OPERATING DATA REPORT Corrected Copy DOCKET NO. 5 3-m DATE fdB 1419R1 COMPLETEDBY P4 ace TELEPl!ONE t305).552-3654 OPERATING STATUS

1. Unit Name.

St. Lucie Unit 1 Notes May 1982 Unit 1 operated es.sentially

2. Reporting Pen. d:

o at full power except for a

3. Licensed Thermal Power (MWt):

2 g

steam generator inspection.

I

4. Nameplate Rating (Gross MWe):

outage. See Unit shutdown

5. Design Electrical Rating (Net MWe):

report.

830 862

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

817

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:'
9. Power Level To Which Restricted,if Any (Net MWe):

Nole

10. Reasons For Restrictions,if Any:

f-This Month Yr to-Date Cumulative

11. Hours in Reporting Period 744 3623 47711
12. Number Of Hours Reactor Was Critical 301.4 3180.4 38009.8
13. Reactor Reserve Shutdown flours 0

0 205.3~

14. Hours Generator On-Line 297.2 3176.2 37171.1
15. Unit Reserve Shutdown llours 0

0 39.3 768 617 8 413 176

.91 737 095

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 252 920 2 759 303 29 817 415
18. Net Electrical Energy Generated (MWH) 236 099 2 614 307 _,

'28 093 854

19. Unit Service Factor

.39.9 87.7 77.9

20. Unit Availability Factor 39.9 87.7

.78.0

21. Unit Capacity Factor (Using MDC Net) 38.8 91.0 75.7 38.2 88.7 73.3
22. Unit Capacity Factor (Using DER Net) 0 0

5.1

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and D:: ration of Each t:

I s

25. If Shut Down At E J Of Report Period. Estimated Date of Star:up:
26. Units In Test Status (Prior to Commercial Operation):

Foreca >t Achieved INITI A L CRITICALITY INITIAL ELECTRICIIY COM\\1ERCI AL OPER ATION EGO 3150558 830214

[DRADOCK 05000250 PlI7I PDR

~

OPERATING DATA REPORT Corrected Copy DOCKET NO.

50-335 DATE COMPLETED BY P... ac TELEPliONE

( 3~05) 552-3654 OPERATING STATUS

1. Unit Name:

St. Lucie Unit 1 Note 5

2. Reporting Period:

June 1982 Unit 1 operated at 2700 essentially full power

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

890 except for the outage listed in the unit shutdowns S. Design Electrical Rating (Net MWe):

830 report.

6. Maximum Dependable Capacity (Gross MWe):

862

7. Maximum Dependable Capacity (Net MWe):

817

8. If Changes Occur in Capacity Ratings (Items Number 3 Tigggh 7) Since Last Report. Give Reason
9. Power Level To Which Restricted. If Any (Net MWe):

nnne

10. Reasons For Restrictions. If Any:

N/A h

This Month Yr..to.Da te Cumulative I1. Hours In Reporting Period 720 4343 48'431

12. Number Of flours Reactor Was Critical 720 3900.4 38729.8
13. Reactar Reserve Shutdown flours 205.3
14. Hours Generator On Line 714.8 3891 37885.9
15. Unit Reserve Shutdown Ilours.

33.3

16. Gross Thermal Energy Generated (MWH) 1897597

-~1011u//3 9363469t-

17. Gross Electrical Energy Generated (Mwil) 625250

~3384550 3dI476T>5

18. Net Electrical Energy Generated (MWH) 593528 3207835 2866/Ju2
19. Unit Service Factor 99.3 89 6

'U.2

20. Unit Availability Factor 99.3 89.6 78.3
21. Unit Capacity Factor IUsing MDC Net) 100.9 92.7 76.1
22. Unit Capacity Factor (Using DER Net) 99.3 90.5 73.7
23. Unit Forced Outage Rate
24. Shutdowns Schedufed Oscr Nc.se 6 Months (Type.Date.and Duration of Eacht I
25. If Shut Down At End Of Report Period. Estimated Date of Startup.
26. Uniits in Test Statu,IPrior ta Connnercial Operationi:

Foremt Achiesed INI l'1 \\ L CRIl'ICA LITY INi fl T L ELI.C TRICll Y CO\\l\\ll'ItCI A L OITR ATION (4/77)

OPERATING DATA REPORT Corrected Copy 50-335 DOCKET NO.

