ML20069A192
| ML20069A192 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 02/14/1983 |
| From: | Pace P FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20069A120 | List: |
| References | |
| NUDOCS 8303150558 | |
| Download: ML20069A192 (8) | |
Text
.
OPERATING DATA REPORT Corrected Copy DOCKET NO. 5 3-m DATE fdB 1419R1 COMPLETEDBY P4 ace TELEPl!ONE t305).552-3654 OPERATING STATUS
- 1. Unit Name.
St. Lucie Unit 1 Notes May 1982 Unit 1 operated es.sentially
- 2. Reporting Pen. d:
o at full power except for a
- 3. Licensed Thermal Power (MWt):
2 g
steam generator inspection.
I
- 4. Nameplate Rating (Gross MWe):
outage. See Unit shutdown
- 5. Design Electrical Rating (Net MWe):
report.
830 862
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
817
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:'
- 9. Power Level To Which Restricted,if Any (Net MWe):
Nole
- 10. Reasons For Restrictions,if Any:
f-This Month Yr to-Date Cumulative
- 11. Hours in Reporting Period 744 3623 47711
- 12. Number Of Hours Reactor Was Critical 301.4 3180.4 38009.8
- 13. Reactor Reserve Shutdown flours 0
0 205.3~
- 14. Hours Generator On-Line 297.2 3176.2 37171.1
- 15. Unit Reserve Shutdown llours 0
0 39.3 768 617 8 413 176
.91 737 095
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 252 920 2 759 303 29 817 415
- 18. Net Electrical Energy Generated (MWH) 236 099 2 614 307 _,
'28 093 854
- 19. Unit Service Factor
.39.9 87.7 77.9
- 20. Unit Availability Factor 39.9 87.7
.78.0
- 21. Unit Capacity Factor (Using MDC Net) 38.8 91.0 75.7 38.2 88.7 73.3
- 22. Unit Capacity Factor (Using DER Net) 0 0
5.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and D:: ration of Each t:
I s
- 25. If Shut Down At E J Of Report Period. Estimated Date of Star:up:
- 26. Units In Test Status (Prior to Commercial Operation):
Foreca >t Achieved INITI A L CRITICALITY INITIAL ELECTRICIIY COM\\1ERCI AL OPER ATION EGO 3150558 830214
[DRADOCK 05000250 PlI7I PDR
~
OPERATING DATA REPORT Corrected Copy DOCKET NO.
50-335 DATE COMPLETED BY P... ac TELEPliONE
( 3~05) 552-3654 OPERATING STATUS
- 1. Unit Name:
St. Lucie Unit 1 Note 5
- 2. Reporting Period:
June 1982 Unit 1 operated at 2700 essentially full power
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
890 except for the outage listed in the unit shutdowns S. Design Electrical Rating (Net MWe):
830 report.
- 6. Maximum Dependable Capacity (Gross MWe):
862
- 7. Maximum Dependable Capacity (Net MWe):
817
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Tigggh 7) Since Last Report. Give Reason
- 9. Power Level To Which Restricted. If Any (Net MWe):
nnne
- 10. Reasons For Restrictions. If Any:
N/A h
This Month Yr..to.Da te Cumulative I1. Hours In Reporting Period 720 4343 48'431
- 12. Number Of flours Reactor Was Critical 720 3900.4 38729.8
- 13. Reactar Reserve Shutdown flours 205.3
- 14. Hours Generator On Line 714.8 3891 37885.9
- 15. Unit Reserve Shutdown Ilours.
33.3
- 16. Gross Thermal Energy Generated (MWH) 1897597
-~1011u//3 9363469t-
- 17. Gross Electrical Energy Generated (Mwil) 625250
~3384550 3dI476T>5
- 18. Net Electrical Energy Generated (MWH) 593528 3207835 2866/Ju2
- 19. Unit Service Factor 99.3 89 6
'U.2
- 20. Unit Availability Factor 99.3 89.6 78.3
- 21. Unit Capacity Factor IUsing MDC Net) 100.9 92.7 76.1
- 22. Unit Capacity Factor (Using DER Net) 99.3 90.5 73.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schedufed Oscr Nc.se 6 Months (Type.Date.and Duration of Eacht I
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
- 26. Uniits in Test Statu,IPrior ta Connnercial Operationi:
Foremt Achiesed INI l'1 \\ L CRIl'ICA LITY INi fl T L ELI.C TRICll Y CO\\l\\ll'ItCI A L OITR ATION (4/77)
OPERATING DATA REPORT Corrected Copy 50-335 DOCKET NO.
