ML20154R825

From kanterella
Revision as of 06:35, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-213/88-08 on 880405-0516.No Violations Noted.Ack Receipt of 880418 & 0506 Ltrs Describing Corrective Actions for Violations Noted in Insp Repts 50-213/88-01 & 50-213/87-28,respectively
ML20154R825
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/27/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20154R829 List:
References
NUDOCS 8806080209
Download: ML20154R825 (2)


See also: IR 05000213/1988008

Text

p ..

"

4 .

Docket / License: 50-213/0PR-61

NAY 2 7 Iges

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06141-0270

'

Gentlemen:

Subject: Resident Inspection 50-213/88-08 (4/5/88 - 5/16/88)

This transmits the findings of the routine NRC inspection conducted by Mr.

J. T. Shediosky and Ms. A. A. Asars of the Haddam Neck Plant. These findings

have been discussed with Mr. D. B. Miller of your staff.

No violations were identified during this inspection and no reply to this letter

is required.

During this inspection, the inspectors performed close-out reviews of several

long-standing issues; including Natural Circulation Cooldown and Pressure Isolation

Valves. These reviews necessitated extensive searches of Nuclear Records and in-

terviews with station personnel. The inspectors found station personnel knowledge-

able and helpful during the course of these inspections. ,

Thank you for your April 18, 1988 letter, as requested by NRC Inspection Repcrt

50-213/88-01, which describes corrective actions taken for a violation identified

during surveillance testing. We have also received your response, dated May 6,

1988, to violations identified in Environmental Qualification as described in NRC

'

Inspection Report 50-213/87-28. These matters will be reviewed during future in-

spections. ,

Your cooperation with us is appreciated.

!

j Sincerely,

I

    1. [21:u1 S!Ened y;4  ;

' , Wd4L ~

)

h)//, Lee

Proje ts/L Bettenhausen,

Branch No.1 Chief l j

/ Division of Reactor Projects j

Enclosure: NRC Region I Report 50-213/88-08

i

0FFICIAL REMRD COPY DL50-213/88-08 - 0001.0.0

i 05/26/88

[ i

i

l

6806080209 880527

PDR ADOCK 05000213

DCD

3h

.O  !

-_ . . - . - - . . . . , . . . , . . . . . - , - - - - - , . . - _ , - , , . -

. _ _ _ _ _ _

_-

.

, ,

.

,

.

Connecticut Yankee Atomic Power Company 2

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

D. B. Miller, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

l

NRC Resident Inspector

! State of Connecticut

!

j bcc w/ encl:

l .<egion I Docket Room (with concurrences)

i

Aanagement Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Millstone

A. Wang, LPM, NRR

R. Bores, DRSS

0. Rothberg, NRR

l

R. Woods, NRR

H. Bailey, NRR

E. Branagan, NRR

E. Conner, DRP

1

1

RI:DRP @M RI:DRP 'R

Shediosky/rreo/mjd d Bettenhause

McCabef)

5 / 21 / 8 8 5/A?/88 5/ 88

0FFICIAL RECORD COPY DL50-213/88-08 - 0002.0.0

05/27/88

. .

..

. _ .