ML20154G069

From kanterella
Revision as of 06:05, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Outline of Revised Licensed Operator Requalification Program & Planned Implementation Schedule,Per 880815 Request
ML20154G069
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/15/1988
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809200234
Download: ML20154G069 (2)


Text

_

1 t

e

  • 6 s,

Consumers

@rewrams niKMEAW5 PR06Rr55 Power oeneral offices: 1945 West Parnell Road, Jack son, Mt 49201 * (S17) 788 0550 September 15, 1988 Nuclear Regulatory Commission Document Control Deek Washington, DC 20555 l

4 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - j LICENSED OPERATOR REQUALIFICATION PROGRAM OUTLINE Nuclear Regulatory Commission letter dated August 15, 1988 requested that an outline of our revised requalification program and a planned implementation i

schedale be provided in order to allow Regien III to plan their future

{ examination workload. Consumers Power Company's response to this request is provided herein. l Big Rock Point intends to implement the next and all cueceeding requal cycles in the naw NRC requalification program format. The program includes l

Selecting tasks to be trained on in the requal pregram from weaknesses identified through evaluation of exams, training effectiveness feedback and program review by plant tanagement.

Developing a control room mock-up for use in Section "A" of written requal exams.

Developing an exam bank including;

a. 700 cpen reference written exam questions,
b. A minimum of 75 job performance measures for walk through portions af the annual operating test,
c. A minimum of 4 oral questions per job performance measure for the walk through exams.
d. 15 simulator scenarios which incorporate job performance measures for the simulator portion of annual operating test.

S c' 1"".ing of simulator training and evaluation sessions concurrent v;ui p. ant walk througha and written requal exams.

f' OC0988-0123-NLO2 & I \

t

.- Ndc10 r R2gulctory Commis2 ion 2 Big Rock Point Plant Licensed Operator Requal Program September 15, 1988 Providing the required information to the NRC for exam development and administering Big Rock Point Requal Program evaluation per NRC Examination Standard ES-601.

- Providing the required SRO's to the NRC for exam development.

Developing a S.mulation Facility per 10LFR55.45.b.l.1 for the purpose of the annual operati,g test by May 26, 1991.

Big Rock Point will review and revise the existing operator task lists to Ensure all operator tasks are correctly identified.

Ensure all requal tasks are identified.

Rate all tasks for importance to the safety of the public. I Match Big Rock Point safety importance with K/A Catalog.

Utilitt task analysis data to develop requal training sessions.

f Eig Rock Point will complete the current two year requal cycle in the fourth quarter af 1968. The next two year requal cycle begins in the first quarter of 1989. An annual operating test of all licensed personnel will be conducted in the fourth quarter of 1989 and an annual operating test and written requal examination will be conducted in the fourth quarter of 1990. The annual operating tests consist of a sinulator evaluation at the Dresden Simulator followed Sy a plant wa'.k through at Big Rock Point within a few days of the simulator evaluation. Specific dates have been contracted at the Dresden Simulator in the fourth quarter of each year for the exama. For 1989 the exams are scheduled for five sessions during the weeks of October 3, October

10. November 2. November 7 and November 14. For 1990 the seasions are scheduled during the weeks af October 2. October 9. October 16, October 23 and October 30. Annual operating tests and written requalification exams will be administered in accordance with the NFC axam standards.

$O  ? 4 0.

Lalp1 R Frisch Senior Licensing Analyst CC Administrator, Region III, NRC NRC Resident Inspector - Big Rock Point Plant 60Uright, Region III. NRC OC0988-0123-NLO2

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _