IUA Tennessee Valley Authority, Post Office Box 2000, Decatur. Alabama 35609 March 12, 1999 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - FEBRUARY 1999 MONTHLY OPERATING REPORT The enclosure provides the February 1999 Monthly Operating Report as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this matter, please call me at (256) 729-2636.
Sp icere '
l e
i
'ney Manager Licens g
and ndustry Aff irs l
Enclo re na I
cc:
See h
)
9903230287 990228 PDR ADOCK 05000259 R
PDR a l
I l
U.S. Nuclear Regulatory Commission Page 2 i
March 12, 1999 Enclo:iure cc (Enclosure):
Mr.
P. E.
Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.
Suite 23T85 i
Atlanta, Georgia 30303 Mr. Cecil O.
Thomas, Director Project Directorate II-4 Division of Reactor Projects I-II Office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.
20555 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager 1
Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant l
10833 Shaw Road i
Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission i
Region II 61 Forsyth Street, S.W.
Suite 23T85 Atlanta, Georgia 30303 i
L Ms. Barbara Lewis McGraw-Hill Companies 1200 G Street, N.W.
Suite 1100 Washington, D.C.
20005-3802 1
f
1.
l i
ENCLOSURE 1
I i
l l
TENNESSEE VALLEY AUTHORI*Y i
BROWNS FERRY NUCLEAR PLANT (BFN) l MONTHLY OPERATING REPORT
?
l FEBRUARY 1999 i
UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 l
UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 l
UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68 t
r OPERATIONAL
SUMMARY
FEBRUARY 1999 I
BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns.
Unit 1 has been on administrative hold since June 1, 1985.
As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe.
Accordingly, TVA does not consider reporting cumulative hours for the period beginning June 1, 1985, when calculating the operating status variables.
BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of February, Unit 2 generated 737,000 megawatt hours gross electrical power and operated at a net capacity factor of 100.5 percent maximum dependable capacity (MDC).
As of February 28, 1999, Unit 2 has operated continuously for i
149 days.
BROWNS FERRY NUCLEAR PLANT UNIT 3 For the month of February, Unit 3 generated 779,270 megawatt hours gross electrical power with a net capacity factor of 101.5 percent (MDC).
As of February 28, 1999, Unit 3 has operated continuously for 136 days.
i E-1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 UNIT NO.
ONE DATE: Mar. 5, 1999 l
COMPLETED BY:
J. E. Wallace TELEPHONE 256-729-7874 MONTH FEBRUARY 1939 AVYF.JGE DAILY POWER LEVEL AVERAGE DAILY POWER-LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1.
0 17.
O
~2.
0 18.
0 3.
0-19.
0 4.
0 20.
0 5.
0 21.
0 6.
0 22.
0 7.
0 23.
0 8.
0 24.
0 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12 0
28.
0
' 13.
0 14.
0 15.
0 16.
0 E-2
. _-- -.--~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-260 UNIT NO.
TWO DATE: Mar. 5, 1999 COMPLETED BY:
J. E. Wallace TELEPHONE 256-729-7874 i
MONTH FEBRUARY 1999 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1.
1091 17.
1058 1
i 2.
1090 18.
1054 3.
1094 19.
1062 4.
1083 20.
1039 5.
1093 21.
1065 6.
1090 22, 1048 7.
1091 23.
1029 8.
1080 24.
1088 9.
1083 25.
1090 10.
1070 26.
1020 11.
1084 27.
1055 12 1083 28.
1050 13.
1071 14.
1044 15.
1077 16.
1083 E-3
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-296 UNIT NO.
THREE DATE:
Mar. 5, 1999 COMPLETED BY:
J. E. Wallace TELEPHONE 256-729-7874 MONTH FEBRUARY 1999 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1.
1145 17.
1145 2.
1147 18.
1152 3.
1144 19.
1147 4.
1149 20.
1139 5.
1147 21.
