Category:INSPECTION REPORT
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20210R9361997-08-27027 August 1997 Partially Withheld Insp Rept 50-302/97-10 on 970804-06. Violations Noted.Major Areas Inspected:Physical Security ML20210M5731997-08-11011 August 1997 Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H0981997-07-14014 July 1997 Insp Rept 50-302/97-09 on 970602-20.Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected: Engineering of Functional Areas IR 05000302/19970071997-07-0707 July 1997 Insp Rept 50-302/97-07 on 970504-0607.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re self-assessment Rept on Health Physics & Radiation Control Areas Access Control Program ML20140D2721997-06-0202 June 1997 Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items ML20138J4091997-04-21021 April 1997 Insp Rept 50-302/97-02 on 970223-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20140E7481997-04-18018 April 1997 Partially Withheld Insp Rept 50-302/97-03 on 970317-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Control of Safeguards Info ML20138J8191997-04-17017 April 1997 Special Insp Rept 50-302/97-06 on 970127-0321.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected:Engineering Functional Area to Followup on URI 97-01-06;HPI Sys Design,Licensing Basis & TS Concerns ML20137V7271997-04-11011 April 1997 Insp Rept 50-302/97-04 on 970127-0321.No Violations Noted. Major Areas Inspected:Operations & Engineering ML20137T0461997-03-24024 March 1997 Insp Rept 50-302/97-01 on 970112-0222.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20134P4001997-02-0505 February 1997 Insp Rept 50-302/96-20 on 961201-970111.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20138J5691997-01-31031 January 1997 Insp Rept 50-302/96-18 on 961202-06 & 16-19.Violations Noted.Major Areas Inspected:Area of Plant Support by Three Regional Safeguards Specialists IR 05000302/19960171996-12-23023 December 1996 Insp Rept 50-302/96-17 on 961103-30.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000302/19960141996-12-0202 December 1996 Insp Rept 50-302/96-14 on 961015-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise IR 05000302/19960151996-11-27027 November 1996 Insp Rept 50-302/96-15 on 961006-1102.Violations Noted.Major Areas Inspected:Operations Re Emergency Feedwater Sys,Maint, Engineering & Plant Support ML20134J7111996-11-0404 November 1996 Insp Rept 50-302/96-12 on 960826-1011.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering & follow- Up on URI 50-302/96-201-08,acceptability of EDG Surveillance Test Values ML20129H7311996-10-30030 October 1996 Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support IR 05000302/19960161996-10-30030 October 1996 Insp Rept 50-302/96-16 on 961029-31.No Violations Noted. Major Area Inspected:Malevolent Use of Vehicles at Nuclear Power Plants.Details Withheld ML20134F0381996-10-28028 October 1996 Insp Rept 50-302/96-13 on 960919-1009.No Violations Noted. Major Areas Inspected:Licensees Response to Potential Tampering Event ML20129A2861996-10-0404 October 1996 Insp Rept 50-302/96-09 on 960811-0907.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maintenance & Plant Support ML20134C3131996-09-12012 September 1996 Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000302/19930161993-12-23023 December 1993 Insp Rept 50-302/93-16 on 931115-19 & 1206-1210.Violations Noted.Major Areas Inspected:Emergency Operating Procedure Team,Representative Records,Interviews W/Personnel & Observation of Activities in Progress 1999-09-13
[Table view] Category:UTILITY
MONTHYEARIR 05000302/19900301990-11-17017 November 1990 Insp Rept 50-302/90-30 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Annual Emergency Exercise IR 05000302/19900291990-10-31031 October 1990 Insp Rept 50-302/90-29 on 900908-1005.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Facility Mods & Licensee Action on Previous Insp Items ML20058B0891990-10-17017 October 1990 Insp Rept 50-302/90-32 on 900918-1005.Violations Noted. Major Areas Inspected:Events Resulting in Breach of Reactor Bldg Containment & Lack of Leak Integrity of Encapsulation Assembly Providing Secondary Boundary to Decay Heat Sys IR 05000302/19900311990-10-10010 October 1990 Insp Rept 50-302/90-31 on 900917-20.No Violation Noted.Major Areas Inspected:Verification That Corrective Actions for Previous Findings Adequate IR 05000302/19900251990-09-24024 September 1990 Partially Withheld Insp Rept 50-302/90-25 on 900812-17 (Ref 10CFR2.790(d) & 73.21).One Unresolved Item Identified.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Programs,Organization & Audits IR 05000302/19900241990-08-31031 August 1990 Insp Rept 50-302/90-24 on 900707-0810.Violation Noted.Major Areas Inspected:Plant Operations,Security,Radioligical Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19900211990-07-27027 July 1990 Insp Rept 50-302/90-21 on 900602-0706.No Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19900171990-07-10010 July 1990 Insp Rept 50-302/90-17 on 900501-03.Noncited Violations Noted.Major Areas Inspected:Fitness for Duty Program as Required by 10CFR26,including Licensee Drug & Alcohol Abuse Policies,Training,Chemical Testing,Appeals & Repts & Audits IR 05000302/19900221990-07-0606 July 1990 Insp Repts 50-302/90-22 on 900612-16.Violations Noted But Not Cited.Major Areas Inspected:Review & Witnessing of Integrated Engineered Safeguards & Loss of Offsite Power Tests IR 05000302/19890241989-09-15015 September 1989 Insp Rept 50-302/89-24 on 890907-08.Violations Noted.Major Areas Inspected:Review of Events Resulting in Unplanned Shutdown of Facility IR 05000302/19890191989-08-31031 August 1989 Insp Rept 50-302/89-19 on 890708-0804.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Security,Fire Protection,Surveillance Observation,Maint Observation,Safety Sys Walkdown & LERs IR 05000302/19890211989-08-25025 August 1989 Insp Rept 50-302/89-21 on 890808.No Violations or Deviations Noted.Major Areas Inspected:Observation & Analysis of Ultrasonic Exam Capabilities for Opposite Surface Initiating Flaws in Various Matls Involved Re Stated Welds IR 05000302/19890181989-08-16016 August 1989 Insp Rept 50-302/89-18 on 890710-14.Violations Noted.Major Areas Inspected:Inservice Testing & Followup on Previous Insp Findings ML20245K2961989-08-10010 August 1989 Insp Rept 50-302/89-17 on 890619-20.Violations Noted.Major Areas Inspected:Followup to Events Surrounding 890616 Loss of off-site Power transient-review of Plant & Operator Response to Transient,Root Cause & Corrective Actions ML20245J0581989-08-0404 August 1989 Insp Rept 50-302/89-200 on 890424-0505.Weaknesses Noted. Major Areas Inspected:Implementation of Licensee Vendor Interface Program & Program for Procurement of Items for Use in safety-related Applications IR 05000302/19890121989-08-0101 August 1989 Insp Rept 50-302/89-12 on 890620-23.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Exercise,Emergency Operations Facility & Emergency News Ctr.One Weakness Noted IR 05000302/19890161989-08-0101 August 1989 Partially Withheld Insp Rept 50-302/89-16 on 890625-30 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected: Mgt Support,Security Program Plans & Audits,Detection & Assessment Aids & Packages & Vehicles ML20245K0421989-08-0101 August 1989 Insp Rept 50-302/89-15 on 890603-0707.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods,Onsite Events & Annual Emergency Drill ML20246E4491989-06-28028 June 1989 Insp Rept 50-302/89-11 on 890429-0602.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods,Review of IE Info Notices & Followup of Onsite Events ML20246K7561989-06-27027 June 1989 Insp Rept 50-302/89-14 on 890531-0602.Violations Noted.Major Areas inspected:890529 Event Involving Emergency Feedwater Piping & Containment Penetration Heated Above Design Limits & Unanalyzed Thermal Stresses Imposed on Steam Generator IR 05000302/19890131989-06-23023 June 1989 Insp Rept 50-302/89-13 on 890529-0602.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Radwaste Mgt,Transportation of Radioactive Matls & Followup on Previous Inspector Identified Items ML20244D2831989-06-0707 June 1989 Insp Rept 50-302/89-09 on 890424-28.Violations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment & Followup on Previous Insp Findings,Including Review of Util Implementation of 10CFR50.49 Program IR 05000302/19890101989-06-0707 June 1989 Insp Rept 50-302/89-10 on 890515-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Corrective Actions from Previous Findings Re Training & Emergency Operating Procedures IR 05000302/19890081989-05-10010 May 1989 Insp Rept 50-302/89-08 on 890401-28.Violations Noted.Major Areas Inspected:Plant Operations,Security,Radiological Controls,Nonconforming Operations Repts,Facility Mods & Followup of Onsite Events IR 05000302/19890061989-04-25025 April 1989 Insp Rept 50-302/89-06 on 890225-0331.