FE8 1 f ]r DATE P,L. Fa COMPLETED !!Y TELEPHONE (305) 552-3654 OPERATING STATUS St. Lucie Unit 1.

Notes

1. Unit Name:

July 1904 linit 1 Operated at

2. Reporting Pen. d:

essentially full power o

/UU

3. Licensed Thermal Power (MWt):

090

4. Nameplate Rating (Gross MWe):

830

5. Design Electrical Rating (Net MWe):

Ub4

6. Maximum Dependable Capacity (Gross MWe):

017

7. Masimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NA NONE

9. Power Lesel To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

NA This Month Yr..to-Date Cumulative II. Hours In Reporting Period 744 5087 49175

12. Number Of Hours Reactor Was Critical 7i*

"ENN*5 35b*k

~U~

~V"

13. Reactor Reserve Shutdown Hours I4, Hours Generator On.Line 744 4635 38629.9
15. Unit Reserve Shutdown Hours -U-av a 199Ud94 12301665 95625584
16. Gross Thermal Energy Generated (MWil)
17. Gross Electrical Energy Generated (MWH) 654760 4U3931U.

3109/425

18. Net Electrical Energy Generated (MWill 621878 38z9/13 293U92bu
19. Unit Service Factor 100 gj,1

/ c. o

20. Unit Asailability Facto, 100 91.1

/6.6

21. Unit Capacity Factor (Using MDC Net) 102.3 94.1 76.5
22. Unit Capacity Factor (Using DER Net) 100.7 97.U-

/4.z--

23. Unit Forced Outage Rate.1 4.9
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eachi:
25. If Shut Down At 1:nd Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INIIIAL CitiiICAl.1 FY INIIl \\L LLFCIltlCIIY

( 041\\l1 RCI A L OPER A IlON (9/77 )

\\

OPERATING DATA REPORT Corrected Copy 335 DOCKETNO. 7EB 14198 DATE COMPLETED BY P. L*. Pace TELEPHONE (30s) 552-3654 OPERATING STATUS

1. Unit Name:

St. Lucie 1 Notes Unit 1 operated at es-

2. Reporting Period:

August, 1982 sentially full power except 2700

3. Licensed Thermal Power (MWt):

for a brief outage ort 8/16/82.

4. Nameplate Rating (Gross MWe):

890 See " Unit Shutdowns and Power

5. Design Electrical Rating (Net MWe):

830 Rehchs Mon M 862 details.

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) SSce Last Report. Give Reasons:
9. Power Lesel To Which Restricted.If Any (Net MWe):
10. Reasons For Restrictiom. If Any:

This Month Yr.-ro-Date Cumulative

11. Hours In Reporting Period 744 5831 49,919
12. Number Of Hours Reactor Was Critical 0*'
13. Reactor Reserve Shutdown Hours 0

0 205.3

14. Ilours Generator On Line 737.8 5372.8 39,367.7
15. Unit Reserve Shutdown flours 0

0 39.3

16. Gross Thermal Energy Generated (MWH) -

_1,965,785*

14,267,450-97,591,369

17. Gross Electrical Energy Generated (MWH) 644,230_,,

4,683,540 31,/41,b>>

18. Net Electrical Energy Generated (MWH) 611,329 4,441,04z zy,9zu,3ov
19. Unit Service Factor 99.2 92.1 eo.)
20. Unit Availability Factor yy*z 73.3 92.1
21. Unit Capacity Factor (Using MDC Neti 100.6 95.0

/b.9

22. Unit Capacity Factor (Using DER Net) 99.0 92.9 I '+.
23. Unit Forced Outage Rate
24. Shutdowns Schednied Oier Next 6 Months (Type. Date.and Duration of Eacht:

I

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Statu, (Prior o Conunercial Operation):

Force st Achiesed INill4 L CRITICA LITY 1.NI flAL ELEC fRICITY CO\\l\\1LRCI A L OPER ATION

  • 368 Mull (thermal) used for St. Lucie Unit 2 testing.

(9/7D

  • e

o OPERATING DATA REPORT Corrected Copy DOCKET NO. 50-335 DATE FEB 14 tw3 COMPLETED BY P. Pace TELEPHONE 1305)552-3654 OPERATING STATUS

~

3. Unit Name:

St. Lucie 1 Notes

2. Reporting Period:

September 1982 Units 1 operated at. ementfally

3. Licensed Thermal Power (MWt):

2700 full power except for two

4. Nameplate Rating (Gross MWe):

890 Mef ocages Gee Wt

5. Design Electrical Rating (Net MWe): _

830 hhs aM helehe@ns report.

