Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl ML20205H4051999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3891999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1).Page 2 in Third Amend Power Sales Contract of Incoming Submittal Not Included ML20205A9441999-03-25025 March 1999 Forwards VEGP Unit 1 Cycle 9 Colr,Per TS 5.6.5.d ML20205H3811999-03-24024 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3621999-03-22022 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81, as Requested IAW 10CFR50.75(f)(1) ML20204G4361999-03-18018 March 1999 Forwards Summary Rept of Present Level & Source of on-site Property Damage Insurance Coverage for Vegp,Iaw Requirements of 10CFR50.54(w)(3) ML20204C0591999-03-17017 March 1999 Forwards Rev 0 to WCAP-15160, Evaluation of Pressurized Thermal Shock for Vegp,Unit 2 & Rev 0 to WCAP-15159, Analysis of Capsule X from Vegp,Unit 2 Reactor Vessel Radiation Surveillance Program ML20207K9551999-03-11011 March 1999 Forwards Response to Rai,Pertaining to Positive Alcohol Test of Licensed Operator.Encl Info Provided for NRC Use in Evaluation of Fitness for Duty Occurrence.Encl Withheld,Per 10CFR2.790(a)(6) ML20207L9721999-03-10010 March 1999 Forwards Rev 15 to EPIP 91104-C of Manual Set 6 of Vogtle Epips.Without Encl ML20207B0191999-02-25025 February 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 980701-1231,IAW 10CFR26.71(d) 05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 9812291999-01-27027 January 1999 Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 ML20199F7701999-01-13013 January 1999 Submits Revised Response to RAI Re Licensee 980713 Proposed Amend to Ts,Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Protection Channels. Corrected Copy of Table,Encl ML20199F7981999-01-13013 January 1999 Forwards Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage. Change Bar in Margin of Affected Pages Denotes Changes to Rept ML20199G1381999-01-13013 January 1999 Forwards Copy of Permit Renewal Application Package for NPDES Permit Number GA0026786,per Section 3.2 of VP Environ Protection Plan 05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.731999-01-13013 January 1999 Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 ML20198F6131998-12-18018 December 1998 Forwards Revised Certification of Medical Exam Form for License SOP-21147.Licensee Being Treated for Hypertension. Util Requests That Individual License Be Amended to Reflect Change in Status ML20198L6631998-12-18018 December 1998 Forwards Amend 37 to Physical Security & Contingency Plan. Encl 1 Provides Description & Justification for Changes & Encl 2 Contains Actual Amend 37 Pages.Amend Withheld,Per 10CFR73.21 ML20198D9291998-12-16016 December 1998 Forwards Requested Info Re Request to Revise TSs Elimination of Periodic Pressure Sensor Response Time Tests & Elimination of Periodic Protection Channel Response Time Tests ML20198D9991998-12-16016 December 1998 Forwards Responses to 980916 RAI Re Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations ML20198D8171998-12-14014 December 1998 Forwards NRC Form 396 & Form 398 for Renewal of License OP-20993.Without Encls ML20206N3051998-12-0808 December 1998 Submits RAI Re Replacement of Nuclear Instrument Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys 1999-09-20
[Table view] Category:UTILITY TO NRC
MONTHYEARELV-02056, Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam1990-09-0606 September 1990 Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam ELV-01599, Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator1990-09-0404 September 1990 Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator ELV-02059, Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B1990-08-30030 August 1990 Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B ELV-01956, Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request1990-08-30030 August 1990 Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request ELV-02050, Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required1990-08-30030 August 1990 Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required ELV-02028, Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d)1990-08-22022 August 1990 Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d) ELV-02022, Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld1990-08-22022 August 1990 Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld ELV-02027, Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively1990-08-20020 August 1990 Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively ELV-01973, Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical1990-08-14014 August 1990 Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical ELV-01918, Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion1990-08-0303 August 1990 Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion ELV-01943, Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned1990-07-27027 July 1990 Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned ELV-01949, Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable1990-07-26026 July 1990 Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable ELV-01500, Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities1990-07-25025 July 1990 Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities ML20055H6441990-07-23023 July 1990 Submits Summary of Snubber Types & Sample Plans for Functional Testing to Be Performed During Sept 1990 Outage ML20044B0311990-07-13013 July 1990 Forwards Vogtle Electric Generating Plant Unit 1 Reactor Containment Bldg 1990 Integrated Leakage Rate Test Final Rept. ML20044B1541990-07-12012 July 1990 Responds to NRC 900612 Ltr Re Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Eop Step Deviation Documents to Be Upgraded,Adding More Justification & Temporary Change Issued to Correct EOP Deficiencies ELV-01867, Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered1990-07-12012 July 1990 Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered ML20055F1651990-07-0909 July 1990 Forwards Comments Re NUREG-1410 ELV-01858, Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete1990-07-0606 July 1990 Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete ML20044A8851990-07-0606 July 1990 Forwards Response to NRC Question on Steam Generator Level Instrumentation Setpoints,Per Revised Instrument Line Tap Locations.Tap Location Will Be Changed from Above Transition Cone to Below Transition Cone ELV-01834, Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21)1990-06-28028 June 1990 Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21) ML20044A2791990-06-25025 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Indicating Status of Each Generic Safety Issue Encl ML20043J0171990-06-22022 June 1990 Discusses Corrective Actions for Plant Site Area Emergency, Per 900514 Ltr.Jacket Water High Temp Switches Calibr for Diesel Generators,Using Revised Calibr Procedure ML20043H3061990-06-15015 June 1990 Forwards Rev 3 to ISI-P-014, Inservice Insp Program, for Review & Approval,Per Tech Spec 4.0.5 Re Surveillance Requirements.Rev Includes Withdrawal of Relief Requests RR-45,47,48 & 54 ML20043G2071990-06-12012 June 1990 Forwards Amend 18 to Physical Security & Contingency Plan. Amend Withheld (Ref 10CFR73.21) ML20043G1021990-06-0606 June 1990 Requests Temporary Waiver of Compliance from Requirements of Action Statement 27 of Tech Spec 3.3.2 for Period of 6 H When Two Operating Control Room Emergency Filtration Sys Trains Shut Down for Required Testing ML20043E6901990-06-0505 June 1990 Forwards Rev 12 to Emergency Plan & Detailed Description & Justification of Changes.W/O Rev ML20043G7651990-06-0505 June 1990 Forwards Rev 13 to Emergency Plan & Description & Justification of Changes ML20043B5991990-05-25025 May 1990 Forwards Scope & Objectives Re 1990 Annual Emergency Preparedness Exercise to Be Conducted on 900801 ML20043B5981990-05-24024 May 1990 Responds to Violations Noted in Insp Rept 50-424/90-05 on 900217-0330.Corrective Actions:Locked Valve Procedure Revised to Eliminate Utilization of Hold Tag on Valves Required by Tech Specs to Be Secured in Position ML20043B6291990-05-22022 May 1990 Forwards Rev 5 to ISI-P-008, Inservice Testing Program, Per Tech Specs 4.0.5 Re Surveillance Requirements & Generic Ltr 89-04 ML20043B6351990-05-22022 May 1990 Forwards Rev 2 to ISI-P-016, Inservice Testing Program, Per Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. ML20042H0601990-05-14014 May 1990 Forwards Summary of Corrective Actions for 900320 Site Area Emergency Due to Loss of Offsite Power Concurrent W/Loss of Onsite Emergency Diesel Generator Capability.Truck Driver Disciplined for Lack of Attention ML20042G7301990-05-11011 May 1990 Forwards Revised Pages for May 1989,Jan & Mar 1990 Monthly Operating Repts for Vogtle Electric Generating Plant,Units 1 & 2.Revs Necessary Due to Errors Discovered in Ref Repts ML20042E2911990-04-18018 April 1990 Forwards Amend 17 to Security Plan.Amend Withheld (Ref 10CFR2.790) ML20042E7481990-04-0909 April 1990 Requests Approval to Return Facility to Mode 2 & Subsequent Power Operation,Per 900320 Event Re Loss of Offsite Power Concurrent W/Loss of Onsite Emergency Diesel Generator Capability ML20012E9001990-03-28028 March 1990 Provides Supplemental Response to Station Blackout Rule,Per NUMARC 900104 Request.Mods & Associated Procedure Changes Identified in Sections B & C W/Exception of Mods to Seals Will Be Completed 1 Yr from Acceptance of Analysis ML20012E8581990-03-28028 March 1990 Suppls Response to NRC Bulletin 88-010,Suppl 1 Re Traceability Reviews on Molded Case Circuit Breakers Installed in safety-related Applications.All Breakers Procured & Installed in Class 1E Equipment Reviewed ML20012E9761990-03-27027 March 1990 Requests Withdrawal of Inservice Insp Relief Requests RR-45, RR-47,RR-48 & Conditional Withdrawal of RR-54 Based on Reasons Discussed in Encl,Per 900206 Conference Call ML20012D8561990-03-22022 March 1990 Submits Special Rept 1-90-02 Re Number of Steam Generator Tubes Plugged During 1R2.One of Four Tubes Exceeded Plugging Limit & Required Plugging.Remaining Three Tubes Plugged as Precautionary Measure.No Defective Tubes Detected ML20012D6641990-03-22022 March 1990 Provides Followup Written Request for Waiver of Compliance to Make Tech Spec 3.04 Inapplicable to Tech Spec 3.8.1.2 to Permit Entry Into Mode 5 W/Operability of Diesel Generator a & Associated Load Sequencer Unverified ML20012D3681990-03-19019 March 1990 Forwards Proprietary & Nonproprietary Suppl 2 to WCAP-12218 & WCAP-12219, Supplementary Assessment of Leak-Before-Break for Pressurizer Surge Lines of Vogtle Units 1 & 2, Per 900226 Request.Proprietary Rept Withheld (Ref 10CFR2.790) ML20012D3401990-03-19019 March 1990 Submits Response to 891121 Request for Addl Info Re Settlement Monitoring Program.Current Surveying Procedures Used by Plant to Monitor Settlement of Major Structures Outlined in Procedure 84301-C.W/41 Oversize Drawings ML20012D6631990-03-15015 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in Lwrs.Overfill Protection Sys Sufficiently Separate from Control Portion of Main Feedwater Control Sys & Not Powered from Same Source ML20012C4681990-03-0606 March 1990 Provides Summary Rept of Property Damage Insurance Levels, Per 10CFR50.54(w)(1) ML20012B2891990-03-0606 March 1990 Forwards Plant Pipe Break Isometrics,Vols 1 & 2 & Advises That Encl Figures Have Been Revised to Be Consistent W/Pipe Analysis in Effect at Time That Unit 2 Received Ol,Including Revs Through 890930.W/309 Oversize Figures ML20012B2421990-03-0606 March 1990 Forwards Cycle 3 Radial Peaking Factor Limit Rept & Elevation Dependent Peaking Factor Vs Core Height Graph ML20011F5291990-02-26026 February 1990 Withdraws 881107 Proposed Amend to Tech Spec 3.8.1.1, Revising Action Requirements for Inoperable Diesel Generator to Clarify Acceptability of Air Roll Tests on Remaining Operable Diesel Generator ML20011F5261990-02-26026 February 1990 Forwards 1989 Annual Rept - Part 1. Part 2 Will Be Submitted by 900501 ML20011E8911990-02-12012 February 1990 Advises That Hh Butterworth No Longer Employed by Util 1990-09-06
[Table view] |
Text
oute 2. Bo 2 A Waynesboro. Georaia 3033a Telephone 404 554-9961. Ext 3360 404 724 8114, Ext. 3360 m
D. O. Foster Georgia Power V,ce President and Project eral k1ar ger the southern e:ecirc system November 7,1984 Director of Nuclear Reactor Regulation Attention: Ms. Elinor G. Adensam, Chief Licensing Branch #4 File: X8BE03 Division of Licensing Log: GN-439 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 FINAL NPDES PERMIT
Dear Mr. Denton:
By rqy letter of September 25,1984 (File X8BE03, Log: GN-422), Georgia Power Company provided a copy of the Draft National Pollutant Discharge Elimination System (NPDES) permit for the Yogtle Electric Generating Plant.
Attached please find a copy of the Final NPDES permit which was issued by the State of Georgia Environmental Protection Division. As noted in igy September .
25, 1984 letter, a copy of the final permit will be included in the Operating i License Stage Environmental Report in the next amendment of that document.
1 If you have any questions concerning the enclosed infonnation please contact us.
Yours very truly, D. .F er D0F/WLB/sro Attachments cc: M. A. Miller R. A. Thomas J. A. Bailey L. T. Gucwa G. F. Trowbridge, Esquire g8/
G. Bockhold, Jr.
J. E. Joiner j
}
L. Fowler C. A. Stangler 8411140261 841107 PDR ADOCK 05000424 A PDR
s~ . .
U
- S, pepartment of Natural e pesources ENVIRONMENTAL PROTECTION DIVislON 270 WASHINGTON STREET, s W ATLANTA. GEORGIA 30334 J. LEoNARO LEDBETTER September 10, 1984 Devis.on Director Mr. T. E. Byerley Manager of Environmental Affairs I?ECEI.'ID Georgia Power Company P. O. Box 4545 SE? 12 :E54 Atlanta, Georgia 30302 EPN. FfM Re: NPDES Permit No. GA 0026786 Vogtle Electric Generating Plant Gentlemen:
Pursuant to the Georgia Water Quality Control Act, as amended, the Federal Water Pollution Control Act, as amended, and the Rules and Regu-lations promulgated thereunder, we have today issued the attached National Pollutant Discharge Elimination System (NPDES) permit for the specified wastewater treatment facility.
Please be advised that on and af ter the effective dace indicated in the attached NPDES permit, the permittee must comply with all the terms, conditions and limitations of this permit.
Sincerely,
~
J. Leonard Ledbetter Director JLL:bk Enclosure AN AFFIRMATIVE ACTION / EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER
.c. ':
geMeeMeeMSM6MMMMAMAMAMafaMeaMeA&MfeeMeeM(G PERMIT NO. GA 0026786 G STATE OF GEORGIA -
DEPARTMENT OF NATURAL RESOURCES Id ENVIRONMENTAL PROTECTION DIVISION AUTHORIZATION TO DISCHARGE UNDER THE R
4 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM M W In compliance with the provisions of the Georgia Water Quality Control Act (Georgia a Laws 1964, p. 416, as amended), hereinafter called the " State Act," the Federal Water Q Pollution Control Act, as amended (33 U.S.C.1251 et seq.), hereinaiter called the " Federal Act," and the Rules and Regulations promulgated pursuant to each of these Acts, i GEORGIA POWER COMPANY P. O. Box 4545
"' E"2 c:d Atlanta, Georgia 30302 %
6 N
[ is authorized to discharge from a facility located at Vogtle Electric Generating Plant Waynesboro, Burke County, Georgia to receiving waters Savannah River '-
c:- in accordance with effluent limitations, monitoring requirements and other conditions set forth in Parts I, II, and Ill hereof.
ci This permit shall become effective on September 10, 1984. -
=3 d This permit and the authorization to discharge shall expire at midnight, August 31, 1989.
- signed this 10th day of September, 1984 ,
f ;~s 'h\\
,h li cAtg n
- GZd4%[ h u
g m
s ..,
e,_ rect 8r.
,,__ ,., P, o , .c . , _ .,s , _
g e=
PNNNNNNDPNNTNNNNNNNNNNNNNNN#NEN EPD 2.21 1
m . STATE OF GEORGI A -
DEPARTMENT OF NATUR AL RESOURCES
@ ' ENVIRONMENTAL PROTECTION DIVISION y "
h k A. EFFLUENT LIMITAIlONS AND MONITORING REQUIREMENTS
- 1. During the period beginning effective date and lasting through August 31, 1989, the permittee is authorized to discharge from outfall(s) serial number (s) 00lg- Cooling Tower Blowdown (001A1 and 001A2)
~
Such discharges shall be limited and monitored by the permittee as specified below:
Effluent Characteristic Discharge Limitations Monitoring Requirements -
l<g/ day (Ibs/ day) Other Units (Specify) q Measurement Sample Sample Daily Avg. Daily Max. Daily Avg. Daily Max. Frequency Type Location Flow-m3Day (MCD) - - - -
0.2 mg/l 0.5 mg/l 1/ Week Mul tiple. 3 *1 1
- Total Residual Chlorine - - - -
1/ Week Multiple '3 *1 Grabs Time of TRC Discharge - - -
120 minutes / 1/ Week Multiple *1 I
day per unit Grabs Total Chromium -
0.2 mg/l 1/ Quarter Grab
- Total Zinc - - -
1.0 mg/l 1/ Quarter Grab *4 The pH simil not be less than 6.0 standard units nor greater than 9.0 standard units and shall be monitored twice per month by grab sample at final discharge.
y O
eo >
There shall be ro discharge of floating solids or visible foam in other than trace amounts. 5,$ $
- 1 Monitored irmnediately following dechlorination system.
- 2 See Part III, Special Requirements, Item 7 pN
- 3 See Part III, Special Requirements, Item 4. o
- 4 Monitored prior to mixing with other waste streams. -
P c> ~
- 5 Effluent limitations for FAC and TRC refer to the average and maximum concentrations 8"
, during any individual chlorine release period.