1152 6.
949 22.
1139 7.
1145 23.
1141 8.
1136 24.
1139 9.
1135 25.
1140 10.
1134 26.
1136 11.
.1140 27.
1140 12 1131 28.
1140 13.
1125 14.
1127 15.
1150 16.
1148 t
i E-4 l-I
.~
~. -
OPERATING DATA REPORT Docket No.
50-259 Date:
Mar. 5.1999 Completed By:
J. E. Walla _ge Telephone:
(2561-729-7874 1.
Unit Name:
_BFN Unit 1 2.
Reporting Period:
February 1999 3.
Licensed Thermal Power (MWt):
3293 4.
Nameplate Rating (Gross MWe):
1152 5.
Design Electrical Rating (Net MWe):
1065 6.
Maximum Dependable Capacity (Gross MWe):
0
- 7.
Maximum Dependable Capacity (Net MWe):
0 8.
If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 9.
Power Level To Which Restricted, If any (net MWe): 0 10.
Reasons for Restrictions, If any: Administrative Hold This Month Yr-To-Date Cumulative
- 11.
Hours in Reporting Period 0
0 95743 12.
Number of Hours Reactor was Critical 0
0 59521 13.
Reactor Reserve Shutdown Hours 0
0 6997 14.
Hours Generator On-Line 0
0 58267 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWh) 0 0
168066787 17.
Gross Electric Energy Generated (MWh) 0 0
55398130 18.
Net Electrical Energy Generated (MWh) 0 0
53796427 19.
Unit Service Factor 0
0 60.9 20.
Unit Availability Factor 0
0 60.9 21.
Unit Capacity Factor (Using MDC Net) 0 0
52.8 22.
Unit Capacity Factor (Using DER Net) 0 0
52.8 23.
Unit Forced Outage Rate 0
0 25.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofEach): N/A l
25.
If Shutdown at End of Repon Period, Estimate Date of Startup: To Be Determined
- Excludes hours under A 'ministrative Hold (June 1,1985 tc present)
E-5 l
OPERATING DATA REPORT i
j Docket No.
50-260 l
Date:
Mar. 5.1999 L
Completed By:
J. E. Wallace l
Telephone:
(256)-729-7874 l
l 1.
Unit Name:
BFN Unit 2 2.
Reporting Period:
February 1999 3.
Licensed Thermal Power (MWt):
3293 4.
Nameplate Rating (Gross MWe):
1152 l
5.
Design Electrical Rating (Net MWe):
1065 6.
Maximum Dependable Capacity (Gross MWe):
1998.4 7.
Maximum Dependable Capacity (Net MWe):
1065 8.
If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 9.
Power Level To Which Restricted, If any (net MWe): N/A 10.
Reasons for Restrictions, If any: N/A This Month Yr-To-Date Cumulative
- 11.
Hours in Reporting Period 672.0 1416.0 158551 i
12.
Number of Hours Reactor was Critical 672.0 1416.0 116958 13.
Reactor Reserve Shutdown Hours 0.0 0.0 14200 14.
Hours Generator On-Line 672.0 1416 114559 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWh) 2199002.0 4646251 343222596 17.
Gross Electric Energy Generated (MWh) 737000.0 1560180 114083138 18.
Net Electrical Energy Generated (MWh)
_ 719168.0 1524042 111031171 19 Unit Service Factor 100.0 100.0 72.3 20.
Unit Availability Factor 100.0 100.0 72.3 21.
Unit Capacity Factor (Using MDC Net) 100.5 101.1 65.8 22.
Unit Capacity Factor (Using DER Net) 100.5 101.1 65.8 23.
Unit Forced Outage Rate 0.0 0.0 13.0 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 2, Cycle 10 refueling outage is scheduled to begin on April 11,1999, for a duration of 27 days.
25.