6. Maximum Dependable Capacity (Gross MWe):

862

7. Maximum Dependable Capacity (Net MWe):

817

_8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Giv

9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions.lf Any:

j This Month Yr to.Date Cumularise

11. Hours in Reporting Period 720 6.551

,_ 50,639

12. Number Of Hours Reactor Was Critical 711.3 6.094.6 40,924
13. Reactor Reserve Shutdown Hours 0

0 205.3

14. Hours Generator On-Line 707.0 6,079.8 40,074.7
15. Unit Reserve Shutdown H,ours 0

0 39.3

16. Cross Thermal Energy Generated (MWH) 1.872.813

_16.140.263 99,464,182.

17. Gross Electrical Energy Generated (MWH) 611.2AQ__.. 5.294.780 32,352,895
18. Net Electrical Energy Generated (MWH) 579.625

_ 5,020,667 30,500',214

19. Unit Sersice Factor 98.2 92.8 79.1
20. Unit Availability Factor 98.2 92.8 79.2
21. Unit Capacity Factor (Using MDC Net!

98.5 95.4 77.2

22. Unit Capacity Factor (Using DER Net) 97.0 93.4 74.9
23. Unit Forced Outage Rate 1.8

.4 4.8

24. Shutdowns Scheduled Over Next 6 Months IType.Date,and Duration of Eacht:

1

25. If Shut Down At l.'nd Of Report Period. Estimated Date of Startup:
26. Units In Test Statm lPriier to Conunercial Operationi:

Forcea<t Achiesed INITIA L CRIIICA LITY INIIIAL ELECTRICITY

( UM\\lLRCIA1. OPERATION (u/773

}

OPERATING DATA REPORT Corrected Copy DOCKET NO. 50-335 DATE W A4i g i

COMPLETED BY P-Pa'ch TELEPHONE t'nci"R'-3654 OPERATING STATUS

1. -Unit Name:

st. Lucie Unit 1 Notes Unit 1 operated at es-

2. ReportingPeriod:

October 1982 sentially full power except

3. Licensed Thermal Power (MWr):

2700 for a brief outage. See the

4. Nameplate Rating (Gross MWe):

890

,, Unit Shutdowns and Power

5. Design ElectricalItating(Net MWe):

830 tails.

6. Maximum Depeini.ihle Capacity (Gross MWe):

862 8 17

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

t

9. Power Level To Wiiich Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

D This Month Yr to.Date Cumulative.

I1. Hours In Repostintt l'criod 745 7,296 51,384

12. Number OfIluurs Reactor Was Critical 735.4 6,830 41,659.4
13. Reactor Reserve fihutdown Hours 0

0 205.3

14. Hours Generator Un Line 718.2 6.798 40,792.9
15. Unit Reserve Shutdown Hours n

0 39.3

16. Gross Thermal Energy Ce'nerated (MWH) 1.897.947 18,038,210 101,362,129
17. Gross Electrical Energy Generated (MWH) 621,300 5.916,080 32,974,195
18. Net Electrical Energy Generated (MWH) 588.718 5,609,385 31,'088,932
19. Unit Service Factor 96.4 93.2 79 4
20. Unit Availability Factor 96.4 93.2 79.5
21. Unit Capacity F.irtor (Using MDC Net) 96.7 95.5 77,4
22. Unit Capacity T.ator(Using DER Net) 95.2 93.6 75.2
23. Unit Forced Ontage Rate 1A

.7 4.8

24. Shutdowns Scient.. led Over Next 6 Months (Type. Date,and Duration of Eachl:
25. If Shut Down Ai End Of Report Period, Estimated Date of Startup:
26. Units In Test 5:it n(Prior to Conunercial Operation):

Forecast Achieved INITIAL CRITICALITY l'.I flAL ELECTRICITY

( O\\tNIERCIA L OPERATION (4/77I

OPERATING DATA RE? ORT Corrected Copy DOCKET NO. _50-335 DATE FER 14tqR1 COMPLETED BY P. Pace TELEPHONE OPERATING STATUS

1. Unit Name:

St. Lucie 1 Notes

2. Reporting Period:

November 1982 Unit 1 operated at essentiall

3. Licensed Thermal Power (MWr):

>700 3

4. Nameplate Rating (Gross MWe):

non full PW r X ePt for brief

5. Design Electrical Rating (Net MWe): -

830 outages. See " Unit' Shutdowns

6. Maximum Dependable Capacity (Gross MWe):

862 and Power Reductions" Report.

