 Core Thermal Energy Gen. GWO f t)2 0 0 0 0 4 Steam Gen. Thermal Energy Gen. GWO f t)2 j 5 Gross Electrical Gen. MWh 0 0 0 0  ;

6 Station use. MWh 1736

  • E cm7 ni7 l0970
  • 7 Net Electrical Gen.. MWh E -p36
  • gm 7 _ m ., M0970 *

$ 8 Station Use Percent U' O O "t7 -

9 Accum. Core Avg. Exposure. MWO/Toni 0 0 0 0

~

10 CTEG This Month.100 BTU 0 0 0

' ~

0 11 SGTEG This Month.106 BTU 12 13 Hours Reactor Was Critical 0 0 0 0

__14 Unit Use, Hours Min. 0 0 0 0 15 Capacity Factor, Percent 0 0 0 0 0 16 Turbine Avail. Factor. Percent 0 0 100 33.3 17 Generator Avail. Factor. Percent 0 0 100 33.3 la Turbocen. Avail. Factor. Percent 0 0 100 33.3

$ to Acactor Avail. r3ctor. o.reent 0 0 100 33.3 2 20 Unit Avail. Factor. Percent 0 0 0 0

_21_._ Turbine Startues 0 0 0 0 22 mesctor Cold Startuos 0 0 0 0 23 3 24 Gross Heat Rate 8tu/kWh 0 0 0 0

$ 25 Net Heat Rate. Btu /kWh 0 0 0 0 1 26 D 27 g 28 Throttle Pressure, osig 0 0 0 0 g 29 Throttle Temperature, *F 0 0 0 0

$ 30 Exhaust Pressure. InHg Abs. 0 0 0 0 g 31 Intake Water Temo., *F 0 0 0 0 H 32 33 Main Feedwater. M Ib/hr i 34

$ 35 36 37 Full Power Capacity, EFPO (3) (4> (4) t*1 38 Accum. Cycle Full Power Days. EFPO (4) (4) (4) j 39 Oil Fired for Generation. Gallons 17,160 2 40 Oil Heatino Va!ue. Btu / Gal. 139,800 41 Dieul G eneration. MWh a?

96.6 Max. Hour Net Gen. Max. Day Net Gen.

Load MWh Tirne Date MWh Date Factor %

2 43 0 0 0 3 Remarks: A For 8FNP this value is MWO/STU and for SONP and WONP this value is MWO/MTU.

j 2(t) indicates Thermal Energy.

3 (3) Information furnished by Reactor Analysis Groun. Chattanocen.

(4) Administrative hold.

  • /,

1 A /

  • I /;

Y <,

Date Submitted Date Revised ll.

2 x . . . . . . - . . . - .