Revised Monthly Operating Repts for Jan 1987 for Browns Ferry Nuclear Plant
ML20151Z432
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/31/1987
From: Creamer K, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290330
Download: ML20151Z432 (3)


Text

(

o OPERATING DATA REPORT DOCKET NO.

50-259 DATE JANUARY 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.

Unit Name: BROWNS FERRY UNIT ONE 2.

Reporting period: JANUARY, 1987

3. Licensed Thermal Power (MWt): 3293 4

Nameplate Rating (Gross MWe): 1152 5.

Design Electric Rating (Net MWe): 1065 6.

Maximum Dependable Capacity (Gross MWe). 1G98.4 7.

Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A

9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours in Reporting Period 744.0 744 109664

^

12. Hours Reactor Was Critical 0.0 0

59521

13. Reactor Reserve Shutdown Hours 0.0 0

6997 14 Hours Generator On Line 0.0 0

58267

15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

168066787

17. Gross Electric Generation (MWh) 0.0 0

55398130 018. Net Electric Generation (MWh)

-5559.0

-5559 53706061

19. Unit Service Factor 0.0 0.0 53.13
20. Unit Availability Factor 0.0 0.0 53.13
21. Unit Capacity Factor (MDC Net) 0.0 0.0 40.98
22. Unit Capacity Factor (DER Net) 0.0 0.0 45.98
23. Unit Forced Outage Rate 100.0 100.0 35.94 24 Shutdowns Scheduled Over Next 6 Month (Type. Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:

t l

CRevision 8808290330 880815 9

PDR ADOCK 05000259 R

PNU g

r

.m+r

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

~50-259 Unit One DATE 02-01-87 COMPLETED BY K.L. Creamer TELEPMONE (205)729-2960 MONTH January 1987*

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-4 17

-8 2

-4 18

-8 3

-8 19

-7 4

-8 20

-8 5

-7 21

-8 6

-8 22

-8 7

-7 23

-7 8

-7 24

-8 9

-9 25

-8 10

-7 26

-8 11

-7 27

-7 12

-8 28

-8 13

-7 29

-9 14

-8 30

-7 15

-8 31

-8 r

16

-8 INSTRUCM ONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

  • Complete Revision (9/77)

.e4 nara tor *+su NUCLEAR PLANT OPERATING STATISTICS BROWNS FERRY NUCLEAR Plant Period Hours Month January 19_87 Itern No.

Unit No.

tr_ j t t_ 9 gt_ q p 1., n e 1

Averace Hourly Gross Load. kW 0

0 0

0 2

Maximum Hour Net Generatica MWh 0

0 0

0 3

Core Thermal Energy Gen. GWDit)2 0

0 0

0 4

Steam Gen. The'rmal Energy Gen.,'GWO (t)2 8

5 Gross Electrical Gen., MWh 0

0 0

0 i

6 Station Use, MWh 5,559*

1,470 3,578 10,602*

h 7

Net Electrical Gen. MWh

.-5,559*

-l,470

-3,578

-10,60Z*

8 Station Use, Percent 0

0 0

0 9

Accum. Core Avg. Exposure. MWD / Ton 1 0

0 0

0 10 CTEG This Month.106 BTU 0

0 0

0 11 SGTEG This Month,1068TU 12 13 Hours Reactor Was Critical 0

0 0

0 14 Unit Use, Hours. Min.

0 0

0 0

15 Capacity Factor, Percent 0

0 0

0 16 Turbine Avail. Factor, Percent 0

0 100 33.3 17 Generator Avail. Factor. Percent 0

0 100 33.3 e

18 Turbooen. Avail. Factor. Percent 0

0 100 33.3 10 Reactor Avail. F3ctor. Percent 0

0

'100 33.3 L'i.

20 Unit Avsil. Factor. Percent 0

0 0

0

_21_

Turbine Startuos 0

0 0

0 22 Reactor Cold Startuos 0

0 0

0 M

g 24 Gross Heat Rate. Blu/kWh 0

0 0

0 25 Net Heat Rate,8tu/kWh 0

0 0

0

.E 26 C

27 y

28 Throttle Pressure, psig 0

0 0

0 29 Throttle Temperature, *F 0

0 0

0 j

30 Exhaust Pressure, inHo Abs.

0 0

0 0

g 31 Intake Water Temo., *F 0

0 0

0 32 33 Main Feedwater, M lb/hr 34 35 36 37 Full Power Capacity, EFPD (3) 4 4

4 38 Accum. Cycle Full Power Days, EFPD 4

4 4

j 39 Oil Fired for Generation, Gallons 5L6 2

40 Oil Heatino Value. Btu / Gal.

139,000 i

41 Dey.! Generation MWh 21.0 0

Max. Hour Net Gen.

Max. Day Net Gen.

Load

~~

MWh Time Date MWh Date Factor, %

43 0

0 0

IFor 8FNP this value is MWD /STU and for SONP and W8(IP this value is MWD /MTU.

O Remarks:

8 2(t) indicates Thermal Energy.

3 (3) Information furnished by Reactor Analysis Group. Chattanooga.

(4) Administrative hold.

  • Revision