OPERATING DATA REPORT DOCKET NO.
50-259 DATE DECEMBER 86.
PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE 2.
Reporting period: DECEMBER, 1986
- 3. Licensed Thermal Power (MWt): 3293 4.
Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065 S. Maximum Dependable Capacity (Gross MWe): 1098.4 7.
Maximum Dependable Capacity (Net MWe): 1065 8
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.
Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 744.0 8760 108920
- 12. Hours Reactor bas Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Ger.?rator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130 o18. Net Electric Generation (MWh)
-4950.0
-45389 53711620
- 19. Unit Service Factor 0.0 0.0 53.50
- 20. Unit Availability Factor 0.0 0.0 53.50
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 46.30
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 46.30
- 23. Unit Forced Outage Rate 100.0 100.0 35.41
- 26. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
1 0 Revision 8808290329 880815 9
PDR ADOCK 05000259 R
PNU
AVERACE DAILY UNIT POWER LEVEL.
DOCKET NO.
50-259 Unit One DATE 1-02-87 COMPLETED BY K.L. Crernmer TELEPHONE (205)729-2960 MONTH December 1986*
DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (efWe-Net)
(MWe-Net) 1
-7 17
-5 2
-7 18
-4 3
-8 19
-4 4
-7 20
-7 5
-7 21
-8 6
-7 22
-8 7
-8 23
-8 8
-7 24
-8 9
-7 25
-8 10
-7 26
-8 11
-7 27
-7 12
-8 28
-7 13
-7 29
-3 14
-7 30
-3 15
-7 31
-4 r
16
-7 INSTRUCTION 3 On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
- Complete Revision (9/77)
NUCLEAR PLANT OPERATING STATISTICS g.
Br mm Ferry hi mr Plant iod Hours 744 Month December 19 86 item No.
Unit No, t.'n i e -1 Un i t-2 i M e-1 D1 m e 1
Averace Hourly Gross Load, kW 0
0 0
0 2
Maximum Hoor Net Generation. NtWh n
n n
0 3
Core Thermal Enerav Gen. GWD (t)2 0
0 0
n 4
Steam Gen. Thermal Energy Gen., GWD lt)2 8
5 Gross Electrical Gen., MWh 0
0 0
0 j
6 Station Use, MWh 4 950*
1.o20 4.311 11,181
- 1 E
7 Net Electrical Gen., MWh
-4,30 *
-1.920
-4.311
-11.181
- 8 Station Use, Percent 0
0 0
0 9
Accum. Core Avg. Exposure, MWD / Ton 1 0
0 0
0 10 CTEG This V nth 100 BTU 0
0 0
0 11 SGTEG This Month,106 BTU 12 13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use, Hours-Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 3
16 Turbine Avail. Factor, Percent 0
0 100 33.3 D
17 Generator Avail. Factor. Percent n
0 100 11.1 g
C 18 Turbocen. Avail. Factor. Percent 0
0 100 33.3 19 Reactor Avail. Factor. Percent a
n 100 11.1 0
20 Unit Avail. Factor. Percent O
O O
O 21 Turbine Startuos 0
0 0
0 22 Reactor Cold Startues 0
0 0
0 71 g
24 Gross Heat Rate, Btu /kWh 0
0 0
0 25 Net Heat Rate, Blu/kWh 0
0 0
0 3
2S U
27 g
28 Throttle Pressure, psig 0
0 0
0 29 Throttle Temperature, *F o
0 0
0
- 8 30 Exhaust Pressure, InHg Abs.
0 0
0 0
E 31 Intake Water Tcmo., *F 0
0 0
0 32 13 Main Feedwater, M lb/hr E
34 35 36 37 Full Power Capacity. EFPD (3) 4 4
/,
38 Accum. Cycle Full Power Days, EFPD 6
4 4
j 39 Oil Fired for Generation, Gallons 8 22 2
40 Oil Heatino Value. 8tu/ Gal.
139.500 e
41 Diete1 Generation. MWh 33.6 4?
Max. Hour Net Gen.
Max. Day Net Gen.
Load MWh Time Date MWh Da te Factor. %
2 43 0
0 0
O Remarks: A For 8FNP this value is MWD /STU and for SQNP and WBNP this value is MWD /MTU.
5 2(t) indicates Thermal Energy.
j (3)
Information furnished by Rea ct or An alysis Group, Chattanooga.
(4) Administrative hold.
- Revision Date Submitted /O -[7 Date Revised
')_
1, Pia'nt Superintencent
TV A M82A (CN481)
NllCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plant Yearly Period Hours 8760 mm Fiscel Year 39 86 ltem l
No.
Unit No.
Unit-1 Unit-2 Unit-3 Plant 1
Averace Hourly Gross Load, kw 0
0 0
0 g
2 Maximum Hour Net Generation. MWh 0
0 0
0 8
3 Core Thermal Eneroy Gen. GWD (t)2 0
0 0
0 4
Steam Gen. Thermal Energy Cen., GWO (t)2 8
5 Gross Electrical Gen., MWh 0
0 0
0 j
6 Station Use, MWh 47,473*
53,105 47,231 147,809*
E 7
Net Electrical Gen., MWh
-47,473*
-53.105
-47.231
.147 809*
5 8
Station Use, Percent 0
0 0
0 2
9 Accum. Core Avg. Exposure MWD / Ton 1 0
0 0
0 10 CTEG This Month.106 BTU 0
0 0
0 11 SGTEG This Month,106 BTU 1?
13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use, Hours. Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 y
16 Turbine Avail. Factor, Percent 0
0 100 33.3 17 Generator Avail. Fcctor. Percent 0
0 100 33.3 4
0 18 Turbooen Avail. Factor. Percent 0
0 100 33.3 19 Resetor Avail. F3ctor. Percent 0
0 100 33.3 2
20 Unit Avail. Factor. Percent 0
0 0
0 21 Turbine Startuos 0
0 0
0 22 Reactor Cold Startuns 0
0 0
0 23 3
24 Gross Heat Rate, Btu /kWh 0
0 0
0 y
25 Net Heat Rate, Stu/kWh 0
0 0
0 E
26 L
77 g
28 throttle Pressure, psso 0
0 0
0 29 Throttle Temperature, "F 0
0 0
0 d,
30 Exhaust Pressure, inHg Abs.
0 0
0 0
E 31 Intake Water Temp., *F 0
0 0
0 H
32 33 Main Feedwater, M lb/hr 0
0 0
0 y
34 o
c _3_5 36 37 Full Power Capacity, E FPD (3)
(4)
(4) 375(4)
_ 38 Accum. Cycle Full Power Days. EFPD (3)
(4)
(4) 70 (4)
N 39 Oil Fired for Generation, Gallons 67,928_
r 5
40 Oil Heatina Value. Btu / Gal.
139.224 41 Qigsatt Generation. MWh 478.8 o
Max Hour Net Gen.
Max. Day Net Gen.
Load
~
MWh Time Date MWh Date Factor, %
l 2
43 0
0 0
R ema rk s: A For 8FNP this value is MWD /STU and for SONP and WBNP this value is PkWD/MTU.
j g
2(t) indicates Thermal Energy.
l j
(3)
Information furnished by Reactor Analysis Group, Chattanocaa (4) Administrat ive hold.
J
/
)/
oate Sutm.ited oate Revised M '+
-4
.