|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:UTILITY
MONTHYEARIR 05000302/19900301990-11-17017 November 1990 Insp Rept 50-302/90-30 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Annual Emergency Exercise IR 05000302/19900291990-10-31031 October 1990 Insp Rept 50-302/90-29 on 900908-1005.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Facility Mods & Licensee Action on Previous Insp Items ML20058B0891990-10-17017 October 1990 Insp Rept 50-302/90-32 on 900918-1005.Violations Noted. Major Areas Inspected:Events Resulting in Breach of Reactor Bldg Containment & Lack of Leak Integrity of Encapsulation Assembly Providing Secondary Boundary to Decay Heat Sys IR 05000302/19900311990-10-10010 October 1990 Insp Rept 50-302/90-31 on 900917-20.No Violation Noted.Major Areas Inspected:Verification That Corrective Actions for Previous Findings Adequate IR 05000302/19900251990-09-24024 September 1990 Partially Withheld Insp Rept 50-302/90-25 on 900812-17 (Ref 10CFR2.790(d) & 73.21).One Unresolved Item Identified.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Programs,Organization & Audits IR 05000302/19900241990-08-31031 August 1990 Insp Rept 50-302/90-24 on 900707-0810.Violation Noted.Major Areas Inspected:Plant Operations,Security,Radioligical Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19900211990-07-27027 July 1990 Insp Rept 50-302/90-21 on 900602-0706.No Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19900171990-07-10010 July 1990 Insp Rept 50-302/90-17 on 900501-03.Noncited Violations Noted.Major Areas Inspected:Fitness for Duty Program as Required by 10CFR26,including Licensee Drug & Alcohol Abuse Policies,Training,Chemical Testing,Appeals & Repts & Audits IR 05000302/19900221990-07-0606 July 1990 Insp Repts 50-302/90-22 on 900612-16.Violations Noted But Not Cited.Major Areas Inspected:Review & Witnessing of Integrated Engineered Safeguards & Loss of Offsite Power Tests IR 05000302/19890241989-09-15015 September 1989 Insp Rept 50-302/89-24 on 890907-08.Violations Noted.Major Areas Inspected:Review of Events Resulting in Unplanned Shutdown of Facility IR 05000302/19890191989-08-31031 August 1989 Insp Rept 50-302/89-19 on 890708-0804.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Security,Fire Protection,Surveillance Observation,Maint Observation,Safety Sys Walkdown & LERs IR 05000302/19890211989-08-25025 August 1989 Insp Rept 50-302/89-21 on 890808.No Violations or Deviations Noted.Major Areas Inspected:Observation & Analysis of Ultrasonic Exam Capabilities for Opposite Surface Initiating Flaws in Various Matls Involved Re Stated Welds IR 05000302/19890181989-08-16016 August 1989 Insp Rept 50-302/89-18 on 890710-14.Violations Noted.Major Areas Inspected:Inservice Testing & Followup on Previous Insp Findings ML20245K2961989-08-10010 August 1989 Insp Rept 50-302/89-17 on 890619-20.Violations Noted.Major Areas Inspected:Followup to Events Surrounding 890616 Loss of off-site Power transient-review of Plant & Operator Response to Transient,Root Cause & Corrective Actions ML20245J0581989-08-0404 August 1989 Insp Rept 50-302/89-200 on 890424-0505.Weaknesses Noted. Major Areas Inspected:Implementation of Licensee Vendor Interface Program & Program for Procurement of Items for Use in safety-related Applications IR 05000302/19890121989-08-0101 August 1989 Insp Rept 50-302/89-12 on 890620-23.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Exercise,Emergency Operations Facility & Emergency News Ctr.One Weakness Noted IR 05000302/19890161989-08-0101 August 1989 Partially Withheld Insp Rept 50-302/89-16 on 890625-30 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected: Mgt Support,Security Program Plans & Audits,Detection & Assessment Aids & Packages & Vehicles ML20245K0421989-08-0101 August 1989 Insp Rept 50-302/89-15 on 890603-0707.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods,Onsite Events & Annual Emergency Drill ML20246E4491989-06-28028 June 1989 Insp Rept 50-302/89-11 on 890429-0602.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods,Review of IE Info Notices & Followup of Onsite Events ML20246K7561989-06-27027 June 1989 Insp Rept 50-302/89-14 on 890531-0602.Violations Noted.Major Areas inspected:890529 Event Involving Emergency Feedwater Piping & Containment Penetration Heated Above Design Limits & Unanalyzed Thermal Stresses Imposed on Steam Generator IR 05000302/19890131989-06-23023 June 1989 Insp Rept 50-302/89-13 on 890529-0602.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Radwaste Mgt,Transportation of Radioactive Matls & Followup on Previous Inspector Identified Items ML20244D2831989-06-0707 June 1989 Insp Rept 50-302/89-09 on 890424-28.Violations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment & Followup on Previous Insp Findings,Including Review of Util Implementation of 10CFR50.49 Program IR 05000302/19890101989-06-0707 June 1989 Insp Rept 50-302/89-10 on 890515-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Corrective Actions from Previous Findings Re Training & Emergency Operating Procedures IR 05000302/19890081989-05-10010 May 1989 Insp Rept 50-302/89-08 on 890401-28.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Nonconforming Operations Repts,Facility Mods & Followup of Onsite Events IR 05000302/19890061989-04-25025 April 1989 Insp Rept 50-302/89-06 on 890225-0331.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mod, Review of 10CFR21 Repts & Followup of Onsite Events IR 05000302/19890041989-04-0505 April 1989 Insp Rept 50-302/89-04 on 890227-0303.No Violations or Deviations Noted.Major Areas inspected:post-accident Sampling Sys,Confirmatory Measurements,Radiological Effluents & Reactor Coolant Chemistry IR 05000302/19890051989-03-24024 March 1989 Insp Rept 50-302/89-05 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Radiological Emergency Response Plan & Implementing Procedures & Emergency Facilities IR 05000302/19890031989-03-24024 March 1989 Insp Rept 50-302/89-03 on 890128-0224.