- m The permittee shall certify yearly that no priority pollutant other than chromium or zinc is above detectable limits in this discharge. This certification may be based on manufacturer's certifications or engineering calculations.
m STATE OF GEbRGIA
$ DEPARTMENT OF NATURAL RESOURCES w ENVIRONMENTAL PROTECTION DIVISION .
b A,
.L During the peciod begiming effective date and lasting through August 31, 1989, the permittee is authorized to discharge from outfall(s) serial number (s) 00l g Low Volume Waste (Wastewater -
Retention Basin)
~
Such discharges shall be limited and monitored by the permittee as specified below:
Effluent Characteristic . Dischorne Limitations Monitorir.g Requirements -
kg/ day (Ibs/ day) Other Units (Specify) O (mg/l) Measurement Sample Sample *1 Daily Avg. Daily Max. Daily Avg. Daily Max. Frequency Type Location Flow-m 3Day (MGD) - - - -
- 2 *2 *2 Total Suspended Solids - -
30 100 2/ Month Grab Discharge Line Oil & Grease - -
15 20 2/Morith Grab Discharge Line The pH shall not be less than 6.0 standard units nor greater than 9.0 standard q units and shall be monitored twice per month by grab sample at final discharge.
There shall be m discharge of floating solids or visible foam in other than trace amounts. 22 3 3$ I
- 2 See Part III, Special Requirements, item 7. g" m
8*
St u
m
rn STATE OF GEORGIA 3 DEPARTMENT OF NATURAL RESOURCES w ENVIRONMENTAL PROTECTION DIVISION b
During the pe.iod beginning effective date and lasting through August 31, 1989, the permittee is authorized to discharge from outfall(s) serial number (s) 00185 - Sewage Treatment Plant -
Such discharges shall be limited and monitored by the permittee os specified below:
1 Effluent Chorocteristic Discharge Limitations Monitoring Requirements ~
kg/ day (Ibs/ day) Other Units (Specify) 9 (mg/l) Measurement Sample Sample *1 Daily Avg. Daily Max. Daily Avg. Daily Max. Frequency Type Location Flow-m3Doy (MCD) - - - -
30 45 Quarterly Grab Discharge Line 5
The pH shall not be less than 6.0 standard units nor greater than 9.0 standard q units and shall be monitored twice per month by grab sample at final discharge.
There shall be rn discharge of floating solids or visible focm in other than trace amounts. 22 j U$ %
- 1 Prior to mixing with any other waste stream. -
[
- 2 See Part III, Special Requirements, item 7
" ~
8*
a m
L l
m STATE OF GEORGIA
! 3 DEPARTMENT OF NATURAL RESOURCES w ENVIRONMENTAL PROTECTION DIVISION b
h
.L During the period beginning effective date md lasting through August 31, 1989, the permittee is authorized to discharge from outfall(s) serial number (s) 001 L w Volume Waste (Liquid 87 Radwaste System) -
Such discharges stoll be limited and monitored by the permittee as specified below:
Effluent Chorocteristic Discharge Limitations Monitoring Requirements '
kg/ day (Ibs/ day) Other Units (Specify) O (mg/l) Measurement Sompte Sample *1 Daily Avg. Daily Max. Daily Avg. Daily Max. Frequency Type Location Flow-m 3Day (MGD) - - - -
- 2 *2 *2 Total Suspended Solids - -
30 100 2/ Month Gra b Discharge Line Oil & Grease - -
15 20 2/ Month Grab Discharge Line The pH shall not be less than 6.0 standard units rur greater than 9.0 standard units and shall be monitored twice per month by grab sample.
q There sloll be rn discharge of floating solids or visible foam in other finn trace amounts. 22 [
- 1 Prior to mixing with other waste streams. 5$-
D
- 2 See Part III, Special Requirements, item 7 *
[
cn 1 2" ,_.
8 *-
s o,
. .C C STATE OF GEORGI A PARTI DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION Page 6 of 14 Permit No. GA 0026786 B. SCHEDULE OF COMPLI ANCE I. The permittee shall achieve compliance with the effluent limitations specified for discharges in accordance with the following schedule:
N/A
- 2. No later than 14 calendar days following a date identified in the above schedule of compliance, the permittee shall submit either a report of progress or, in the case of specific actions being required by identified dates, a written notice of compliance or noncompliance. In the latter case, the notice shall include the cause of noncompliance, any remedial actions taken, and the probability of meeting the next scheduled requirement.
4 EPO 2.21-4-1
, ( (
STATE OF GEORGI A PARTI DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION Page 7 of 14 Permit No. GA 0026786 Note: EPD as used herein means the Division of Environmental Protection of .
the Department of Natural Resources. I l
C. MONITORING AND REPORTING
- l. Representative Sampling Somptes and measurements taken as required herein shall be representative of the volume md nature of the monitored discharge.
