OPERATING DATA REPORT
~
DOCKET NO.
50-259 DATE MARCH 88 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE
- 2. Reporting period: MARCH, 1988
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWu): 1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 744.0 2184 119864
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Generator On Lino 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 10. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-4930.0
-10011 53671462
- 19. Unit Service Factor 0.0 0.0 48.61
- 20. Unit Availability Factor 0.0 0.0 48.61
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 42.04
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 42.04
- 23. Unit Forced Outage Rate 100.0 100.0 42,40
- 24. Shutdowns Scheduled Over Next 6 Month (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period.
Estimated Date Of Startup:
CRov * ~ %n f
"ff829 Esc?828Q,
AVERAGE DAILY UNIT POWER LEVHL DOCKET No.
50-259 Unit One DATE 04-01-88 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH March 1988*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(NWe-Met) 1
-6 17
-7 2
-7 18
-6 3
-5 19
-8 4
-6 20
-6 5
-7 21
-7 6
-6 22
-7 7
-7 23
-7 8
-7 24
-7 9
-7 25
-6 10
-7 26
-7 11
-7 27
-2 12
-7 28
-7 13
-7 29
-7 14
-7 30
-6 15
-7 31
-8 r
16
-7 INSTRUCTIONS on this format. List the averase daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole messwatt.
- Complete Revision (9/??)
t v A n s A t o'*+8 u NUCLEAR FLANT OPERATING STATISTICS Pcgo 26 Browns Ferry Nuclear Plant Pefiod Hours 744 Month March
_19 L ltem No Unit No.
gtn4e i g,n4, y gg 4 9
_q og,n, 1
Averace Hourly Gross Load, kW O
O O
O 2
Maximum Hour Net Generation. MWh 0
0 0
0 3
Core Thermal Eneroy Gen. GWO (t12 0
0 0
0 4
Steam Gen Thermal Energy Cen, GWO (t)2 j
5 Gross Electrical Gen., MWh 0
0 0
.O z
a Stat 6on Ute. MWh 4930
- 1783 1539
.g o
- h 7
Net Electrical Gen., MWh 930 *
-1783
___ -15 39
-o4)2
- h 8
Station Use, Percent
__O O
O O
9 Accum. Core Avg. Exposure, MWO/ Ton!
_O O
O O
10 CTEG This Month,1008TU O
O O
O 11 SGTEG Tais Month,106 BTU l'
13 Hours Reactor Was Critical O
O O
O 14 Unit Use, Hours Man.
0 0
0 0
15 Capacity Factor, Percent 0
0 0
0
]
16 Turbine Avail Factor. Percent 0
0 0
0 17 Generator Avail Factor. Percent 0
0 0
0 C
18 Tur bons.n A vail Factor. Percent 0
0 0
0 19 Aeactor Avail, Factor. Percent 0
0 0
0 20 unit Ava,t ractor.p-tent 0
0 0
0 21 Turbine startuos 0
0 0
0 22 nueter coia staiturn 0
0 0
0 n
p 24 Gross Heat Aale, BtuAWh 0
0 0
0 g
25 Net Heat RJte, GluaWh 0
0 0
0 1
26
,7 g
28 Throttie Pressure, ps.g 0
0 0
0 t
29 Throttle Temperature, ' F 0
0 0
0 4
30 En haust Pressure, InHg Abs.
0 0
0 0
E 31 Intake Water Temo., *F 0
0 0
0 5
32 33 Main Feedw.ater, M lb/hr i
34
[
35 36 37 Full Power Capacity, E FPO
_ (4)
(4)
(4) 38 Accum Cycle Full Power Days. EFPO (4)
(4)
(4)
N 39 Oil Fired for Generation Gallons 5,920 5
40 0.1 Heation value Btu! Gat.
139,900 JLAnLfacaeration MWh 79.8 4 _'
Ma n. Hour Net L.en.
Man, Day Net Gen-Load MWh Time Date MWh Date Factor, *4 2
43 O
I O
O 3
R ema r k s: A For GF NP this value is MWO/5T U and f or SQNP and WilNP this value is MWOiM T U.
j 2(t) indicates T herrtial Energy.
9 1 in f nr rMr i on furniMheCLby Rrsar*ne AnA l_ yati n Grnm. cha r r a nmma d 1AminierrArivo hnid_
O A
.Il
/) //
. I
/1/ /
h h
- Revision Date Sut:mitted DJte A* vised
/
r/
m,,,. or.......--..m L._
_