FE8 1 f ]r DATE P,L. Fa COMPLETED !!Y TELEPHONE (305) 552-3654 OPERATING STATUS St. Lucie Unit 1.
Notes
- 1. Unit Name:
July 1904 linit 1 Operated at
- 2. Reporting Pen. d:
essentially full power o
/UU
- 3. Licensed Thermal Power (MWt):
090
- 4. Nameplate Rating (Gross MWe):
830
- 5. Design Electrical Rating (Net MWe):
Ub4
- 6. Maximum Dependable Capacity (Gross MWe):
017
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
NA NONE
- 9. Power Lesel To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
NA This Month Yr..to-Date Cumulative II. Hours In Reporting Period 744 5087 49175
- 12. Number Of Hours Reactor Was Critical 7i*
"ENN*5 35b*k
~U~
~V"
- 13. Reactor Reserve Shutdown Hours I4, Hours Generator On.Line 744 4635 38629.9
- 15. Unit Reserve Shutdown Hours -U-av a 199Ud94 12301665 95625584
- 16. Gross Thermal Energy Generated (MWil)
- 17. Gross Electrical Energy Generated (MWH) 654760 4U3931U.
3109/425
- 18. Net Electrical Energy Generated (MWill 621878 38z9/13 293U92bu
- 19. Unit Service Factor 100 gj,1
/ c. o
- 20. Unit Asailability Facto, 100 91.1
/6.6
- 21. Unit Capacity Factor (Using MDC Net) 102.3 94.1 76.5
- 22. Unit Capacity Factor (Using DER Net) 100.7 97.U-
/4.z--
- 23. Unit Forced Outage Rate.1 4.9
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eachi:
- 25. If Shut Down At 1:nd Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INIIIAL CitiiICAl.1 FY INIIl \\L LLFCIltlCIIY
( 041\\l1 RCI A L OPER A IlON (9/77 )
\\
OPERATING DATA REPORT Corrected Copy 335 DOCKETNO. 7EB 14198 DATE COMPLETED BY P. L*. Pace TELEPHONE (30s) 552-3654 OPERATING STATUS
- 1. Unit Name:
St. Lucie 1 Notes Unit 1 operated at es-
- 2. Reporting Period:
August, 1982 sentially full power except 2700
- 3. Licensed Thermal Power (MWt):
for a brief outage ort 8/16/82.
- 4. Nameplate Rating (Gross MWe):
890 See " Unit Shutdowns and Power
- 5. Design Electrical Rating (Net MWe):
830 Rehchs Mon M 862 details.
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) SSce Last Report. Give Reasons:
- 9. Power Lesel To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictiom. If Any:
This Month Yr.-ro-Date Cumulative
- 11. Hours In Reporting Period 744 5831 49,919
- 12. Number Of Hours Reactor Was Critical 0*'
- 13. Reactor Reserve Shutdown Hours 0
0 205.3
- 14. Ilours Generator On Line 737.8 5372.8 39,367.7
- 15. Unit Reserve Shutdown flours 0
0 39.3
- 16. Gross Thermal Energy Generated (MWH) -
_1,965,785*
14,267,450-97,591,369
- 17. Gross Electrical Energy Generated (MWH) 644,230_,,
4,683,540 31,/41,b>>
- 18. Net Electrical Energy Generated (MWH) 611,329 4,441,04z zy,9zu,3ov
- 19. Unit Service Factor 99.2 92.1 eo.)
- 20. Unit Availability Factor yy*z 73.3 92.1
- 21. Unit Capacity Factor (Using MDC Neti 100.6 95.0
/b.9
- 22. Unit Capacity Factor (Using DER Net) 99.0 92.9 I '+.
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schednied Oier Next 6 Months (Type. Date.and Duration of Eacht:
I
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Statu, (Prior o Conunercial Operation):
Force st Achiesed INill4 L CRITICA LITY 1.NI flAL ELEC fRICITY CO\\l\\1LRCI A L OPER ATION
- 368 Mull (thermal) used for St. Lucie Unit 2 testing.
(9/7D
- e
o OPERATING DATA REPORT Corrected Copy DOCKET NO. 50-335 DATE FEB 14 tw3 COMPLETED BY P. Pace TELEPHONE 1305)552-3654 OPERATING STATUS
~
- 3. Unit Name:
St. Lucie 1 Notes
- 2. Reporting Period:
September 1982 Units 1 operated at. ementfally
- 3. Licensed Thermal Power (MWt):
2700 full power except for two
- 4. Nameplate Rating (Gross MWe):
890 Mef ocages Gee Wt
- 5. Design Electrical Rating (Net MWe): _
830 hhs aM helehe@ns report.