- 2. Reporting Monitoring results obtained during the previous 3 months shall be summarized for each month and reported on an Operation Monitoring Report (Form WO l.45), postmarked no later than the 21st. day of the month following the completed reporting period. The first report is due on December 21, 1984 The EPD may require reporting of additional monitoring results by written notification. Signed copies of these, and all other reports required herein, shall be submitted to the following oddress:
Georgia Environmental Protection Division Water Quality Control Section - Industrial wastewater Program 270 Washington Street, S.W.
Atlanto, Georgia 30334
- 3. Definitions
- a. The " doily overage" discharge means the total discharge by weight during a coiendar month divided by the number of days in the month that the production or commercial facility was operating.
Where less than daily sampling is required by this permit, the daily overage discharge shall be determined by the summotion of oil the measured daily discharges by weight divided by the number of days sampled during the calendar mmth when the measurements were made.
! b. The " daily maximum" discharge means the total discharge by weight during my calendar cby.
- c. The " doily overage" concentration means the crithmetic average (weighted by flow value) of all the daily determinations of concentration made during a calendor month. Daily determinations of concentration mode using a composite sample shall be the concentration of the composite sample. When grab samples are used, the daily determination of concentration shall be the crithmetic overage (weighted by flow value) of all the sample collected during that calendar day.
EPO 2.21-S-1
. . - . . _ . .- - . = _ . .
r
- . . .(
STATE OF GEORGI A PARTI DEPARTMENT OF NATURAL RESOURCES
- ENVIRONMENTAL PROTECTION DIVISION Page 8 of 14
. Permit No. GA 0026786
- d. The " doily maximum" concentration means the daily determination of concentration for any calendor day.
- e. " Weighted by flow value" means the summation of each somple concentration times its respective flow in convenient units divided by the sum of the respective flows.
- f. . For the purpose of this permit, a calendor day is defined as any
. consecutive 24-hour period.
- 4. Teit Procedures
. Test procedures for the analysis of pollutants shall conform to regu-lations published pursuont to Section 304(g)of the Federal Act.
- 5. Recording of Results For each measurement or sample taken pursuant to the requirements of this permit, the permittee shall record the following information:
- a. The exact place, date, and time of sampling;
- b. The dates the analyses 'were performed;
- c. The person (s) who performed the analyses;
- d. The analytical techniques or methods used; and
- e. . The results of all required analyses.
- 6. Additional Monitoring by Permittee If the permittee monitors any pollutant at the location (s) designated herein more. frequently than required by this permit, using opproved analytical methods as specified above, the results of such monitoring shall be included in the calculation and reporting of the values required in the Operation Monitoring Report Form (WO l.45). Such increased monitoring frequency shall also be indicated. The EPO may require more frequent monitoring or the monitoring of other pollutants not required in this permit by written notification.
- 7. Records Retention
! All records and information resulting from the monitoring activities
! required by this permit including all records of analyses performed and calibration and maintenance of instrumentation and recordings from
! continuous monitoring instrurnentation shall be retained by the i; permittee for a minimum of three (3) years, or Icnger if requested by the State Environmental Protection Division.
l l
ElO 2.21-6-l
'. . .C C S1 ATE OF GEORGI A PARTll DtiPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION Page 9 of 14
. Permit No. GA 0026786 A. MANAGEMENT REQUIREMENTS
- 1. Change in Discharge All discharges authorized herein shall be consistent with the terms md conditions of this permit. The discharge of any pollutant identified in this permit more frequeny than or at a level in excess of that authorized shall constitute _ s'olation of the permit. Any anticipated facility expansions, production increases, or process modifications which will result in new, different, or increased discharges or pollutants must be reported by submission of a new NPDES application or, if such changes will not violate the effluent limitations specified in this permit, by notice to the EPO of such changes. Following such notice, the permit may be modified to specify and limit any pollutants not previously limited.
- 2. Noncompliance Notification i
L If, for any reason, the permittee does not comply with or will be unable to comply with any daily maximum effluent limitation specified in this permit, the permittee shall provide the Water Quality Control Section of EPD with the following'information, in writing, within five (5) days of becoming aware of such condition:
- a. A description of the discharge md cause of noncompliance; and
- b. The period of noncompliance, including exact cbtes and times; or, if not correc ted, the anticipated time the noncompliance is expected to continue, and steps being token to reduce, eliminate and prevent recurrence of the noncomplying discharge.
