Text
(
o OPERATING DATA REPORT DOCKET NO.
50-259 DATE JANUARY 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE 2.
Reporting period: JANUARY, 1987
- 3. Licensed Thermal Power (MWt): 3293 4
Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065 6.
Maximum Dependable Capacity (Gross MWe). 1G98.4 7.
Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours in Reporting Period 744.0 744 109664
^
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130 018. Net Electric Generation (MWh)
-5559.0
-5559 53706061
- 19. Unit Service Factor 0.0 0.0 53.13
- 20. Unit Availability Factor 0.0 0.0 53.13
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 40.98
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 45.98
- 23. Unit Forced Outage Rate 100.0 100.0 35.94 24 Shutdowns Scheduled Over Next 6 Month (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
t l
CRevision 8808290330 880815 9
PDR ADOCK 05000259 R
PNU g
r
.m+r
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
~50-259 Unit One DATE 02-01-87 COMPLETED BY K.L. Creamer TELEPMONE (205)729-2960 MONTH January 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-4 17
-8 2
-4 18
-8 3
-8 19
-7 4
-8 20
-8 5
-7 21
-8 6
-8 22
-8 7
-7 23
-7 8
-7 24
-8 9
-9 25
-8 10
-7 26
-8 11
-7 27
-7 12
-8 28
-8 13
-7 29
-9 14
-8 30
-7 15
-8 31
-8 r
16
-8 INSTRUCM ONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
- Complete Revision (9/77)
.e4 nara tor *+su NUCLEAR PLANT OPERATING STATISTICS BROWNS FERRY NUCLEAR Plant Period Hours Month January 19_87 Itern No.
Unit No.
tr_ j t t_ 9 gt_ q p 1., n e 1
Averace Hourly Gross Load. kW 0
0 0
0 2
Maximum Hour Net Generatica MWh 0
0 0
0 3
Core Thermal Energy Gen. GWDit)2 0
0 0
0 4
Steam Gen. The'rmal Energy Gen.,'GWO (t)2 8
5 Gross Electrical Gen., MWh 0
0 0
0 i
6 Station Use, MWh 5,559*
1,470 3,578 10,602*
h 7
Net Electrical Gen. MWh
.-5,559*
-l,470
-3,578
-10,60Z*
8 Station Use, Percent 0
0 0
0 9
Accum. Core Avg. Exposure. MWD / Ton 1 0
0 0
0 10 CTEG This Month.106 BTU 0
0 0
0 11 SGTEG This Month,1068TU 12 13 Hours Reactor Was Critical 0
0 0
0 14 Unit Use, Hours. Min.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0 16 Turbine Avail. Factor, Percent 0
0 100 33.3 17 Generator Avail. Factor. Percent 0
0 100 33.3 e
18 Turbooen. Avail. Factor. Percent 0
0 100 33.3 10 Reactor Avail. F3ctor. Percent 0
0
'100 33.3 L'i.
20 Unit Avsil. Factor. Percent 0
0 0
0
_21_
Turbine Startuos 0
0 0
0 22 Reactor Cold Startuos 0
0 0
0 M
g 24 Gross Heat Rate. Blu/kWh 0
0 0
0 25 Net Heat Rate,8tu/kWh 0
0 0
0
.E 26 C
27 y
28 Throttle Pressure, psig 0
0 0
0 29 Throttle Temperature, *F 0
0 0
0 j
30 Exhaust Pressure, inHo Abs.
0 0
0 0
g 31 Intake Water Temo., *F 0
0 0
0 32 33 Main Feedwater, M lb/hr 34 35 36 37 Full Power Capacity, EFPD (3) 4 4
4 38 Accum. Cycle Full Power Days, EFPD 4
4 4
j 39 Oil Fired for Generation, Gallons 5L6 2
40 Oil Heatino Value. Btu / Gal.
139,000 i
41 Dey.! Generation MWh 21.0 0
Max. Hour Net Gen.
Max. Day Net Gen.
Load
~~
MWh Time Date MWh Date Factor, %
43 0
0 0
IFor 8FNP this value is MWD /STU and for SONP and W8(IP this value is MWD /MTU.
O Remarks:
8 2(t) indicates Thermal Energy.
3 (3) Information furnished by Reactor Analysis Group. Chattanooga.
(4) Administrative hold.
- Revision
)j Date Submitted _
Date Revised
.>tf' t. -
_#2 v@
28
""IS"#*"" #
,