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Lers & Nonconforming Operations Rept,Facility Mods & Licensee Actions on Insp IR 05000302/19890021989-02-27027 February 1989 Insp Rept 50-302/89-02 on 890130-31.No Violations Noted. Major Areas Inspected:Reactor Coolant Pump Vibration Monitoring Sys Data Acquisition,Interpretation & Written Instructions for Protective Measures in Event of Failure ML20235P0571989-02-16016 February 1989 Insp Rept 50-302/89-01 on 890101-27.Three Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler & Nonconforming Operations Repts,Followup on Onsite Events & Licensee Action on Previous Insp Items IR 05000302/19880321988-11-30030 November 1988 Insp Rept 50-302/88-32 on 881031-1102.No Violations or Deviations Identified.Major Areas Inspected:Followup on Allegations IR 05000302/19880291988-11-21021 November 1988 Insp Rept 50-302/88-29 on 880916-1021.Violations Noted.Major Areas Inspected:Plant Operations,Security Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Review of Plant Review Committee IR 05000302/19880281988-11-0202 November 1988 Partially Withheld Insp Rept 50-302/88-28 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program,Security Program Audit & Testing & Maint IR 05000302/19880271988-10-0707 October 1988 Insp Rept 50-302/88-27 on 880829-0902.Violations Noted. Major Areas Inspected:Previously Identified Environ Qualification Deficiencies Documented on Justification for Continue Operation.Licensee Commitment Identified ML20204J8041988-10-0404 October 1988 Insp Rept 50-302/88-26 on 880813-0916.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19880251988-09-20020 September 1988 Insp Rept 50-302/88-25 on 880822-26.No Violations or Deviations Noted.Major Areas Inspected:Mods & Design Control ML20155A9181988-09-13013 September 1988 Insp Rept 50-302/88-24 on 880716-0812.Violations Noted.Major Areas Inspected:Plant Operation,Security,Radiological Controls,Lers & Nonconforming Operation Repts IR 05000302/19880201988-09-0707 September 1988 Insp Rept 50-302/88-20 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Complex Surveillance Testing & IE Bulletin Followup IR 05000302/19880221988-08-12012 August 1988 Insp Rept 50-302/88-22 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Organization & Mgt Control ML20151X0061988-08-0505 August 1988 Insp Rept 50-302/88-18 on 880609-0715.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Security,Lers,Nonconforming Operations Repts, Review of Bulletins & Actions on Insp Items IR 05000302/19880211988-08-0505 August 1988 Insp Rept 50-302/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry, Corrosion Control & Pipe Thinning IR 05000302/19880191988-07-28028 July 1988 Insp Rept 50-302/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97 ML20151K2941988-07-20020 July 1988 Insp Rept 50-302/88-15 on 880607-09.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Key Emergency & Organizational Functions & Locations During Partial Participation Exercise ML20151D9521988-07-0707 July 1988 Insp Rept 50-302/88-16 on 880512-0608.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Lers,Security & Nonconforming Operations Repts IR 05000302/19880171988-06-10010 June 1988 Insp Rept 50-302/88-17 on 880523-27.No Violations Noted. Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Security Sys Power Supply,Lighting,Assessment Aids & Alarm Stations ML20196B1251988-06-0606 June 1988 Insp Rept 50-302/88-14 on 880416-0611.Violation & Deviation Noted.Major Areas Inspected:Plant Operations,Security, Radiological Controls,Lers & Nonconforming Operations Repts & Review of NRC Bulletins & Circulars IR 05000302/19880091988-06-0606 June 1988 Insp Rept 50-302/88-09 on 880328-0408.Numerous Deficiencies Noted.Major Areas Inspected:Review of Adequacy of Emergency Operating Procedures IR 05000302/19880121988-05-19019 May 1988 Insp Rept 50-302/88-12 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Review of Previously Identified Inspector Followup Items & Enforcement Matters, External Exposure Control & Control of Radioactive Matl IR 05000302/19880131988-05-12012 May 1988 Insp Rept 50-302/88-13 on 880418-22.No Violations Noted. Major Areas Inspected:Seismic Monitoring Program,Fire Protection/Prevention Program,Followup on Previously Identified Insp Items & LERs IR 05000302/19880111988-05-0202 May 1988 Insp Rept 50-302/88-11 on 880312-0415.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler & Noncomforming Operations Repts,Refueling Activities & Licensee Actions on Previous Items 1990-09-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist ML20199D6161999-01-0404 January 1999 Notice of Violation from Insp on 981025-1205.Violation Noted:Its Requirements for Valve Position Verifications Not Met as Evidenced by Listed Examples IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19983011998-07-31031 July 1998 NRC Operator Licensing Exam Rept 50-302/98-301,including Completed & Graded Tests,For Tests Administered on 980629-0702 IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20249A2941998-06-0808 June 1998 Notice of Violation from Insp on 980322-0509.Violation Noted:As of 980423,licensee Had Not Complied W/Requirements of Procedure CP-111,in That,Only Two of Discrepancies Identified in Ioc NL97-0262,had Been Documented IR 05000302/19980991998-06-0404 June 1998 SALP Rept 50-302/98-99 for 961006-980509 ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8871998-04-0808 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:On 980220,Axial Power Imbalance Alarm Was Inoperable for Approx 3.5 Hours & Axial Power Imbalance Was Not Verified to Be within Acceptable Operating Limits ML20248L6171998-03-16016 March 1998 Notice of Violations from Insp on 980126-30.Violations Noted:Test Program for ECCS Operating in Piggyback Mode Did Not Demonstrate That Sys Would Perform Satisfactorily in Service IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216E9291998-03-0404 March 1998 Notice of Violation from Insp on 980104-0207.Violations Noted:On 980203 Licensee Failed to Accomplish Required Posting of Bulletin Boards ML20203F5561998-02-23023 February 1998 Notice of Violation from Insp on 971021-24,1208-12 & 980105-09.Violations Noted:Implementation of Validation Program Did Not Adequately Demonstrate Usability of Emergency Procedures ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 9802051998-02-0202 February 1998 PNO-II-98-005:on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 PNO-II-98-004, on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License1998-01-30030 January 1998 PNO-II-98-004:on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release1998-01-22022 January 1998 PNO-II-98-003:on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release