- 3. Facilities Operation The permittee shall at all times maintain in good working order and operate as ef ficientiv as possible all treatment or control facilities or systems installed or used by the permittee to achieve compliance with the terms and conditions of this permit.
- 4. Adverse Impact The permittee shall take all reasonable steps to minimize any adverse impact to navigable waters resulting from noncompliance with any effluent limitations specified in this per mit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge.
EPD 2.21-7
_ _(
(
STATE OF GEORCI A PART11 DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION Page 10 of 14 Permit No. GA 0026786 S. Bypassing Any diversion from or bypass of facilities covered by this permit is prohibited, except (i) where unavoidable to prevent loss of life or severe property damage, or (ii) where excessive storm drainage, runoff, or infiltration would damage any facilities necessary for compliance with the effluent limitations md prohibitions of this permit. The permittee shall operate tne treatment works, including the treatment plant and total sewer system, to minimize discharge of the pollutants listed in Part i of this permit from combined sewer overflows or bypasses. The permittee shall monitor all overflows and bypasses in the sewer and treatment system. A record of each overflow and bypass shall be kept with information on the location, cause, duration, and peak flow rate.
Upon written notification by EPD, the permittee may be required to submit a plan and schedule for reducing bypasses, overflows, and infiltration in the system.
- 6. Removed Substances Solids, sludges, filter backwash, or other pollutants removed in the '
course of treatment or control of wastewaters shall be disposed of in a manner such as to prevent any pollutant from such materials from entering waters of the State.
- 7. Power Failures In order to maintain compliance with the effluent limitations md pro-hibitions of this permit, the permittee shall either:
- a. In accordance with the Schedule of Compliance contained in Part I, provide on alternative power source suf ficient to operate the wastewater control facilities; or, if such alternative power source is not in existence, and no date for its implementation appears in Part 1,
- b. Holt, reduce or otherwise control production md/or all discharges from wastewater control facilities upon the reduction, loss, or failure of the primary source of power to said wastewater control facilities.
B. RESPONSIBILITIES
- 1. Right of Entry The permittee shall allow the Director of EPD, the Regional Admini-strator of EPA, and/or their authorized representatives, agents, or employees, upon the presentation of credentials:
- a. To enter upon the permittee's premises where an effluent source is located or in which any records are required to be kept under the terms and conditions of this permit; and EPD 2.21-8
(
,. ,(
STATE 01 GEORGIA PART11 DEPARTMENT OF NATURAL RESOURCES
!!NVIRONMENTAL PROTECTION DIVISION Page 11 of 14 Permit No. GA 0026786
- b. At reasonable times to have access to and copy any records required to be kept under the terms and conditions of this permit; to inspect any monitoring equipment or monitoring method required in this pe.mit; and to sample any discharge of pollutants.
- 2. Transfer of Ownership or Control in the event of any change in control or ownership of facilities from which the authorized discharges emanate, the permittee shall notify the succeeding owner or controller of the existence of this permit by letter, a copy of which shall be forwarded to the Water Quality Control Section of EPD.
- 3. Availability of Reports Except for data determined by the Director of EPD to be confidential under Section 16 of the State Act or the Regional Administrator of the U.S. Environmental Protection Agency under Section 308 of the Federal Act, all reports prepared in accordance with the terms of this permit shall be aviolable for public inspection at the Atlanta office of the EPD.
Effluent data shall not be considered confidential. Knowingly rnaking any false statement on any such report may result in the imposition of criminal penalties as provided for in Section 22(b) of the S+ te Act.
- 4. Permit Modification After written notice and opportunity for a hearing, this permit may be modified, suspended, revoked or reissued in whole or in part during its term for cause including, but not limited to, the following:
- a. Violation of any conditions of this permit;
- b. Obtaining this permit by misrepresentation or failure to disclose fully all relevant facts;
- c. A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge; or f.
- d. To comply with any applicable effluent limitation issued pursuant to the order the United States District Court for the District of Columbia issued on June 8,1976, in Natural Resources Defense Council. Inc. et.al. v. Russell E. Train, 8 ERC 2120 (D.D.C. IN),
if the effluent limitation so issued:
(l) is different in conditions or more stringent than any effluent limitation in the permit; or (2) controls any pollutant not limited in the permit.