- 6. Maximum Dependable Capacity (Gross MWe):
862
- 7. Maximum Dependable Capacity (Net MWe):
817
_8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Giv
- 9. Power Level To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
j This Month Yr to.Date Cumularise
- 11. Hours in Reporting Period 720 6.551
,_ 50,639
- 12. Number Of Hours Reactor Was Critical 711.3 6.094.6 40,924
- 13. Reactor Reserve Shutdown Hours 0
0 205.3
- 14. Hours Generator On-Line 707.0 6,079.8 40,074.7
- 15. Unit Reserve Shutdown H,ours 0
0 39.3
- 16. Cross Thermal Energy Generated (MWH) 1.872.813
_16.140.263 99,464,182.
- 17. Gross Electrical Energy Generated (MWH) 611.2AQ__.. 5.294.780 32,352,895
- 18. Net Electrical Energy Generated (MWH) 579.625
_ 5,020,667 30,500',214
- 19. Unit Sersice Factor 98.2 92.8 79.1
- 20. Unit Availability Factor 98.2 92.8 79.2
- 21. Unit Capacity Factor (Using MDC Net!
98.5 95.4 77.2
- 22. Unit Capacity Factor (Using DER Net) 97.0 93.4 74.9
- 23. Unit Forced Outage Rate 1.8
.4 4.8
- 24. Shutdowns Scheduled Over Next 6 Months IType.Date,and Duration of Eacht:
1
- 25. If Shut Down At l.'nd Of Report Period. Estimated Date of Startup:
- 26. Units In Test Statm lPriier to Conunercial Operationi:
Forcea<t Achiesed INITIA L CRIIICA LITY INIIIAL ELECTRICITY
( UM\\lLRCIA1. OPERATION (u/773
}
OPERATING DATA REPORT Corrected Copy DOCKET NO. 50-335 DATE W A4i g i
COMPLETED BY P-Pa'ch TELEPHONE t'nci"R'-3654 OPERATING STATUS
- 1. -Unit Name:
st. Lucie Unit 1 Notes Unit 1 operated at es-
- 2. ReportingPeriod:
October 1982 sentially full power except
- 3. Licensed Thermal Power (MWr):
2700 for a brief outage. See the
- 4. Nameplate Rating (Gross MWe):
890
,, Unit Shutdowns and Power
- 5. Design ElectricalItating(Net MWe):
830 tails.
- 6. Maximum Depeini.ihle Capacity (Gross MWe):
862 8 17
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
t
- 9. Power Level To Wiiich Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
D This Month Yr to.Date Cumulative.
I1. Hours In Repostintt l'criod 745 7,296 51,384
- 12. Number OfIluurs Reactor Was Critical 735.4 6,830 41,659.4
- 13. Reactor Reserve fihutdown Hours 0
0 205.3
- 14. Hours Generator Un Line 718.2 6.798 40,792.9
- 15. Unit Reserve Shutdown Hours n
0 39.3
- 16. Gross Thermal Energy Ce'nerated (MWH) 1.897.947 18,038,210 101,362,129
- 17. Gross Electrical Energy Generated (MWH) 621,300 5.916,080 32,974,195
- 18. Net Electrical Energy Generated (MWH) 588.718 5,609,385 31,'088,932
- 19. Unit Service Factor 96.4 93.2 79 4
- 20. Unit Availability Factor 96.4 93.2 79.5
- 21. Unit Capacity F.irtor (Using MDC Net) 96.7 95.5 77,4
- 22. Unit Capacity T.ator(Using DER Net) 95.2 93.6 75.2
- 23. Unit Forced Ontage Rate 1A
.7 4.8
- 24. Shutdowns Scient.. led Over Next 6 Months (Type. Date,and Duration of Eachl:
- 25. If Shut Down Ai End Of Report Period, Estimated Date of Startup:
- 26. Units In Test 5:it n(Prior to Conunercial Operation):
Forecast Achieved INITIAL CRITICALITY l'.I flAL ELECTRICITY
( O\\tNIERCIA L OPERATION (4/77I
OPERATING DATA RE? ORT Corrected Copy DOCKET NO. _50-335 DATE FER 14tqR1 COMPLETED BY P. Pace TELEPHONE OPERATING STATUS
- 1. Unit Name:
St. Lucie 1 Notes
- 2. Reporting Period:
November 1982 Unit 1 operated at essentiall
- 3. Licensed Thermal Power (MWr):
>700 3
- 4. Nameplate Rating (Gross MWe):
non full PW r X ePt for brief
- 5. Design Electrical Rating (Net MWe): -
830 outages. See " Unit' Shutdowns
- 6. Maximum Dependable Capacity (Gross MWe):
862 and Power Reductions" Report.