ML20199G6761998-01-16016 January 1998 Notice of Violation from Insp on 971201-16.Violation Noted: as of 971211,licensee Health Physics Supervisors Failed to Identify & Correct Personnel Contamination Repts That Were Not Completed IAW Requirements of Procedure HPP-104 ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N6211997-12-29029 December 1997 Notice of Violation from Insp on 971026-1129.Violation Noted:On 971105,licensee Failed to Perform Adequate Se,Per 10CFR50.59 for Functional Test Procedure for B Emergency Diesel Generator Power Upgrade & Radiator Replacement Mods ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20199A2091997-12-22022 December 1997 EN-97-116:on 971229,informs Commission That Staff Intends to Exercise Enforcement Discretion in Accordance W/Section VII.B.2 of Enforcement Policy & Not Issue NOV or Proposed Imposition of Civil Penalty to Util for Violations PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified1997-12-19019 December 1997 PNO-II-97-063:on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified IR 05000302/19973011997-12-17017 December 1997 NRC Operator Licensing Exam Rept 50-302/97-301 Including Completed & Graded Test for Test Administered on 971118. Exam Results:Sro Candidate Passed Written Exam ML20203A1911997-12-0404 December 1997 Notice of Violation from Insp on 971006-24.Violation Noted:Work Request Numbers 333797 & 333798,issued in Mar 1997 to Install Stem Protectors on Actuators Were Closed W/O Performing Work ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20202D7301997-11-24024 November 1997 Notice of Violation from Insp on 970921-1025.Violation noted:10CFR50.59 SE Had Not Been Performed as Required within 90 Days on Wds Piping non-conforming Condition IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-97-059, on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities1997-11-18018 November 1997 PNO-II-97-059:on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities ML20212B9061997-10-16016 October 1997 Notice of Violation from Insp on 970817-0920.Violations Noted:Scaffolding Control Program Does Not Contain Measures to Assure That Deviations from Design Quality Std for safety-related Equipment Installed Have Adequate Control IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211Q2581997-10-14014 October 1997 Notice of Violation from Insp on 970922-26.Violation Noted:On 970820,individual Was Terminated & Authorized Access Was Not Removed from Plant Security Computer Until 970905 ML20211E4891997-09-12012 September 1997 Notice of Violation from Insp on 970713-0816.Violations Noted:On 970728,licensee Personnel Performed quality-related Work to Restore once-through SGs During Reduced RCS Inventory Operation Without Written & Approved Procedure ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support 1999-09-13
[Table view] |
Text
r
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Report No.: 50-302/85-09 Docket No.: 50-302 License No.: DPR-72 Licensee: Florida Power Corporation Post Office Box 14012 St. Petersburg, Florida 33733 Facility Name: Crystal River Unit 3 Inspection At: Crystal River, Florida Inspection Conducted: March 4-8, 1985 Inspector: h1 -
R. C. Wi' son, Equipment Qualification & Test Engineer 0[8F Date Also participating in the inspection and contributing to the report were:
U. Potapovs, Chief, Equipment Qualification Inspection Section, I&E H. C. Garg, Engineer, NRR R. O. Karsch, Reactor Engineer, NRR L. D. Bustard, Member of Technical Staff, Sandia National Laboratories M. W. Yost, Consultant Engineer, Idaho National Engineering Laboratory L. E. Foster, Reactor Inspector, RII N. Merriweather, Reactor Inspector, RII Approved by: F Gar (SJ ZecWief, Vendor Program Branch, I&F Date g612gM05
A 3 850610 302
INSPECTION SUMMARY:
Inspection on March 4-8, 1985 (Inspection Report No. 50-302/85-09)
Areas Inspected: Special, announced inspection to review the licensee's implementation of a program per the requirements of 10 CFR 50.49 for establish-ing and maintaining the qualification of equipment within the scope of 10 CFR 50.49. The inspection also included evaluations of the implementation of equipment qualification (EQ) corrective action commitments made as a result of deficiencies identified in the January 11, 1983, Safety Evaluation Report (SER)
and the October 1,1982, Franklin Research Center (FRC) Technical Evaluation Report (TER). The inspection involved 227 inspector hours onsit Results: The licensee stated that he plans to complete implementation of his program for meeting the requirements of 10 CFR 50.49 by the end of the refueling outage that began March 9, 1985. Since the outage is only the second since March 31, 1982, the licensee's implementation schedule is acceptable under paragraph (g) of 10 CFR 50.49. The inspection determined that considerable progress has been acade toward completing that plan, but a substantial amount of work must be performed before restart. The Qualification Documentation Files generally were deficient because they lacked some necessary information, although much of that information was provided during the inspection in response to questions. Qualification of several components has not yet been established pending resolution of additional concerns detailed in paragraph 4.D of this report, but no equipment was found to be not qualified. The Qualification Maintenance Program Manual was found to be generally satisfactory, but only one of the implementing procedures was in effect. The Haster List was found to be adequate. Eight Open Items were identified that must be completed before restar No deficiencies were found in the licensee's implementation of corrective action commitments as a result of SER/TER identified deficiencie The eight Open Items identified by the inspectors are as follows:
Name Report Paragraph Item Number Correction of Qualification Documentation Files 4.A.(1) 50-302/85-09-01 Qualification Maintenance Program Manual Review 4.A.(2).(a) 50-302/85-09-02 Revision of Plant Procedures 4.A.(2).(c) 50-302/85-09-03 Implementation of EQ Procedures During
'
Refuel V 4.A.(2).(c) 50-302/85-09-04 Training Implementation 4.A.(2).(c) 50-302/85-09-05 EQ Maintenance Procedures 4.A.(4) 50-302/85-09-06 u
-
Name Report Paragraph Item Number-
'
7.' : Required Operating. Time 4.D.(11) 50-302/85-09-07 ins / Bulletins 4. E ' 50-302/85-09-08
,
'.
i
2
_ __
-
.
