AVERAGE DAILY UNIT POWER LEVEL 50-250 DOCKET NO.

UNIT Turkey Point 3 DATE FEB i41983 COMPLETED By ~ P. Pace TELEPfl0NE (305) 552-3654' MONTH January, 1983 DAY AVER AGE DAILY POWER LEVEL~ DAY

- AVERAGE DAILY POWER LEVEL (MWe. Net) .(MWe. Net)

I 695 17 703 2 696 579 is "

696 ---

3 39 697 ---

4 20 699 5 21 417 699 700 6 22 702 7 23 703 8 7Q1 704 28 699 706 9 25 to 697 705 26 11 695 706 27 _

697 704 12 28 13 702 704 29 704 699 I4 30 703 695 33 33 16 704 6

INSTRUCTIONS On this format tw the aserage daily unit power lesel in MWe.Nei for each day in the reporting :n.inth. Compute to the nearest whi.te m:gawati.

19/771 FGO3150546 830214 o PDR ADOCK 05000250 pgg R

O OPERATING DATA REPORT DOCKET NO. 50-250 DATE FFR 1.f 1Q93 COMPLETED BY P. Pace TELEPHONE (305) 552-3654 OPERATING STATUS

1. Unit Name: Turkey Point 3 Notes Unit 3 operated at
2. Reporting Period: January, 1983 essentially full power ex-
3. Licenwd Thennal Power (MWt): 2200 cept for the outage 1isted
4. Nameplate Rating (Gross MWe): 760 in the " Unit Shutdowns
5. Design Flectrical Rating (Net MWe): b "" * * "

680 report.

~ 6. Maximum Dependable Capacity (Gross MWe): -

7. Maximum Dependable Capacity (Net MWe): 646
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Wliich Restricted,If Any (Net MWe):
10. Reasons For Restoictions,If Any: ~-~~

P This Month Yr to.Date Cumulative II. Hours in Reporting Period 744 744 _

89,049.6

12. Number Of Hours Reactor Was Critical 713.2 /13.' b2,232.5
13. Reactor Reserve Shutdown Hours 0 0 844.4
14. Hours Generator on Line .

694_1 684.1 _60,189.2

15. Unit Reserve Shutdown Hours '

0 0 121.8

16. Gross Thermal Energy Generated (MWH) 1.506.295 1,506,2'95 122,924,40/
17. Gross Electrical Energy Generated (MWH) 500,580 , , ,

500,580 _

n ,104,o/u

18. Net Electrical Energy Generated (MWH) 476.796 476,/96 37,Ob4,34M j 19. Unit Service Factor 91.9 91.9 67.6 l 20. Unit Availability Factor 91.9 91 9 D#*#
21. Unit Capacity Factor (Using MDC Net) - 99.2 99.2 D4'4
22. Unit Capacity Factor (Using DER Net) 92.5 92.b ou.g
23. Unit Forced Outage Rate 8.1 0.1 u.'

l 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:

j 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units in Test Status (Prior o commercial Operation): Forecast Achieved INITI.il CRITICA LITY INI flA L ELECTRICITY COMMERCIA L OPERATION l l l

(9/77)

-~

s DOCKET NO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point 3 DATE FEB i 419?'

COMPLETED BY F. Face REPORT MONTil January 1983 TELEPff0NE (305)552-3654

. 3 -

=

.2 e e,

2-=a

, .s ;:; Licensee c ". e" c . Cause & Corrective No. Date g 3g g ,gg5 Event u? S.3 Action to H $ '

$E j5g Report a <E 0 Prevent Recurrence 6

1 830118 F 59.9 A 2 HJ VALVEX The unit was removed from service to correct a vibration problem in steam lines to two moisture separator reheaters. Two steam supply valves were repaired and two valves were blanked off and the unit was re-turned to service.

I 2 3 4 F: Forced Reason: Me: hod: Exluti: G - Im:ructmns S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Dat.

B-Maintenance of Test 2 Manual Scram.- Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & License Examination F-Adnumst rative p ,

5 G-Operational Error (Explain) 4_ toan a souc.r..<> Exhibit I - Same Source

(')/77) Il-Other (Explain)

, , ]

. SUMt1ARY OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point'3 DATE FEB 14 i983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH _ JANUARY 1983 Unit 3 operated at' essentially full

  • power except for an outage from'18-21

~

January. See the " Unit Shutdowns and Power Reduction" Report for details.

Major safety related maintenance activities s

included:

The annual battery discharge test was conducted.

A boric acid heat tracing circuit was adjusted.

A boric acid supply valve solenoid was replaced.

A charginq_ system pipe weld was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for addi- ,

tional information'.

t

.e

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE FEB 141983 COMPLETED BY P. Pace TELEPJIONE (305) 552-3654 MONU1 January, 1983 .

