Forwards Errata to Geotechnical Verification Work - Rept of Results, Submitted on 850823.Range of Permeability Measurements on Pages 3 & 10 Corrected to Conform W/Accurate Data on Table 2 & in App C
ML20154D501
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1986
From: Bailey J
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20154D505 List:
References
0053V, 53V, GN-819, NUDOCS 8603060123
Download: ML20154D501 (2)


Text

'

Georgi] Power Company Project M:ragemcnt Rout 2 2. Box 299A

  • Waynesboro Georgia 30830 Telephone 404 724-8114 434 554-9 % 1 Southern Company Services. Inc.

Post Office Box 2625 Berm:ngham A abama 35202 Telephone 205 870-6011 VOgtle Proiect J February 28, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Mr. B. J. Youngblood Log: GN-819 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 REF: Letter GN-695, Dated August 23, 1985 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 ERRATA TO GEOTECHNICAL VERIFICATION WORK - REPORT OF RESULTS

Dear Mr. Denton:

The above ref erenced letter transmitted our report "Geotechnical Verification Work - Report of Results". This report contained minor errors which have no bearing on the results, but should be corrected. The information should be revised as discussed below:

In Section 3.0, " Summary of Results", second paragraph, page 3, and in Section 5.2, " Laboratory Permeability Testing", second paragraph of the permeability measurements should read "8.49 x 10-b page 10,xthe to 5.01 range 10-9 cm/sec" in conformity with the data accurately reported on Table 2 and in Appendix C.

Table 1 Summary of Observation Wells. - A new table is submitted with this letter. The table is revised for clarity to show " elevations" instead of

" depth below ground surf ace" for the columns " Depth to Marl" and "open interval". There was also an error in the "open interval" for well 900, which has been corrected.

l Figures 1 and 3 have been revised for clarification. For example, the previous figures indicated open intervals in depth below reference point.

These are now expressed in reference to elevation to be consistent with other data references.

l f

esoaoso123Spo$$324 l PDR ADOCK PDR A I l l

\ l l

j j

t

,~* ,

i

' Director of Nuclear Reactor Regulation File: X7BC35 February 28, 1986 Log: GN-819 l Page 2 Should you have any questions, please' inquire.

Sincerely, l J. A. Bailey Project Licensing Manager

! JAB /cg Enclosure

, xc: R. E. Conway G. Bockhold, Jr.

, R. A. Thomas T. Johnson J. E. Joiner, Esquire D. C. Teper (w/o enclosure)

B. W.. Churchill, Esquire W. C. Raasey M. A. Miller (2) L. T. Gucwa

  • B. Jones (w/o enclosure)

Vogtle Project File

0053V i 1

I i

i l

J 1

l 1

I i

i l

i 4

9