Details PERSONS CONTACTED:
1.1 Florida Power Corporation (FPC):
'*W. S.Wilgus, Vice President, Nucle'ar Operations
- S. Rossfeld, Nuclear Compliance Manager
- E. C. Simpson, Directos Nuclear Ops. Engrg. and Licensing
- G. W. Castleberry, Manager Nuclear Engineering Projects
- L. B. Tiscione, Supervisor, Procurement, Site Nuclear Engr *J. E. Colby, Manager, Site Nuclear Engineering
- J. A. Frijouf, Site Nuclear Compliance Specialist
- G. R. Westafer, Manager, Licensing and Fuels
- A. E. Friend, Nuclear Staff Engineer
- K. R. Wilson, Supervisor, Site Nuclear Licensing
- D.(H. Orban, EQ Specialist, Procurement
- B.'L. Serrano, EQ Engineer, Procurement
- C. Nusbickel, Electrical Procurement Engineer
- K. Lancaster, Site Nuclear Quality Assurance Manager
- T.'Telford, Direc, tor, Quality Program Department
- G. L. Boldt, Plant Operations Manager
- P. F. McKee, Plant Manager
- V. Roppel, Manager, Plant Engineering and Technical Services
- H. Koon, Assistant Maintenance Superintendent W. M. Johnson, EQ Modification Specialist D. H. Smith, Maintenance Superintendent D. J. Adler, EQ Specialist W. A. Clemons, Compliance Specialist A._i. Gelston, Nuc. Elect./I&C Engineering Supervisor B. E. Crane, Plant Engineering Superintendent 1.2 FPC Contractors
'*L. A. Gilbert, Manager, Information Systems, NUS Corporation R. J. Steinberg, Engineer, NUS Corporation 1. 3 : Nuclear Regulatory Commission
- R. H. Vollmer, Deputy Director, Office of Inspection and Enforcement
, *B. K. Grimes, Director, Division of Quality Assurance, Vendor, and
'
Technical Training Center Programs
- A. R. Herdt, Chief, Engineering Branch, Region II
"
- T. F. Stetka, Senior Resident Inspector
- J. E. Tedrow, Resident Inspector
" Denotes those present at the exit interview at Crystal River on March 8, 198 _ __
-__
M i
..
-
\
,
' .
, PURPOSE: a !
J Tne purpose of'this $nspection was to review the licensee's implementation of the reqJirements of 10 CFR 50.49 and the implementation of committed corrective ' actions for SER/TER " identified deficiencie .i ; , BxCKGROUND~
On December 15, 1983, the NRC held a meeting with FPC officials to discuss FPC proposed methods to resclve the EQ deficiencies identified in the
-
January 11, 1983, SER and October 1, 1982, FRC TER. Discussions also included FPC's general methodology for compliance with 10 CFR 50.49 and justification for continued operation for those equipment items for which environmental qualification was not completed. The minutes of the meeting and proposed method of resolution for each of the EQ deficiencies were documented in January 31 and May 31, 1984, submittals from the license The TER and January 31 and May 31 submittals were reviewed by the inspection team members and were used to establish a status baseline for the inspectio . FINDINGS EQ Program Compliance with 10 CFR 50.49 The NRC inspectors examined the licensee's program for establishing
, the qualification of equipment within the scope of 10 CFR 50.4 The procram was evaluated by examination of the licensee's qualifi-cation documentation files, review of procedures for controlling thethe of licensee's EQ licensee's;afforts, 10 CFRverification of the list, 50.49 equipment adequacy and accuracy and examination of the licensee's program [for maintaining the qualified status of the covered electrical equipmen On March 9,1985, Crystal River Unit 3 (CR-3) was scheduled to shut down for an extended (20 week) period. The licensee stated his
,. _ intention to have in place a program fully conforming to 10 CFR 50.49
/ ;i s at the completion of the outage, which will be about September 198 ' ~
This inspection report documents Open Items which will be addressed in a future inspection by the NRC staff to verify the licensee's program implementatio *
(1) . Qualification Files, General
The NRC inspectors determined that FPC has established a Computerized Data Base (COB) containing records for plant equipment that must be qualified to 10 CFR 50.49. The
.
'
CDB is a generalized data base; that is, all information contained in it can be retrieved and arranged in any desired' pre-selected or custom format. The following
-
information is included for each component on the 10 CFR 50.49 Master List:
,e
,(
e +
'
"
s 4
-
i
-
- _ ___ .
,
Specifications (zone environmental and operating time)
- -
'
-
Equipment qualification levels
-
Documentation of equipment qualification
-
Equipment identification information
-
Equipment repair / maintenance histories and requirements
-
Equipment qualified spare part listings
-
Records removed from active status (" Archived Records")
The CDB is administratively controlled under procedures defined in the FPC Crystal River Unit 3 Qualification Maintenance Program Manual (QMP Manual).
Supporting documentation for the CDB records is contained primarily in Document Vendor Files, arranged by vendor. These files include test reports, analyses, catalogs, certificates of conformance, vendor correspondence, walkdown worksheets, and maintenance /
surveillance requirements and histories for qualified equipmen Definition of applicable plant environmental conditions is contained in document SP-5059, "CR-3 Environmental and Seismic Qualification Guide Specification and Data."
The NRC inspectors reviewed and evaluated EQ documentation for 13 types of equipment. Each equipment type corresponded to one of the " items" in the FRC TER. The types were selected in advance by the inspection team and identified to the licensee during the entrance meeting. For each equipment type, FPC and NUS personnel printed a System Component Evaluation Worksheet (SCEW sheet) for each included component by plant tag numbe The licensee also provided supporting material from the Document Vendor File The Document Vendor Files were found to be sufficient to establish qualification for one of the equipment types selected for review (Gems /DeLaval sump level transmitters) except for two questions
.