EPD 2.21-9
.- STATE OF.CEOR,C( (ART 11 DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTlON DIVISION Page 12 of 14 Permit No. GA 0026786
- 5. Toxic Pollutants Notwithstanding Port II, B-4 above, if a toxic effluent standard or pro-hibition (including any schedule of compliance specified in such ef fluent standard or prohibition) is established under Section 307(a) of the Federal Act for a toxic pollutant which is present in the discharge and such standard or prohibition is more stringent than any limitation for such pollutant in this permit, this permit shall be revised or modified in occordance with the toxic effluent standard or prohibition. A draf t permit will be provided for review and comments prior to issuance.
- 6. Civil and Criminal Liability Nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance.
- 7. State Laws Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any ap9licable State low or regulation under authority preserved by Section 510 of the Federal Act.
- 8. Water Quality Standards Nothing in this permit shall be construed to preclude the modification of any condition of this permit when it is determined that the effluent limitations specified herein fail to achieve the opplicable State water quality standards.
- 9. Prcperty Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regu-lations.
- 10. Expiration of Permit Permittee shall not discharge offer the expiration date. In order to receive authorization to discharge beyond the expiration date, the permittee shall submit such information, forms, and fees os are required by the agency authorized to issue permits no later than 180 days prior to the expiration date.
I1. Contested Hearings Any person who is oggrieved or adversely offected by any oction of the Director of EPO shall petition the Director for a hearing within thirty (30) days of notice of such oction.
EPD 2.21-10
'.. . .C C STATE OF GEORGIA PART II DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION Page 13 of 14 Permit No. GA 0026786
- 12. Severability The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.
- 13. Best Available Technology Economically Achievable Notwithstanding Part II, B-4 above, if an applicable effluent standard or prohibition (including any schedule of compliance specified in such.
effluent standard or prohibition) is established under Section 301(b)2 of the Federal Act for a pollutant which is present in the discharge and such standard or prohibition is more stringent than any limitation for such pollutant in this permit, this permit shall be revised or modified in accordance with such effluent standard or prohibition.
A draft permit will be provided for review and comments prior to issuance.
- 14. The permittee will implement best management practices to control the discharge of hazardous and/or toxic materials from ancillary manufacturing activities. Such activities include, but are not limited to, materials storage areas; in-plant transfer, process and material handling areas; loading and unloading operations; plant site runoff; and sludge and waste disposal areas.
PART III A. PREVIOUS PERMITS
- 1. All previous State water quality permits issued to this facility, whether for construction or operation, are hereby revoked by the issuance of this permit. This action is taken to assure compliance with the Georgia Water Quality Control Act, as amended, and the Federal Water Pollution Control Act, as amended. Receipt of the permit constitutes notice of such action. The conditions, require-ments, terms and provisions of this permit authorizing discharge under the National Pollutant Discharge Elimination System govern
' discharges from this facility.
rPO ?.?1-11
- )~
STATE OF GEORGIA DEPARTMENT DF N'AT RAL RESOURCES
( PART III ENVIRONMENTAL PROTECTION DIVISION Page 14 of 14 Permit No. GA 0026786 B. SPECIAL REQUIREMENTS
- 1. There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer fluid.
- 2. Any metal cleaning wastes generated will be contained for further treatment or disposal-in a manner to permit compliance at time of discharge with requirements listed belrw. This applies to any pre-operational chemical cleaning of metal process equipment also.
- 3. The quantity of pollutants discharged in metal cleaning waste shall not exceed the quantity determined by multiplying the flow of metal cleaning wastes times the concentrations listed below.
The pH is to be in the range of 6.0 to 9.0 standard units.
Effluent Characteristic Discharge Limitation (mg/1) l Daily Average Daily Maximum Total suspended solids 30 100 Oil and grease 15 20 i Copper 1.0 1.0 I Iron 1.0 1.0 i
Each discharge shall be sampled by composite consisting of three or more grab samples, one of which will be collected immediately after the start of discharge, one immediately prior to termination of discharge, and one or more between these two. Results shall be reported monthly by the 21st day of the following calendar month.
4 Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than two hours in any one day as monitored immediately following the dechlorination facilities.
- 5. In the event that waste streams from various sources are combined for treatment of discharge, the quantity of each pollutant or pollutant property controlled by this permit shall not exceed the specified limitations for that source except that the limitations for free available chlorine and total residual chlorine discharges from cooling tower blowdown shall apply following the dechlorination system as noted in Item 4 above.
- 6. The Director may modify any effluent limitation upon request of the permittee if such limitation is covered by an approved variance or by an amendment to the Federal Water Pollution Control Act.
- 7. The permittee shall determine the flow of the various waste streams and submit this determination to the Director once every two years.
_ _ _ _ _ _ _ _ _ - _ _ - - - - - - _