DAY AVER ACE DAILY POWER LEVEL ~ DAY AVER AGE DAILY POWER LEVEL iMWe-Net) .IMWe-Net)

I 17 2 18 3 39 4 ---

20 S y, 6 22 7 23 8

9 25 10 26 II 33 gg ___

! 13 29 l ___

14 30 15 31 l

j 16 1

I INSTRUCTIONS On this forinai. hst the average daily unit power leylin MWe-Net for ea:h day in the reporting :nonth. Compute to j the nearest wh..fc t wgawart.

(9/77) i a

9

OPERATING DATA REPORT DOCKET NO. 50-251 DATE FFR 1 a eng COMPLETED IlY P. Face-TELEPHONE -( 305) 552-3654 OPERATING STATUS

1. Unit Name: Turkey Point 4 Notes Steam Generator Repair
2. Reporting Period: ._

Ja nuary,1983 Program in progress.

3. Licensed Thermal Power (MWr): 2200
4. Nameplate Rating (Gross MWe): 760
5. Design Electrical Rating (Net MWe): m

~ 6. Maximum Dependable Capacity (Gross MWe): 680

7. Maxinum Dependable Capacity (Net MWe). 646 *
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Rey :t. Give Raons:
9. Power Level To Which Restricted.lf Any (Net MWe): ----
10. Reasons For Restiictions. If Any: ----

This Month Yr to Date

] Cumulative

11. Hours In Reporting Period 744 744 82,777.
12. Number Of Hours Reactor Was Critical 0 0 59,o55.3
13. Reactor Reserve Shutdown Hours 0 0 166.6
14. Hours Generator On Line 0 0 b/,uso
15. Unit Reserve Shutdown Hours 0 0 31.2
16. Gross Thermal Energy Ce'nerated (MWH) 0 0 121,91ti,244
17. Gross Electrical Energy Generated (MWH) 0 , , ,

O gu, / g ,ag

18. Net Electrical Energy Generated (MWH) -1076 -10/b ao, e ac .a va 19 Unit Service Factor 0 0 69.9
20. Unit Availability Factor 0 0 /u.u
21. Unit Capacity Factor (Using MDC Net) U U jo.[
22. Unit Capacity Factor (Using DER Net) U v u,.u
23. Unit Forced Ourage Rate O O 3.9
24. Shutdowns Schedoled Over Next 6 Months (Type.Date.and Duration of Eacht:

I

25. If Shut Down At l'nd Of Report Period. Estimated Date of Startup: '
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICA LITY INITIA L ELECTRICITY Coll \1ERCIA L OPERATION l

(9/771

. -~

,.-. -- _ _ - _ . _ _ - - - , _ - - -s

,=

50-251 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKETNO.

UNITNAME Jurkey F6 int 4

  • DATE _ FEB 1 4 1983 ~

COMPLETED 11y P. pace .

REPORTMONTH January, 1983 TELEPl!ONE TJ05) 552-mbt

,_ = =

Ibte

, .! E 3 $Yk Licensee ,~ g k% Cause & Corrective

.W .

S r-3= 4 .g g $ Event f h g? E-T , Action to y :ii $ j;5g . Report s ' mV jU Prevent Recurrence -

5 18 821009 S 744 H 4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41. .

g n

1 2 3 4 F: Forced Reason: Method: Exhibit G.Instruellons '

S: Sdieduled A.Etiuipment Failure (Explatn) 1. Manual . for Preparation of Data .

B. Maintenance of Test 24!anual Scram.

  • Entry Sheets for Liecusee C. Refueling . 3.Automatie Scram. Event Report (LER) File (NUREG.

D.Regdatory Restriction 9-Other (Explain) 01611 E.Operatiir Training & License Examination F. Administrative 9, ,

S

, G. Operational Error (Explain) 4- . 4oao ruove.,. .d Exhibit i .Same Source (9/77) li Other(Explain) *

SUMMARY

OF OPERATING EXPERIENCE DOCKET No. 50-251 UNIT _ Turkey Point 4 .

DATE FEB 14tgrn COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT HONTH Janua'ry 1983 Unit 4 continued the Steam Generator Repair Program Other major safety relat'ed maintenance activities included:

The Annual Station Battery Discharge Test was conducted.

Two Boric Acid neat tracing circuits were adjusted. -

Auxiliary feedwater instrumentation was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

l Florida Power & Light Company commitments for NUREG-0737 I

implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

l l

l t

l t

AVERAGE DAILY UNIT POWEPe LEVEL DOCKETNO. 50-335 UNIT St. Lucie 1 DATE FEB 141933 COMPLETED BY P. Pace TELEPil0NE(305) 552-3654 MONTH January, 1983 .