~
to which the licensee has not yet responded, as described in paragraph 4.D.(3). Unlike all of the other files inspected, the sump level transmitter file was based on FPC's new procedure SREP-24, " Qualification Report Review," because these transmitters were replacement equipment rather than original plant equipmen Deficiencies were found in all of the files reviewed that were-not prepared using SREP-24. While none of the deficiencies resulted in determin~ation that equipment was not qualified, in several cases described in paragraph 4.D qualification was not adequately established pending resolution of inspector question In' addition to the questions still requiring resolution, numerous questions were asked by the inspectors for which the licensee provided responses during the inspectio _ _
i
'
'
These documentation deficiencies included failure to include or adequately reference necessary information in the files provided for review, and discrepant or confusing information. Examples include the following:
(a) The operating time design verification record cited in paragraph 4.D.(11) was never specifically referenced, although it applies to many component (b) Gilbert Associates report G150-3AN-007, containing numerous aging analyses, is not referenced in the QMP Manual and is not referenced in at least one affected component file, BIW cabl (c) Conax test reports that appear to complete the basis for qualifying penetration assemblies were not included in the files originally furnished for inspectio (d) Purchase order and use histories necessary to identify plant applications of Rockbestos cable were not included or referenced in the EQ file (e) The Endevco accelerometer EQ file and the COB-based Outstanding Item Report conflicted with the non-referenced MAR Status Report concerning the status of the accelerometers in the plan (f) As noted in paragraph 4.D.(5), the files appeared to confuse the qualification status of the pigtail terminations with that of the penetration assembly prope For each of the examples cited above the licensee did provide during the inspection information sufficient to technically resolve the concern, but the file deficiencies require correction in order to meet 10 CFR 50.49 requirements. The deficiencies appear to be generic to files not prepared using SREP-24, since they were found in virtually every such file reviewed. A future inspection will review the licensee's correction of these deficiencies and his response to the questions in paragraphs 4.D.(1) through (9). This constitutes Open Item j 50-302/85-09-01, Correction of Qualification Documentation Files.
'
(2) EQ Program Procedures (a) QMP Manual Content The NRC inspectors reviewed Revision 0 (February 12, 1985)
of the QMP Manual, which defines the 10 CFR 50.49 program for the plant. The QMP Manual appears to be a good overall program definition document. It covers definitions, refer-ences,.a maintenance program data base (the COB) for qualified equipment, review and other responsibilities, requirements for procedures, specification and procurement document l review and approval, spare part evaluations, vendor history files, equipment replacement review, procedure development,
i:
-
.
review of vendor documents, and the aging maintenance and surveillance program. The manual also contains lists of Plant Operating and Emergency Procedures (ems, EPs, and ops)
and Plant Procedures (SREPs, NPSM, PMs, cps, and SPs) that interface with or otherwise relate to the EQ progra Although the QMP Manual has not yet been fully implemented, an aspect discussed later in this paragraph, the NRC inspectors noted that the following items were not addressed:
(i) The QMP Manual does not address. incorporation of existing NUS comments on procedure (ii) The QMP Manual lacks a complete list of applicable procedures; for example, procedure MOP-407 must be revised as described in paragraph 4.D.(8) below, yet M0P-407 is not listed in the QMP Manual, and procedure PM-105 as addressed in paragraph 4.A.(4)
below is not liste (iii) The licensee did not identify a plan for tracking the preparation, review, and revision of procedures during the March 9, 1985, outag (iv) The QMP Manual does not define timeliness criteria for procedure reviews and for updating the CDB and related documents to reflect new adverse information such as IE ins / Bulletin (v) The QMP Manual does not require that all Modification Approval Records, not just MARS specifically changing qualified equipment, should be reviewed for EQ impac Verification in a future inspection that these items are incorporated into the QMP Manual and procedures constitutes Open Item 50-302/85-09-02, QMP Manual Revisio (b) Other Procedures The NRC inspectors reviewed the following FPC procedures, in addition to those discussed elsewhere in this inspection report:
Nuclear Procurement and Storage Manual (NPSM)
Safety Related Engineering Procedure SREP-1, Safety Identification and Design Inputs, draft of Rev. SREP-24, Qualification Report Review, Rev. .CP-113, Handling and Controlling Work Requests and Work Package PM-100, Preventative Maintenance Program, Rev. _ - .- .
'
The NRC inspectors also reviewed several completed FPC Procedure Review forms that defined EQ driven changes for the following procedures and the Emergency Procedures listed in paragraph 4.A.(3). The inspectors then discussed the forms and related procedures with licensee personnel in order to assess their role in the overall EQ Program and their current revision status:
SREP-1, Safety Identification and Design Inputs SREP-2, Design Development SREP-5, Document Approval and Control SREP-6, Preparation and Control of a Modification Approval Record (MAR)
SREP-9, Controls of Record Retention SREP-13, Safety Related Procurement Pequisition Preparation, Review and Approval SREP-24, Qualification Report Review PM-150, Trending The NRC inspectors determined that the procedures listed above constitute the plant procedures that must be modified to implement FPC's EQ Program as defined in the QMP Manua For example, SREP-1 will define the scope of plant equipment changes that can trigger changes to the 10 CFR 50.49 Master List by invoking scope paragraphs (b)(1), (2), and (3) of the rule. SREP-2 will require consideration of the environ-mental zone descriptions in SP-5095. SREP-5 will invoke SREP-24 for qualification documentation reviews. SREP-6 will add an EQ check list to MARS. And the QMP manual requires periodic review of the cited Emergency Procedures for impact on the 10 CFR 50.49 Master Lis The procedures are presently being revised and reviewed by the licensee. When fully developed and implemented the procedures appear capable of meeting the program requirements of 10 CFR 50.49, provided that they fully address the QMP Manual, the Procedure Review Forms, and the Open Items identified in this repor (c) Program Implementation Licensee personnel interviewed by the NRC inspectors stated their intention to implement the EQ program defined in the QMP Manual by the end of the March 9, 1985, outage, which is the plant's second refueling outage after March 31, 198 It is further noted that the plant was already shut down .
in that outage on the alternate earlier rule effective date of March 31, 1985, set forth in paragraph (g) of 10 CFR 50.4 _
-
.
