MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
, .
AVERAGE DAILY UNIT POWER LEVEL 50-250 DOCKET NO.
UNIT Turkey Point 3 DATE FEB i41983 COMPLETED By ~ P. Pace TELEPfl0NE (305) 552-3654' MONTH January, 1983 DAY AVER AGE DAILY POWER LEVEL~ DAY
- AVERAGE DAILY POWER LEVEL (MWe. Net) .(MWe. Net)
I 695 17 703 2 696 579 is "
696 ---
3 39 697 ---
4 20 699 5 21 417 699 700 6 22 702 7 23 703 8 7Q1 704 28 699 706 9 25 to 697 705 26 11 695 706 27 _
697 704 12 28 13 702 704 29 704 699 I4 30 703 695 33 33 16 704 6
INSTRUCTIONS On this format tw the aserage daily unit power lesel in MWe.Nei for each day in the reporting :n.inth. Compute to the nearest whi.te m:gawati.
19/771 FGO3150546 830214 o PDR ADOCK 05000250 pgg R
O OPERATING DATA REPORT DOCKET NO. 50-250 DATE FFR 1.f 1Q93 COMPLETED BY P. Pace TELEPHONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name: Turkey Point 3 Notes Unit 3 operated at
- 2. Reporting Period: January, 1983 essentially full power ex-
- 3. Licenwd Thennal Power (MWt): 2200 cept for the outage 1isted
- 4. Nameplate Rating (Gross MWe): 760 in the " Unit Shutdowns
- 5. Design Flectrical Rating (Net MWe): b "" * * "
680 report.
~ 6. Maximum Dependable Capacity (Gross MWe): -
- 7. Maximum Dependable Capacity (Net MWe): 646
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Wliich Restricted,If Any (Net MWe):
- 10. Reasons For Restoictions,If Any: ~-~~
P This Month Yr to.Date Cumulative II. Hours in Reporting Period 744 744 _
89,049.6
- 12. Number Of Hours Reactor Was Critical 713.2 /13.' b2,232.5
- 13. Reactor Reserve Shutdown Hours 0 0 844.4
- 14. Hours Generator on Line .
694_1 684.1 _60,189.2
- 15. Unit Reserve Shutdown Hours '
0 0 121.8
- 16. Gross Thermal Energy Generated (MWH) 1.506.295 1,506,2'95 122,924,40/
- 17. Gross Electrical Energy Generated (MWH) 500,580 , , ,
500,580 _
n ,104,o/u
- 18. Net Electrical Energy Generated (MWH) 476.796 476,/96 37,Ob4,34M j 19. Unit Service Factor 91.9 91.9 67.6 l 20. Unit Availability Factor 91.9 91 9 D#*#
- 21. Unit Capacity Factor (Using MDC Net) - 99.2 99.2 D4'4
- 22. Unit Capacity Factor (Using DER Net) 92.5 92.b ou.g
- 23. Unit Forced Outage Rate 8.1 0.1 u.'
l 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:
j 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior o commercial Operation): Forecast Achieved INITI.il CRITICA LITY INI flA L ELECTRICITY COMMERCIA L OPERATION l l l
(9/77)
-~
s DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point 3 DATE FEB i 419?'
COMPLETED BY F. Face REPORT MONTil January 1983 TELEPff0NE (305)552-3654
. 3 -
=
.2 e e,
2-=a
, .s ;:; Licensee c ". e" c . Cause & Corrective No. Date g 3g g ,gg5 Event u? S.3 Action to H $ '
$E j5g Report a <E 0 Prevent Recurrence 6
1 830118 F 59.9 A 2 HJ VALVEX The unit was removed from service to correct a vibration problem in steam lines to two moisture separator reheaters. Two steam supply valves were repaired and two valves were blanked off and the unit was re-turned to service.
I 2 3 4 F: Forced Reason: Me: hod: Exluti: G - Im:ructmns S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Dat.
B-Maintenance of Test 2 Manual Scram.- Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.
D-Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & License Examination F-Adnumst rative p ,
5 G-Operational Error (Explain) 4_ toan a souc.r..<> Exhibit I - Same Source
(')/77) Il-Other (Explain)
, , ]
. SUMt1ARY OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point'3 DATE FEB 14 i983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH _ JANUARY 1983 Unit 3 operated at' essentially full
- power except for an outage from'18-21
~
January. See the " Unit Shutdowns and Power Reduction" Report for details.
Major safety related maintenance activities s
included:
The annual battery discharge test was conducted.
A boric acid heat tracing circuit was adjusted.
A boric acid supply valve solenoid was replaced.
A charginq_ system pipe weld was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for addi- ,
tional information'.
t
.e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE FEB 141983 COMPLETED BY P. Pace TELEPJIONE (305) 552-3654 MONU1 January, 1983 .