DAY AVER AGE DAILY POWER LEVEL DAY

~ AVERAGE DAILYPOWER LEVEL tMWe Net) -(MWe-Neti I 832 37 84 2 ~

831 gg 829 833 3 19 789' 740 4 797 20 5 658 769 21 757

. 6 22 765 173 7 806 23 8 229 843' 24 387 9 25 M 837 10 844 26 838 ,,

786 11 ->

839 g2 28 840 843 13 042 29 843 34 30 846 843 15 843 31 16 845 l

l INSTRUCTIONS On this format.1.s' Ihe average daily unit power lesel in MWr-Net for each day in the reporting m.inth. Compute to the nearest who e impwaii.

(9/771 G.

OPERATING DATA REPORT DOCKET NO. 50-335 DATE era >---

COMPLETED BY V." PbBeN TELEPHONE (106) E;7-3654 OPERATING STATUS

1. Unit Name: St. Lucie Unit 1 Notes Unit 1 operated at es-
2. Reporting Period: January, 1983 senttally full power except #
3. Licensed Thermal Power (MWt): 2700 for a brief outage as de-
4. Nameplate Rating (Gross MWe): 890 scribed in the ' Unit Shutdown
5. Design Electrical Rating (Net MWe): 830 - and Power Reductions" report.
6. Maximum Dependable Capacity (Gross MWe): 862
7. Maximum Dependable Capacity (Net MWe): 81/
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe): ---------
10. Reawns For Restiictions. If Any: --~~~~----

This Month Yr to-Date Cumulatise

11. Hours In Reporting Period 744 744 53,592
12. Number Of Hours Reactor Was Critical I44 744 "* *
13. Reactor Reserve Shutdown Hours 0 0 205.3
14. Hours Generator On Line , 728.7 728./ 42,954
15. Unit Reserve Shutdown Hours 0 0 39.3
16. Gross Thermal Energy Ge'nerated (MWH) 1.H77.76S* 1.872.765 107,008,281
17. Gross Electrical Energy Generated (MWH) 613.390 . . ,

613,390 34,826,985

18. Net Electrical Energy Generated (MWH) 581,098 581,U98 32,845,289
19. Unit Service Factor 97.9 9/.9 80.2
20. Unit Availability Factor 9/.9 9/.9 6u.2
21. Unit Capacity Factor (Using MDC Net) 95.6 95.6 78.3
22. Unit Capacity Factor (Using DER Net) 94.1 94.1 /6.0
23. Unit Forced Outage Rate 2.1 2.1 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Refuelina. February 26, 1983, 2 months

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status tPrior io Commercial Operation): Foreca<t Achieved INITIA L CRI flCA LITY INI flA L ELECTRICITY CO%1\lERCI A L OPER ATION 6
  • 7247 x 10 BTU used by St. Lucie Unit 2.

vnim

DOCKET NO. 50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS ,

UNIT NAME St. Lucie 1 DATE ttU 141981 REPORT MONTH January 1983 COMPLETED BY P Pace TELEPHONE (305)552-3654

= en 4 e.o 2 , - g

,, .2 _e  : -3 .s x Licensee g3, c Cause & Corrective No. Date g 3g j ,g g 5 Event u? S4~$ Action to

  • $E $ Report 2r 50 '

j di g Prevent Recurrence c5 1 830104 F 0 A 5 HF ft0TORX Power was reduced to repair a circulating water pump motor.

2 830108 F 15.3 A 1 HJ TURBIN The unit was removed from service to repair a steam leak from an orifice in a drain line under the high pressure turbine.

\

I 2 3 4 F: Forced Reason: Method: Exhibit G - instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Admimstrative pg ,

5 G-Operational Error (Explain) c _ to a.2 4,rt,vc;r. .</ Exhibit 1 - Same Source (9/77) Il-Osher (Explain)

SUZIMARY OF OPERATING EXPERIENCE DOCKET NO. J -335 UNIT St. Lucie Unit'l DATE _

FEB 14 m COMPLETED BY P. Pace TELEPHONE (305) 552-3654 REPORT tiONTH JANUARY 1983 St. Lucie Unit I reduced power on banuary 4, to replace a circulating water pump motor and to clean condenser water boxes. The unit was removed from service for 15.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on January 8-9 to repair a steam leak from an orifice in a drain line under the high pressure turbine.

Other major safety related maintenance included:

.Two boric acid heat tracing circuits were repaired.

Inspections ahii requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional infonnation.

4 In accordance with the requirements of NUREG-0737 Item II.k.3.3, there were i no challenges to PORV or safety valves during the report month.

l l

l l

i l

t i e