The NRC inspectors advised the licensee that his program is required to be fully in place at the end of the refueling outage, and that substantial work remained to be performed during a period of approximately 20 weeks. None of the required new procedures or revisions to existing procedures was completed except SREP-24 (which is internal to the EQ
- group itself), and methods for tracking the work appear to be minima Verification in a future inspection that the licensee has completed revision and preparation of procedures as required by the QMP Manual constitutes Open Item 50-302/
85-09-03, Revision of Plant Procedure The NRC inspectors noted that certain activities covered by the procedures under development must actually be performed during_the March 9, 1985, outage. This particularly involves maintenance or surveillance activities such as the emergency feedwater pump motor insulation inspection discussed in paragraph 4.A.(4). A future inspection will examine whether the licensee has identified and performed all applicable items called for in the procedures currently being developed, during the March 9,1985, outage. This comprises Open Item 50-302/85-09-04, Implementation of EQ Procedures During Refuel The licensee's EQ maintenance procedures are separately addressed in paragraph 4.A.(4).
The inspectors were advised that training of affected personnel is scheduled to be completed by November 198 The level of training is expected to amount to about four hours for each of the maintenance personnel, in addition to training on the revised Nuclear Procurement and Storage Manua Verification in a future inspection of training comprises Open Item 50-302/85-09-05, Training Implementatio (3) 10 CFR 50.49 List (EQ Master List)
The_ licensee is required to maintain a list of the equipment necessary to bring the plant to hot shutdown in case of an accident. The licensee's first EQ Master List is dated May 20, 1983, and was developed from the licensee's response to IE Bulletin 79-01B. The basis for generating this list is described in a letter from Florida Power Corporation to NRC dated May 31, 1984. At present, formal procedures to maintain the accuracy and completeness of the Master List are in the planning stage and draft versions are availabl The controlling document for these and other procedures is the QMP Manual (Rev. O dated February 12, 1985). This manual has been written to provide an overview of the licensee's program for maintaining the qualified status of the equipmen .- _ _ .
'
Procedures for maintaining the completeness of the Master List could not be reviewed at the time of the audit inspec-tion because they had not yet been written. Paragraph 4. A.(2).(b) discusses SREP-1, which will cover Master List updatin Sixteen items were used as an audit sample to verify the completeness of the Master List. In order to compile this audit sample, an extensive review was conducted of the following Emergency Plan Implementing Procedures, Operating Procedures, Emergency Procedures, and Piping and Instrumentation Drawings:
Emergency Plan Implementing Procedures EM-204(a), Rev. 3, October 12, 1984; Release of Off site
-
Dose Assessment During Radiological Emergencies at CR- Operating Procedures OP-202, Rev. 58, February 13, 1985, Plant Heatu OP-204, Rev. 39, December 4, 1984, Power Operatio OP-210, Rev. 19, November 8, 1984, Reactor Startu OP-401, Rev. 21, July 10,1984, Core Flooding System OP-404, Rev. 48, December 19, 1984, Decay Heat Removal Syste OP-412, Rev. 33, December 27, 1984, Waste Gas Disposal Syste OP-501, Rev. 8, May 18, 1984, Reactor Non-Nuclear Instrumentatio OP-502, Rev. 15, February 13, 1985, Control Rod Drive Syste OP-507, Rev. 1, February 13, 1985, Infrequent Operations of the ES and Reactor Protective System OP-605, Rev. 30, August 22, 1984, Feedwater Syste Qualification Maintenance Program Manual, Rev. 0, February 12, 198 Emergency Procedures EP-120, Rev. 00, June 10, 1983, Inadequate Shutdown Valu EP-140, Rev. 00, June 8, 1983, Emergency Reactivity Contro EP-260, Rev. 00, June 9, 1983, Inadequate Decay Heat Remova EP-290, Rev. 03, September 20, 1984, Inadequate Core Coolin EP-390, Rev. 01, October 25, 1983, Steam Generator Tube Ruptur P& ids 302-001, Main and Reheat Steam System , Emergency Feedwater System , Core Flood System , Decay Hea c ,30
'
1: , y^
'
> [ ~ O[ #
<
-
.
P&I0d (continued)
.
302-672, Decay Heat Liquid Samplin , Containment Monitor , 302-712, R.C. Spra , Seal and Spray Syste ;
-302-661, Makeup Syste l l
The audit sample items were selected to verify that those l items required to be on the list were in fact on the lis j Additionally, a check was made to determine that R.G. 1.97 I items which may be required in the future and are not on the '
list now, are earmarked for future consideration. All j sample items required to be on the EQ Master List were j determined to be on the list. The R.G. 1.97 sample item, '
the high range radiation monitor, was not on the list, and l its future addition will be monitored in our ongoing review of your R.G.1.97 implementation. The list in its present form is considered satisfactor (4) EQ Maintenance Program
'
The NRC inspectors reviewed the licensee's program for preserving the qualified status of equipment through maintenance and surveillance. As outlined in the QMP Manual and described by licensee personnel, the program would appear to be acceptable, but none of the necessary procedure preparations or revisions had been completed yet.
The inspectors determined that existing plant maintenance procedures cover normal non-EQ maintenance activities such as manufacturer's installation manual recommendations. For EQ Master List equipment, EQ-related requirements are loaded into the CDB and are available in the EQ Maintenance Program
- Surveillance and Maintenance Summary Printout. For example,
the Summary Printout states that periodic inspection of the i
EFW pump motor insulation (for cracking, etc.) is an EQ requirement and identifies procedure PM-105 as the existing i
plant procedure for performing preventative maintenance on
,
motors. The licensee informed the inspectors that affected
!- procedures such as PM-105 will be revised prior to plant startup.
