ML20151Z481
| ML20151Z481 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/31/1987 |
| From: | Crawford J, Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20151Z364 | List: |
| References | |
| NUDOCS 8808290340 | |
| Download: ML20151Z481 (3) | |
Text
_ _ _ - _ _ _ _ _ _ _ _ _ _ -
OPERATING DATA REPORT DOCKET NO.
50-259 DATE OCTOBER 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE
- 2. Reporting period: OCTOBER, 1987
- 3. Licensed Thermal Powcr (MWt): 3293 4.
Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net NWe): 1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To which Restricted. If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 745.0 7296 116216
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997
- 14. Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-1736.0
-27314 53684306
- 19. Unit Jervice Factor 0.0 0.0 50.14
- 20. Unit Availability Factor 0.0 0.0 50.14
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 43.37
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 43.37
- 23. Unit Forced Outage Rate 100.0 100.0 40.24
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period.
Estimated Date Of Startup:
CRavision BBP 790340 880815 6
PDR ADOCK 05000259 R
PNV w
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-259 Unit One DATE 11-01-87 COMPLETED BY J.D. Crawford TELEPHONE G05)729-250_7 d
MONTH October 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-1 17
-2 2
-3 18
-2 3
-2 19
-2 4
-2 20
-3 5
-2 21
-2 6
-2 22
-2 7
-2 23
-6 8
-2 24
-2 9
-2 25
-2 10
-2 26
-2 11
-2 27
-2 12
-2 28
-2 13
-2 29
-2 14
-3 30
-2 15
-3 31
-2 r
16
-3 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest wtole megawatt.
- Complete Revision (9/77)
TVA 7382A (DNM.au NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclent Plant Period Hours
.745 Month n,.enhor gg g7 Item No.
Unit No.
Unit 1 Unit 2 Unit 3 Plant I:
1 Averace Hourly Gross Load. kW 0
0 0
0 2
Maximum Hour Net Generation. MWh 0
0 0
0 3
Core Thermal Energy Gen. GWO f t)2 0
0 0
0 4
Steam Gen. Thermal Energy Gen. GWO f t)2 j
5 Gross Electrical Gen. MWh 0
0 0
0 E
6 Station use. MWh 1736
- cm7 ni7 l0970
- E 7
Net Electrical Gen.. MWh
-p36
- gm 7
_ m.,
M0970
- 8 Station Use Percent U'
O O
"t7 -
9 Accum. Core Avg. Exposure. MWO/Toni 0
0 0
0
~
10 CTEG This Month.100 BTU 0
0 0
0
~
11 SGTEG This Month.106 BTU 12 13 Hours Reactor Was Critical 0
0 0
0
__14 Unit Use, Hours Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 0
16 Turbine Avail. Factor. Percent 0
0 100 33.3 17 Generator Avail. Factor. Percent 0
0 100 33.3 la Turbocen. Avail. Factor. Percent 0
0 100 33.3 to Acactor Avail. r3ctor. o.reent 0
0 100 33.3 2
20 Unit Avail. Factor. Percent 0
0 0
0
_21_._ Turbine Startues 0
0 0
0 22 mesctor Cold Startuos 0
0 0
0 23 3
24 Gross Heat Rate 8tu/kWh 0
0 0
0 25 Net Heat Rate. Btu /kWh 0
0 0
0 1
26 D
27 g
28 Throttle Pressure, osig 0
0 0
0 g
29 Throttle Temperature, *F 0
0 0
0 30 Exhaust Pressure. InHg Abs.
0 0
0 0
g 31 Intake Water Temo., *F 0
0 0
0 H
32 33 Main Feedwater. M Ib/hr i
34 35 36 37 Full Power Capacity, EFPO (3)
(4>
(4) t*1 38 Accum. Cycle Full Power Days. EFPO (4)
(4)
(4) j 39 Oil Fired for Generation. Gallons 17,160 2
40 Oil Heatino Va!ue. Btu / Gal.
139,800 41 Dieul G eneration. MWh 96.6 a?
Max. Hour Net Gen.
Max. Day Net Gen.
Load MWh Tirne Date MWh Date Factor %
2 43 0
0 0
3 Remarks: A For 8FNP this value is MWO/STU and for SONP and WONP this value is MWO/MTU.
j 2(t) indicates Thermal Energy.
3 (3)
Information furnished by Reactor Analysis Groun. Chattanocen.
(4) Administrative hold.
/,
1 A /
- I /;
Y ll Date Submitted Date Revised 2
x
... -... -.