ML20153H571

From kanterella
Revision as of 19:40, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Description of Scope & Objectives for 1988 Plant Emergency Excercise Scheduled for 880719.Charlevoix County Sheriff Dept Will Participate in Excercise & Joint Public Info Ctr Will Not Be Activated
ML20153H571
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/05/1988
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805130067
Download: ML20153H571 (4)


Text

p. ;e ( . ,

i Consumers power

@rowsmsus AGENIEAAr5 PROSAE15 General oiticos: '1945 West Pernall Road, Jockton, Mt 49201 e ($17) 733.oS50 May 5, 19f8 Nuclear Regulatory Commission l Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

1988 BIG ROCK POINT EMERGENCY EXERCISE SCOPE AND OBJECTIVES (75-DAY LETTER)

Attached is a description of the scope and objectives for the 1988 Big Rock

! Point Plant emergency exercise. This utility-only exercise is scheduled for i July 19, 1988 and will involve participation by the Charlevoix County Sheriff Department. The Joint Public Information Center vill not be activated.

l Should you have questions on the exercise the contact individual within l

Consumers Power Company is l Anthony P Katarsky Senior Nuclear Emergency Planner 1945 West Parnall Road Jackson, MI 49201 Telephone (517) 788-2405 )

l )

y !. - - ~

Brian D Johnson I

! Staff Licensing Engineer l l

CC Administrator, Region III NRC NRC Resident Inspector - Big Rock Point Attachment I> s t

i OC0588-0003-NLO2 8805130067 PDR 880505 ADOCK 05000155 l F DCD

3 6

ATTACHMENT Consumers Pover Company Big Rock Point Plant Docket 50-155 1988 EMERGENCY EXERCISE SCOPE AND OBJECTIVES May 5, 1988 e

3 Psges [',

I OC0588-0003-N102 \

l

r 4

f i

1.0 SCOPE AND OBJECTIVES  :

l 1.1 SCOPE

, BREX 87 is designed to meet exercise requirements specified in 10CTR50 Appendix E,Section IV.F. It will postulate events which would require ,

activation of major portions of the site emergency plan and response by state and local government. The exercise will be utility only. The Charlevoix County Sheriff Department will also participate in security ,

aspects. The Joint Public Information Center vill not be activated.

1.2 OBJECTIVES I

The exercise will demonstrate:

1. Assessment and Classification
4. Recognition of emergency conditions  !

1

b. Timely classification of emergency conditions in accordence with emergency action levels
2. Communication
a. Initial notification within specified time constraints (state and l

local - 15 minutes NRC - 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) 1  !

b. Subsequent notification in accordance with procedure  !

l c. Notification and coordination with other organizations, as ,

i required (other utilities, contractors, fire or medical services) ,

i j

d. Provision of accurate and timely information to support news l release activity J
3. Radiological Assessment and Control
a. Calculation of dose projection based on sample results or monitor

] readings I

b. Performance of in-plant and offsite field surveye l
c. Collection and analysis of a post-accident primary coolant sample 1
d. Trending of radiclogical data
e. Formulation of appropriate protective action recommendations

) f. Contamination and exposure control J

l 4

OC0588-0003-KLO2

t'. * * .a

, i l

l .,

i I

l 4 Emergency Response Facilities

a. Ac: ' ration, staffing and operation at appropriate classifications l and within specified time constraints t
b. Adequacy of emergency equipment and supplies '
c. Adequacy of emergency communication systems
d. Access control
5. Emergency Management l
a. Command and control with transfer of responsibilities from Control Room to Technical Support Center to Emergency Operations -

Facility

b. Assembly and accountability within approximately 30 minutes
c. Coordination with State of Michigan emergency organisation -
d. Mitigation of operational and radiological conditions
e. Mobilization of emergency teams
6. Reentry and Recovery f 1
a. Assessment of damage and outline of reentry / recovery plans
b. Identification of constraints, requirements and organization to i implement the plan ,
7. Exercise Control I
a. Provision for maximum free play t
b. Accurate assesweent of player performance  :

1 i

l i

f i

i 1

F OC0588-0003-NLO2 P i l 1