If Shutdown at End of Report Period, Estimate Date I
of Startup: N/A
- Excludes hours under Administrative Hold (June 1,1985 to May 24,1991)
E-6
L-l OPERATING DATA REPORT Docket No.
50-296 Date:
Mar. 5.1999 Condeted By:
J. E. Wallace i
Tehaone:
(256)-729-7874 1.
Unit Name:
BFN Unit 3 2.
Reporting Period:
February 1999 3.
Licensed Thermal Power (MWt):
3458 4.
Nameplate Rating (Gross MWe):
1190 l
S.
' Design Electrical Rating (Net MWe):
1120
)
6.
Maximum Dependable Capacity (Gross MWe):
1155 j
7.
Maximum Dependable Capacity (Net MWe):
1118 i
8.
If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 9.
Power Level To Which Restricted-. If any (net MWe): N/A 10.
Reasons for Restrictions, If any: N/A This Month Yr-To-Date Cumulative
- 11.
Hours in Reporting Period 672.0 1416.0 101773 12.
Number of Hours Reactor was Critical 672.0 1416.0 72397 13.
Reactor Reserve Shutdown Hours 0.0 0.0 7339 14.
Hours Generator On-Line 672.0 1416.0 71001 j
15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWh) 2307682.0 4878046.0 216790713 17.
Gross Electric Energy Generated (MWh) 779270.0 1646080 72501350 I 8.
Net Electrical Energy Generated (MWh) 762237.0 1610828 69702303 19.
Unit Service Factor 100.0 100.0 69.8 20.
Unit Availability Factor 100.0 100.0 69.8 21.
Unit Capacity Factor (Using MDC Net) 101.5 101.8 64.6 22.'-
Unit Capacity Factor (Using DER Net) 101.3 101.6 64.6 23.
Unit Forced Outage Rate 0.0 0.0 14.8 i
24.
- Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofEach): N/A 25.
If Shutdown at End of Report Period, Estimate Date of Startup:
N/A
- Excludes hours under Administrative Hold i
(June 1,1985 to November 19,1995)
E-7
4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 1999 DOCKET NO:
50-259 UNIT NAME:
BFN-1 DATE:
Matth 5,1999 COMPLETED BY: J. E. Wallace TELEPHONE:
(250) 729-7874 No.
[Date';!
Type {.
Duration, i. Reason} LMethod ofl LLicenseej System; : Coin'ponentj Canse and Corrective Action ~to Preventi
~
(Hours)j Shsttingj; Evenit RAport Code"
. Code *!
[Runrrencel Down:L_
No. c
-React $6 1
06/01/85 S
672 F
4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.
' F: Forced 2 Reason:
- Method
- Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1922)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explein)
H-Other (Explain)
E-8
=
.r UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 1999 DOCKET NO:
50-260 UNIT NAME:
BFN DATE:
March 5,1999 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874 Ney c Date, Typ?
lDuratjeni (Reason
- t (Method of[ Licenseej _ _.. [Systenti lCounponent) ;Cause and Corrective l Action;to Preventj
'(Hours)-[
Shuttingj Eysnt Reports ; Code'?
. Code *i iRecurrencel
- Downsf
' nom
~
- 4 geggf,$
N/A
' F: Forced 2 Reason:
' Method
- Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation ofExisting E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
E-9
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 1999 DOCKET NO:
50-296 UNIT NAME:
BFN-3 DATE:
March 5,1999 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874 LNo.
c DateE Type'y.; Duration:
Reason Method ori Licensee:;
Systent! ;Consponent!
Canse and Corrective: Action ta Prevent !
2
'(Hours)}
Sh%tting[
Event Report; Code" Code *[
iResurrenceI
- Downi.
No;::
- Reacted
' M;
s
t N/A
' F: Forced Reason:
- Method
- Instructions for Preparation of 2
S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Re. fueling 3-Automatic Scram (NUREG - 1022)
D-Reguiatciy Pestriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
E-10 i
.