DAY AVER ACE DAILY POWER LEVEL ~ DAY AVER AGE DAILY POWER LEVEL iMWe-Net) .IMWe-Net)
I 17 2 18 3 39 4 ---
20 S y, 6 22 7 23 8
9 25 10 26 II 33 gg ___
! 13 29 l ___
14 30 15 31 l
j 16 1
I INSTRUCTIONS On this forinai. hst the average daily unit power leylin MWe-Net for ea:h day in the reporting :nonth. Compute to j the nearest wh..fc t wgawart.
(9/77) i a
9
OPERATING DATA REPORT DOCKET NO. 50-251 DATE FFR 1 a eng COMPLETED IlY P. Face-TELEPHONE -( 305) 552-3654 OPERATING STATUS
- 1. Unit Name: Turkey Point 4 Notes Steam Generator Repair
- 2. Reporting Period: ._
Ja nuary,1983 Program in progress.
- 3. Licensed Thermal Power (MWr): 2200
- 4. Nameplate Rating (Gross MWe): 760
- 5. Design Electrical Rating (Net MWe): m
~ 6. Maximum Dependable Capacity (Gross MWe): 680
- 7. Maxinum Dependable Capacity (Net MWe). 646 *
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Rey :t. Give Raons:
- 9. Power Level To Which Restricted.lf Any (Net MWe): ----
- 10. Reasons For Restiictions. If Any: ----
This Month Yr to Date
] Cumulative
- 11. Hours In Reporting Period 744 744 82,777.
- 12. Number Of Hours Reactor Was Critical 0 0 59,o55.3
- 13. Reactor Reserve Shutdown Hours 0 0 166.6
- 14. Hours Generator On Line 0 0 b/,uso
- 15. Unit Reserve Shutdown Hours 0 0 31.2
- 16. Gross Thermal Energy Ce'nerated (MWH) 0 0 121,91ti,244
- 17. Gross Electrical Energy Generated (MWH) 0 , , ,
O gu, / g ,ag
- 18. Net Electrical Energy Generated (MWH) -1076 -10/b ao, e ac .a va 19 Unit Service Factor 0 0 69.9
- 20. Unit Availability Factor 0 0 /u.u
- 21. Unit Capacity Factor (Using MDC Net) U U jo.[
- 22. Unit Capacity Factor (Using DER Net) U v u,.u
- 23. Unit Forced Ourage Rate O O 3.9
- 24. Shutdowns Schedoled Over Next 6 Months (Type.Date.and Duration of Eacht:
I
- 25. If Shut Down At l'nd Of Report Period. Estimated Date of Startup: '
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICA LITY INITIA L ELECTRICITY Coll \1ERCIA L OPERATION l
(9/771
. -~
,.-. -- _ _ - _ . _ _ - - - , _ - - -s
,=
50-251 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKETNO.
UNITNAME Jurkey F6 int 4
COMPLETED 11y P. pace .
REPORTMONTH January, 1983 TELEPl!ONE TJ05) 552-mbt
,_ = =
Ibte
, .! E 3 $Yk Licensee ,~ g k% Cause & Corrective
.W .
S r-3= 4 .g g $ Event f h g? E-T , Action to y :ii $ j;5g . Report s ' mV jU Prevent Recurrence -
5 18 821009 S 744 H 4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41. .
g n
1 2 3 4 F: Forced Reason: Method: Exhibit G.Instruellons '
S: Sdieduled A.Etiuipment Failure (Explatn) 1. Manual . for Preparation of Data .
B. Maintenance of Test 24!anual Scram.
- Entry Sheets for Liecusee C. Refueling . 3.Automatie Scram. Event Report (LER) File (NUREG.
D.Regdatory Restriction 9-Other (Explain) 01611 E.Operatiir Training & License Examination F. Administrative 9, ,
S
, G. Operational Error (Explain) 4- . 4oao ruove.,. .d Exhibit i .Same Source (9/77) li Other(Explain) *
SUMMARY
OF OPERATING EXPERIENCE DOCKET No. 50-251 UNIT _ Turkey Point 4 .
DATE FEB 14tgrn COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT HONTH Janua'ry 1983 Unit 4 continued the Steam Generator Repair Program Other major safety relat'ed maintenance activities included:
The Annual Station Battery Discharge Test was conducted.
Two Boric Acid neat tracing circuits were adjusted. -
Auxiliary feedwater instrumentation was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
l Florida Power & Light Company commitments for NUREG-0737 I
implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
l l
l t
l t
AVERAGE DAILY UNIT POWEPe LEVEL DOCKETNO. 50-335 UNIT St. Lucie 1 DATE FEB 141933 COMPLETED BY P. Pace TELEPil0NE(305) 552-3654 MONTH January, 1983 .