(
The inspectors were informed by licensee personnel that the Preventative Maintenance Procedures and revisions for EQ equipment will be prepared by EQ personnel, then processed through the customary PM procedure review cycle and issued
,
'
by Records Management. This practice will address EQ concerns within the existing PM system.
l l
!
.
. . . .. - .. - . .
. - - . _ . . - . . . -
< =
.
Verification in a future inspection that EQ maintenance ,
-
,
procedures are in place before restart constitutes Open '
Item 50-302/85-09-06, EQ Maintenance Procedure The inspectors.found that the normal plant maintenance
' procedures currently being used did not compromise the
, environmental qualification.of equipment reviewed. The components scheduled for replacement or modification during the March 9 outage,'with justifications in place, included
, much of the equipment that would be subject to EQ-related
maintenance / surveillance, such as. transmitters and solenoid
'
valves. For this reason the EQ maintenance requirements prior to the March 9, 1985, outage were relatively smal 'B . SER/TER Commitments
,
The NRC~ inspectors evaluated the implementation of.EQ corrective action commitments made as a result of SER/TER-identified deficiencies
.as stated in licensee submittals dated January 31 and May 31, 1984.
.
.These submittals state.that.all equipment on the 10 CFR 50.49 Master List is qualified except numerous component types for which Justification
, for Continued Operation _were submitted pending equipment replacemen In addition, the licensse stated that any additional equipment required to meet paragraph (b)(3) of 10 CFR 50.49 and R.G.1.97 would be identified in a separate program, and committed to making any. required
modifications during Refuel VI (the outage after the March 9, 1985
!
shutdown). The NRC staff is presently reviewing the report describing j .the results of that program.
.
Based on review of files and of the 10 CFR 50.49 Master List, the NRC inspectors identified no deficiencies in the implementation of
,. SER/TER commitments to date. Review of selected instruments shown
on the May 20, 1983 Master List and performing post-accident
. monitoring functions showed that none has been subsequently removed from the list. However, ongoing review of R.G. 1.97 implementation
,
may result in additional equipment being added to the' Master List.
b Plant Physical Inspection
'
The NRC inspectors, with component accessibility input from licensee
- personnel, established a list of seven components for physical
- inspection. Six of these components were of the same types for which
'
file reviews were performed (the SCEW sheet for the seventh was
' reviewed), and all were accessible at the time of inspection, during
'
plant operation. The inspectors examined characteristics such as-
'
mounting configuration, orientation, interfaces, model number, ambient-environment, and physical condition. No concerns were identified during the physical inspection.
,
' - Detailed Review of Qualification Files
!. The NRC inspectors exaeined SCEW sheets and files for 13 selected
'
' equipment types to verify the qualified status of equipment within the' scope of 10 CFR 50.49. In addition to comparing plant service
4
.s.. . . - . _ , - , . . . ..-, , - - _ - . _ _ . - _ _ . _ , . . . . _ _ - , - , _ , -. . _ . . . . , _ , . . , _ , . . , . . , , , . , - -
.
conditions with qualification test conditions and verifying the bases for these conditions, the inspectors reviewed areas such as required post-accident operating time compared to the duration of time the equipment has been demonstrated to be qualified, similarity of tested equipment to that installed in the plant (e.g., insulation class, materials of components of the equipment, tested configuration compared to installed configuration, and documentation of both),
evaluation of adequacy of test conditions, aging calculations for qualified life and replacement interval determination, effects of decreases in insulation resistance on equipment performance, adequacy of demonstrated accuracy, evaluation of test anomalies, and applica-bility of EQ problems reported in IE ins / Bulletins and their resolutio As indicated in paragraph 4.A.(1) above, most files did not provide clear evidence of equipment qualification. The inspection team had to ask numerous questions. In response the licensee provided additional supporting information, so that the qualification of the equipment selected for file inspection was eventually established subject to correcting the documentation deficiencies and resolution of the remaining inspection concerns identified below. Verification that the concerns cited in paragraphs 4.D.(1) through (9) have been resolved is included in the Open Item defined in paragraph 4. A.(1)(50-302/
85-09-01).
(1) Limitorque valve operators, TER Item 4, Tag Nos. WDV-60 and WDV-9 Although FPC considers these operators qualified to the 00R Guide-lines and no justifications for Continued Operation were submitted, the inspection disclosed that they will be upgraded to IEEE 323-1974 criteria during the March 9 outage by replacing their motor An inspection to verify the presence of T-drains and other details is also planned for the outag (2) Rosemount model 1153HB6 transmitters, TER Item 41. - Test reports 108025 and 108026 were used for the qualification review of these transmitters, but transmitter design changes and further testing were necessary to complete qualification and these changes were not addressed in the file. The calculation supporting the claimed 10 year qualified life in CR-3 is not provided, and installation interface provisions (such as cable entrance seal)
are not addresse (3) Gems /DeLaval sump level transmitters, TER Item 50. - These transmitters are replacement equipment installed in 1983 and reviewed under FPC procedure SREP-24. The inspector identified only two questions concerning this fil Three installation data sheets specify model XM-54853 instead of XM-54852 (an apparent error), and variations between specified and actual test voltage and frequency limits.were not addresse . . . _ . . _ _ _ . _ _ _ _ -
(4) States terminal blocks TER Item 68. - Qualification was based only on a letter (Reference No. G080-3VC-001). The file contained no test report or evidence that FPC reviewed a test repor Similarity between installed type NT blocks and tested ZWM blocks was not established, so that the material list for aging analysis cannot be verified. A statement in the file that radiation-caused failure of polypropylene will not affect the class 1E function was not justified. FPC initiated efforts to obtain additional documentation from Multiamp Co. to address these concern (5) Conax electrical penetration assemblies, TER Item 76.'- The COB, files, and submittals to the NRC contained conflicting information concerning the qualification status of these assemblies. For example, the May 20, 1983 submittal to the NRC states that they are qualified, yet the SCEW sheets showed operating time, contain-ment spray, radiation, and aging as outstanding items. The inspector determined that the discrepancy relates to the termination of the penetration pigtails. The licensee plans to replace the terminal blocks presently used with qualified Raychem splices for class IE leads during the March 9 outage; JCOs covering these terminations have been submitted. The inspector and licensee determined that the files appeared to contain sufficient information to qualify the assemblies excluding the termination FPC intends to perform a complete SREP 24 review of the penetration assemblies during the March 9, 1985, outag (6) Rockbestos silicone insulated cable, TER Item 78. - In response to NRC White Book (NUREG-0040) findings, FPC temporarily suspended Rockbestos as an approved vendor on May 18, 198 Vendor approval was discontinued on August 1, 1984 based on IE IN 84-44 and other factors. However, the SCEW sheet continues to show the cable as qualified to the D0R Guidelines, and a Master List printed from the CDB on March 7 still shows Rockbestos. cable. In response to questioning, FPC surveyed its purchase order files and stores records. This search showed
! that no Rockbestos cable is used in safety-related circuits.