- 7. Maximum Dependable Capacity (Net MWe):
817
- 8. If Changes 0ccur in Capacity Ratings (Items Number 3 Through 71 SS:e Last Report.Give Rea
- 9. Power Level To WI.ich Restricted.If Any (Net MWe):
- 10. Reasons For Resteittions.If Any:
~-;
This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 720
- 12. Number Of Hours Itcactor Was Critical 698.2 _
8,016
- 52,104 7,528.2 42,357.6
- 13. Reactor Reserve hhutdown llours 0
0 205.3
- 14. Hours Generatos On 1.ine 691.8 7,489.8 41,484.7
- 15. Unit Reserve Shuhtown I!ours 0
0 39.3
- 16. Gross Thermal Energy Ge'nerated (MWil) 1,816,532*
_19,854,742
_103,178,661
- 17. Gross Electrical Energy Generated (MWH) 596.5_50 6,512,630
_ 33,570.745
- 18. Net Electrical Energy Generated (MWH) 565.107
- 19. Unit Service Factor 96.1 6,174,492 31*,654,039
- 20. Unit Availability Factor 96.1 93.4 79.6 93.4 _
79.7
- 21. Unit Capacity Factor (Using MDC Net) 96.1 95.6
- 23. Unit Forced Outre Rate 93.6 77.7
- 22. Unit Capacity Factor (U>ing DER Net) 94.6 3.9 1.1 __
75.4 4.8
- 24. Shutdown 5 Scheduled Over Nc.st 6 Months (Type.Date.and Duration of Eacht:
Refueling, lurch 1982, 2 months
- 25. If Shut Down At I oJ Of Report Period.1Stimated Date of Startup:
- 26. Units in Test St.iros (l*rior to Conunercial Operationi:
Fe.reca<r Achieved INi l'lA L CRll ICA l.1 TY INIIl\\L El.ECIRICITY
( t i\\1\\1l.RCIA L OPER ATION 3630x106 BTU diverted to St. Lucie Unit 2 for testir:;.
Ini m
o OPERATING DATA REPORT Corrected Copy DOCKET NO. 50-335_,,
j DATE FER 1M e i
COMPLETEliBY ace TELEPHONE 552-3654 OPERATING STATUS
- 1. Unit Name:
St. l_ucie 1 Notes
- 2. Reporting Period:
December 1982 Unit 1 operated at estse'ntially full power except
- 3. Licensed Thermal Power (MWr):
2700 for a brief o'utage as describ-
- 4. Nameplate Rating (Gross MWe):
890 ed in the " Unit Shutdowns and S. Design Electrical Rating (Net MWe):
830 Power Reductions" Report
'6. Maximum Dependable Capacity (Gross MWe):
862
- 7. Maximum Deg.cndable Capacity (Net MWe):
817
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted.lf Any (Net MWe):
- 10. Reasons For Restwtions. lf Any:
This Month Yr..to Date Cumulative A
- 11. Hours In Reporting Period 744 8 760 52 848
- 12. Number Of Hours Reactor Was Critical 741.6 8 269.8 43 099.2
- 13. Reactor Reserve Shutdown Hours 0
0 i
'205.3
- 14. Hours Generator O. Line 740.6 8,230.4 42 225.3
- 15. Unit Reserve Shutdown Hours 0
0 39.3
- 16. Gross Thermal Energy Ge'erated (MWH) 1 956 855 21 811 597 105 135 516 n
- 17. Gross Electrical Energy Generated (MWH) 642 850 7 155 480 34 213 595
- 18. Net Electrical Energy Generated (MWH) 610 152 6 784 644 32 264 191 19 Unit Service Facto, 99.5 94.0_
79.9
- 20. Unit Availability Factor 99.5 94.0 80.0 100.4 95.9 78.0
- 21. Unit Capacity Factor (Using MDC Net) 1
- 22. Unit Capacity Factor (Using DER Net) 98.8 94.1 75.8
- 23. Unit Forced Outage Rate 0.5 1,o 4.7
- 24. Shutdowns Scheduled Over Nat 6 Months (Type.Date.and Duration of E::ch t:
Refueling, March 1983, 2 months.
t 1
i I
l
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test St.itus (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY C011\\1EllCIAL OPER ATION 07/77i
)