DAY AVER AGE DAILY POWER LEVEL DAY
~ AVERAGE DAILYPOWER LEVEL tMWe Net) -(MWe-Neti I 832 37 84 2 ~
831 gg 829 833 3 19 789' 740 4 797 20 5 658 769 21 757
. 6 22 765 173 7 806 23 8 229 843' 24 387 9 25 M 837 10 844 26 838 ,,
786 11 ->
839 g2 28 840 843 13 042 29 843 34 30 846 843 15 843 31 16 845 l
l INSTRUCTIONS On this format.1.s' Ihe average daily unit power lesel in MWr-Net for each day in the reporting m.inth. Compute to the nearest who e impwaii.
(9/771 G.
OPERATING DATA REPORT DOCKET NO. 50-335 DATE era >---
COMPLETED BY V." PbBeN TELEPHONE (106) E;7-3654 OPERATING STATUS
- 1. Unit Name: St. Lucie Unit 1 Notes Unit 1 operated at es-
- 2. Reporting Period: January, 1983 senttally full power except #
- 3. Licensed Thermal Power (MWt): 2700 for a brief outage as de-
- 4. Nameplate Rating (Gross MWe): 890 scribed in the ' Unit Shutdown
- 5. Design Electrical Rating (Net MWe): 830 - and Power Reductions" report.
- 6. Maximum Dependable Capacity (Gross MWe): 862
- 7. Maximum Dependable Capacity (Net MWe): 81/
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe): ---------
- 10. Reawns For Restiictions. If Any: --~~~~----
This Month Yr to-Date Cumulatise
- 11. Hours In Reporting Period 744 744 53,592
- 12. Number Of Hours Reactor Was Critical I44 744 "* *
- 13. Reactor Reserve Shutdown Hours 0 0 205.3
- 14. Hours Generator On Line , 728.7 728./ 42,954
- 15. Unit Reserve Shutdown Hours 0 0 39.3
- 16. Gross Thermal Energy Ge'nerated (MWH) 1.H77.76S* 1.872.765 107,008,281
- 17. Gross Electrical Energy Generated (MWH) 613.390 . . ,
613,390 34,826,985
- 18. Net Electrical Energy Generated (MWH) 581,098 581,U98 32,845,289
- 19. Unit Service Factor 97.9 9/.9 80.2
- 20. Unit Availability Factor 9/.9 9/.9 6u.2
- 21. Unit Capacity Factor (Using MDC Net) 95.6 95.6 78.3
- 22. Unit Capacity Factor (Using DER Net) 94.1 94.1 /6.0
- 23. Unit Forced Outage Rate 2.1 2.1 4.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Refuelina. February 26, 1983, 2 months
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status tPrior io Commercial Operation): Foreca<t Achieved INITIA L CRI flCA LITY INI flA L ELECTRICITY CO%1\lERCI A L OPER ATION 6
- 7247 x 10 BTU used by St. Lucie Unit 2.
vnim
DOCKET NO. 50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS ,
UNIT NAME St. Lucie 1 DATE ttU 141981 REPORT MONTH January 1983 COMPLETED BY P Pace TELEPHONE (305)552-3654
= en 4 e.o 2 , - g
,, .2 _e : -3 .s x Licensee g3, c Cause & Corrective No. Date g 3g j ,g g 5 Event u? S4~$ Action to
j di g Prevent Recurrence c5 1 830104 F 0 A 5 HF ft0TORX Power was reduced to repair a circulating water pump motor.
2 830108 F 15.3 A 1 HJ TURBIN The unit was removed from service to repair a steam leak from an orifice in a drain line under the high pressure turbine.
\
I 2 3 4 F: Forced Reason: Method: Exhibit G - instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Admimstrative pg ,
5 G-Operational Error (Explain) c _ to a.2 4,rt,vc;r. .</ Exhibit 1 - Same Source (9/77) Il-Osher (Explain)
SUZIMARY OF OPERATING EXPERIENCE DOCKET NO. J -335 UNIT St. Lucie Unit'l DATE _
FEB 14 m COMPLETED BY P. Pace TELEPHONE (305) 552-3654 REPORT tiONTH JANUARY 1983 St. Lucie Unit I reduced power on banuary 4, to replace a circulating water pump motor and to clean condenser water boxes. The unit was removed from service for 15.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on January 8-9 to repair a steam leak from an orifice in a drain line under the high pressure turbine.
Other major safety related maintenance included:
.Two boric acid heat tracing circuits were repaired.
Inspections ahii requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional infonnation.
4 In accordance with the requirements of NUREG-0737 Item II.k.3.3, there were i no challenges to PORV or safety valves during the report month.
l l
l l
i l
t i e