Forwards Insp Rept 50-285/86-02 on 860101-31 & Notice of Violation
ML20153D580
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/18/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20153D584 List:
References
IEB-79-01B, IEB-79-1B, NUDOCS 8602240193
Download: ML20153D580 (2)


See also: IR 05000285/1986002

Text

, . ,

I

FEB 18 IW6 l

l

1

In Reply' Refer To:

Docket: 50-285/86-02

Omaha Public Power District

ATTN: .R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection cor. ducted by P. H. Harrell of this office during

the period January 1-31, 1986, of activities authorized by NRC Operating

License DPR-40 for Fort Calhoun Station, and to the discussion of our findings

with Mr. W. G. Gates at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

maintenance, surveillance, plant tours, safety-related system walkdowns,

followup on IE Bulletin 79-01B, followup on a regional -request for review of

uranium hexafluoride cylinder storage, followup on a 10 CFR Part 21 report on

Limitorque valves, followup on previously identified items, cold weather prepar-

ations, and plant startup from refueling. Within these areas, the inspection

consisted of selective examination of procedures and representative records.

interviews with personnel, and observations by the inspector. -The findings-are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to this-

violation, in writing, in accordance with the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Your

response should be based on the specifics contained in the Notice of Violation

enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

~~

8602240193 860218

PDR ADOCM 05000205

G PDR

,

RIV:SRIh RPB/Bh RPB

PHarrell DMHu nicutt JEGaglia o

ry /(,{/86 y /\ /86 t/,f/8)

I sy

--

'

s

o .'

>

~

Omaha Public Power. District -2-

~

Should you have any questions concerning this inspection, we will be pleased

.to discuss.them with you.

-

Sincerely,

Orldnnf S?cned Dy.

J. E. Gaa!!ardo

'

.J. E.LGagliardo, Chief

Reactor Projects Branch-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

'50-285/86-02

cc w/ enclosures:

W. G. Gates, Manager

.

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

.

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV: .

  • RPB * Resident Inspector R. D. Martin, RA
  • R&SPB. *Section Chief (RPB/B) *RSB
  • RIV File DRS&P *D. Weiss, LFMB (AR-2015)
  • MIS _ SYSTEM *RSTS Operator
  • w/766

l

.

i

l

l

l

L^ - , , ,