,
No evidence was found that stores cable has been labeled as l unqualifie The EQ files have not been updated with revised analyse (7) BIW type EPR/Bostrad 7 cable, TER Item 80. - FPC Nuclear Procurement and Stores Manual Procedure No. 7.2 requires that review of supplier quality information shall consider records from the NRC White Book. Although the White Book published April 1984 contains adverse information impacting the cable qualification, an FPC review dated July 16, 1984, granted i continued supplier approval without mention of the White Boo BIW Systems remained an approved vendor at the time of the inspection.
r
m ,
.
Several additional concerns were identified for the BIW cabl The EQ files do not address the White Book findings. SCEW sheet references are not complete (e.g., report G150-3AN-007 is not referenced). The file did not support the SCEW sheet statement of sequential test as the basis for a 40 year life (followed by a LOCA), yet aging related maintenance and surveillance activity was not recommende (8) Kerite tape-type terminals, TER. Item 81. - Kerite type 39-69 wire terminals are available with two types of tap The inspector verified that Kerite documentation in the file establishes that one type has been tested to 200 Mrad, exceeding the service condition of 190 Mrad. The documentation cautions against the use of Bishop Bi-Seal 3 tape, which has less than 1 Mrad enduranc The inspector determined that FPC Nuclear Modifications and Outage Procedure M0P-407 calls for the unacceptable Bishop Bi-Seal 3 tape with Kerite tape terminals 39-69. The licensee had not determined where the procedure has been used or corrected any improper terminations. Two other discrepancies remain for the Kerite terminals. First, aging analysis is not provided to demonstrate the claimed 40 year life, which the SCEW sheet states is based on testing. Second, the file does not address the failure of one of the two test specimen (9) Rosemount 177HW resistance temperature detectors, TER Item 96. -
The files establish qualification only if EP 0-rings and Conax seals are used at the cable entrances; qualification without them is not addresse Modification Approval Record MAR-82-05-24-01 covers installation of the 0-rings and seals, but the work has not yet been performed, nor has a Justification For Continued Operation been prepare Additional documentation discrepancies found by the inspector include failure to address thermal aging and the absence of both the detailed test report 67615 and evidence that the licensee has reviewed i (10) Other files. - The inspectors'also reviewed files for the following equipment:
,
(a) Limitorque valve operators, TER Item 2
!
(b) Endevco accelerometers, TER Item 54 (c) Electric Machinery Co. motor, TER Ite:n 58 l
(d) Electrical contactors, TER Item 91 For these components no technical concerns remain open, but the Open Item described in paragraph 4.A.(1) applies to the above deficiencies.
!
l
-, - -- - - --
-- -- _.__.- _ _ _
r-g-(
, .
Although specific followup items are not cited for these components, the inspection team's review of these files contributed to the determination (see paragraph 4.A.(1)) that the licensee should re-review all file (11) Operating Time. - The COB shows two sources for required operating times, Tech Specs and " Operation /Eng. Evaluation."
Roughly two-thirds of the values are obtained from the latter source. In response to questioning, the licensee obtained from Gilbert Associates a copy of a Design Verification Record dated November 20, 1980, W.0. 04-4762-18. This document contains analyses backing up the " Operation /Eng. Evaluation" values on the SCEW sheets. The inspectors reviewed the rationale for several components and found it acceptable, although the licensee noted that in at least one case the required operating time for a valve operator exceeded the time specified for the transmitter used to control it. Since the document was not obtained until near the end of the inspection it was not thoroughly reviewed. For example, the inspectors did not determine that monitoring instruments needed to guide operator control actions were properly addressed. Based on these specific concerns and their generic implications, the basis for specified operating times will be reviewed during a subsequent inspectio This item constitutes Open Item 50-302/85-09-07, Required Operating Tim E. IE Information Notices and Bulletins The NRC inspectors reviewed and evaluated FPC's activities related to the review of EQ-related IE ins / Bulletins. The inspector's review included examination of FPC's procedures and EQ documentation packages relative to 12 ins and one Bulleti Only one of these ins (84-44) applied to the files reviewed; the others applied to equipment either not included on the plant's- 10 CFR 50.49 Master list or not required to be qualified because of planned replacement with interim operation justified.
!
Paragraph 4.D.(6) of this inspection report shows that under the licensee's existing procedures, IN 84-44 was effectively considered with respect to procurement but not for other aspects of equipment qualification. The licensee stated that the QMP Manual will require addressing ins / Bulletins and that they will be listed on SCEW sheets.
!
It will also be necessary to modify existing FPC procedures to ensure that ins / Bulletins receive timely EQ review as part of the licensee's normal procedure. These changes are part of the licensee's program to be in place at the end of the March 9, 1985 outage, and this will be verified in a future inspection. This constitutes Open Item
- 50-302/85-09-08, ins / Bulletin ~
l
.
.