7. Maximum Dependable Capacity (Net MWe):

817

8. If Changes 0ccur in Capacity Ratings (Items Number 3 Through 71 SS:e Last Report.Give Rea
9. Power Level To WI.ich Restricted.If Any (Net MWe):
10. Reasons For Resteittions.If Any:

~-;

This Month Yr to Date Cumulative

11. Hours In Reporting Period 720
12. Number Of Hours Itcactor Was Critical 698.2 _

8,016

- 52,104 7,528.2 42,357.6

13. Reactor Reserve hhutdown llours 0

0 205.3

14. Hours Generatos On 1.ine 691.8 7,489.8 41,484.7
15. Unit Reserve Shuhtown I!ours 0

0 39.3

16. Gross Thermal Energy Ge'nerated (MWil) 1,816,532*

_19,854,742

_103,178,661

17. Gross Electrical Energy Generated (MWH) 596.5_50 6,512,630

_ 33,570.745

18. Net Electrical Energy Generated (MWH) 565.107
19. Unit Service Factor 96.1 6,174,492 31*,654,039
20. Unit Availability Factor 96.1 93.4 79.6 93.4 _

79.7

21. Unit Capacity Factor (Using MDC Net) 96.1 95.6
23. Unit Forced Outre Rate 93.6 77.7
22. Unit Capacity Factor (U>ing DER Net) 94.6 3.9 1.1 __

75.4 4.8

24. Shutdown 5 Scheduled Over Nc.st 6 Months (Type.Date.and Duration of Eacht:

Refueling, lurch 1982, 2 months

25. If Shut Down At I oJ Of Report Period.1Stimated Date of Startup:
26. Units in Test St.iros (l*rior to Conunercial Operationi:

Fe.reca<r Achieved INi l'lA L CRll ICA l.1 TY INIIl\\L El.ECIRICITY

( t i\\1\\1l.RCIA L OPER ATION 3630x106 BTU diverted to St. Lucie Unit 2 for testir:;.

Ini m

o OPERATING DATA REPORT Corrected Copy DOCKET NO. 50-335_,,

j DATE FER 1M e i

COMPLETEliBY ace TELEPHONE 552-3654 OPERATING STATUS

1. Unit Name:

St. l_ucie 1 Notes

2. Reporting Period:

December 1982 Unit 1 operated at estse'ntially full power except

3. Licensed Thermal Power (MWr):

2700 for a brief o'utage as describ-

4. Nameplate Rating (Gross MWe):

890 ed in the " Unit Shutdowns and S. Design Electrical Rating (Net MWe):

830 Power Reductions" Report

'6. Maximum Dependable Capacity (Gross MWe):

862

7. Maximum Deg.cndable Capacity (Net MWe):

817

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted.lf Any (Net MWe):
10. Reasons For Restwtions. lf Any:

This Month Yr..to Date Cumulative A

11. Hours In Reporting Period 744 8 760 52 848
12. Number Of Hours Reactor Was Critical 741.6 8 269.8 43 099.2
13. Reactor Reserve Shutdown Hours 0

0 i

'205.3

14. Hours Generator O. Line 740.6 8,230.4 42 225.3
15. Unit Reserve Shutdown Hours 0

0 39.3

16. Gross Thermal Energy Ge'erated (MWH) 1 956 855 21 811 597 105 135 516 n
17. Gross Electrical Energy Generated (MWH) 642 850 7 155 480 34 213 595
18. Net Electrical Energy Generated (MWH) 610 152 6 784 644 32 264 191 19 Unit Service Facto, 99.5 94.0_

79.9

20. Unit Availability Factor 99.5 94.0 80.0 100.4 95.9 78.0
21. Unit Capacity Factor (Using MDC Net) 1
22. Unit Capacity Factor (Using DER Net) 98.8 94.1 75.8
23. Unit Forced Outage Rate 0.5 1,o 4.7
24. Shutdowns Scheduled Over Nat 6 Months (Type.Date.and Duration of E::ch t:

Refueling, March 1983, 2 months.

t 1

i I

l

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test St.itus (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY C011\\1EllCIAL OPER ATION 07/77i

)