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mod, Review of 10CFR21 Repts & Followup of Onsite Events IR 05000302/19890041989-04-0505 April 1989 Insp Rept 50-302/89-04 on 890227-0303.No Violations or Deviations Noted.Major Areas inspected:post-accident Sampling Sys,Confirmatory Measurements,Radiological Effluents & Reactor Coolant Chemistry IR 05000302/19890051989-03-24024 March 1989 Insp Rept 50-302/89-05 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Radiological Emergency Response Plan & Implementing Procedures & Emergency Facilities IR 05000302/19890031989-03-24024 March 1989 Insp Rept 50-302/89-03 on 890128-0224.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Lers & Nonconforming Operations Rept,Facility Mods & Licensee Actions on Insp IR 05000302/19890021989-02-27027 February 1989 Insp Rept 50-302/89-02 on 890130-31.No Violations Noted. Major Areas Inspected:Reactor Coolant Pump Vibration Monitoring Sys Data Acquisition,Interpretation & Written Instructions for Protective Measures in Event of Failure ML20235P0571989-02-16016 February 1989 Insp Rept 50-302/89-01 on 890101-27.Three Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler & Nonconforming Operations Repts,Followup on Onsite Events & Licensee Action on Previous Insp Items IR 05000302/19880321988-11-30030 November 1988 Insp Rept 50-302/88-32 on 881031-1102.No Violations or Deviations Identified.Major Areas Inspected:Followup on Allegations IR 05000302/19880291988-11-21021 November 1988 Insp Rept 50-302/88-29 on 880916-1021.Violations Noted.Major Areas Inspected:Plant Operations,Security Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Review of Plant Review Committee IR 05000302/19880281988-11-0202 November 1988 Partially Withheld Insp Rept 50-302/88-28 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program,Security Program Audit & Testing & Maint IR 05000302/19880271988-10-0707 October 1988 Insp Rept 50-302/88-27 on 880829-0902.Violations Noted. Major Areas Inspected:Previously Identified Environ Qualification Deficiencies Documented on Justification for Continue Operation.Licensee Commitment Identified ML20204J8041988-10-0404 October 1988 Insp Rept 50-302/88-26 on 880813-0916.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items IR 05000302/19880251988-09-20020 September 1988 Insp Rept 50-302/88-25 on 880822-26.No Violations or Deviations Noted.Major Areas Inspected:Mods & Design Control ML20155A9181988-09-13013 September 1988 Insp Rept 50-302/88-24 on 880716-0812.Violations Noted.Major Areas Inspected:Plant Operation,Security,Radiological Controls,Lers & Nonconforming Operation Repts IR 05000302/19880201988-09-0707 September 1988 Insp Rept 50-302/88-20 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Complex Surveillance Testing & IE Bulletin Followup IR 05000302/19880221988-08-12012 August 1988 Insp Rept 50-302/88-22 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Organization & Mgt Control ML20151X0061988-08-0505 August 1988 Insp Rept 50-302/88-18 on 880609-0715.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Security,Lers,Nonconforming Operations Repts, Review of Bulletins & Actions on Insp Items IR 05000302/19880211988-08-0505 August 1988 Insp Rept 50-302/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry, Corrosion Control & Pipe Thinning IR 05000302/19880191988-07-28028 July 1988 Insp Rept 50-302/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97 ML20151K2941988-07-20020 July 1988 Insp Rept 50-302/88-15 on 880607-09.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Key Emergency & Organizational Functions & Locations During Partial Participation Exercise ML20151D9521988-07-0707 July 1988 Insp Rept 50-302/88-16 on 880512-0608.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Lers,Security & Nonconforming Operations Repts IR 05000302/19880171988-06-10010 June 1988 Insp Rept 50-302/88-17 on 880523-27.No Violations Noted. Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Security Sys Power Supply,Lighting,Assessment Aids & Alarm Stations ML20196B1251988-06-0606 June 1988 Insp Rept 50-302/88-14 on 880416-0611.Violation & Deviation Noted.Major Areas Inspected:Plant Operations,Security, Radiological Controls,Lers & Nonconforming Operations Repts & Review of NRC Bulletins & Circulars IR 05000302/19880091988-06-0606 June 1988 Insp Rept 50-302/88-09 on 880328-0408.Numerous Deficiencies Noted.Major Areas Inspected:Review of Adequacy of Emergency Operating Procedures IR 05000302/19880121988-05-19019 May 1988 Insp Rept 50-302/88-12 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Review of Previously Identified Inspector Followup Items & Enforcement Matters, External Exposure Control & Control of Radioactive Matl IR 05000302/19880131988-05-12012 May 1988 Insp Rept 50-302/88-13 on 880418-22.No Violations Noted. Major Areas Inspected:Seismic Monitoring Program,Fire Protection/Prevention Program,Followup on Previously Identified Insp Items & LERs IR 05000302/19880111988-05-0202 May 1988 Insp Rept 50-302/88-11 on 880312-0415.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Ler & Noncomforming Operations Repts,Refueling Activities & Licensee Actions on Previous Items 1990-09-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist ML20199D6161999-01-0404 January 1999 Notice of Violation from Insp on 981025-1205.Violation Noted:Its Requirements for Valve Position Verifications Not Met as Evidenced by Listed Examples IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19983011998-07-31031 July 1998 NRC Operator Licensing Exam Rept 50-302/98-301,including Completed & Graded Tests,For Tests Administered on 980629-0702 IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20249A2941998-06-0808 June 1998 Notice of Violation from Insp on 980322-0509.Violation Noted:As of 980423,licensee Had Not Complied W/Requirements of Procedure CP-111,in That,Only Two of Discrepancies Identified in Ioc NL97-0262,had Been Documented IR 05000302/19980991998-06-0404 June 1998 SALP Rept 50-302/98-99 for 961006-980509 ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8871998-04-0808 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:On 980220,Axial Power Imbalance Alarm Was Inoperable for Approx 3.5 Hours & Axial Power Imbalance Was Not Verified to Be within Acceptable Operating Limits ML20248L6171998-03-16016 March 1998 Notice of Violations from Insp on 980126-30.Violations Noted:Test Program for ECCS Operating in Piggyback Mode Did Not Demonstrate That Sys Would Perform Satisfactorily in Service IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216E9291998-03-0404 March 1998 Notice of Violation from Insp on 980104-0207.Violations Noted:On 980203 Licensee Failed to Accomplish Required Posting of Bulletin Boards ML20203F5561998-02-23023 February 1998 Notice of Violation from Insp on 971021-24,1208-12 & 980105-09.Violations Noted:Implementation of Validation Program Did Not Adequately Demonstrate Usability of Emergency Procedures ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 9802051998-02-0202 February 1998 PNO-II-98-005:on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 PNO-II-98-004, on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License1998-01-30030 January 1998 PNO-II-98-004:on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release1998-01-22022 January 1998 PNO-II-98-003:on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release ML20199G6761998-01-16016 January 1998 Notice of Violation from Insp on 971201-16.Violation Noted: as of 971211,licensee Health Physics Supervisors Failed to Identify & Correct Personnel Contamination Repts That Were Not Completed IAW Requirements of Procedure HPP-104 ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N6211997-12-29029 December 1997 Notice of Violation from Insp on 971026-1129.Violation Noted:On 971105,licensee Failed to Perform Adequate Se,Per 10CFR50.59 for Functional Test Procedure for B Emergency Diesel Generator Power Upgrade & Radiator Replacement Mods ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20199A2091997-12-22022 December 1997 EN-97-116:on 971229,informs Commission That Staff Intends to Exercise Enforcement Discretion in Accordance W/Section VII.B.2 of Enforcement Policy & Not Issue NOV or Proposed Imposition of Civil Penalty to Util for Violations PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified1997-12-19019 December 1997 PNO-II-97-063:on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified IR 05000302/19973011997-12-17017 December 1997 NRC Operator Licensing Exam Rept 50-302/97-301 Including Completed & Graded Test for Test Administered on 971118. Exam Results:Sro Candidate Passed Written Exam ML20203A1911997-12-0404 December 1997 Notice of Violation from Insp on 971006-24.Violation Noted:Work Request Numbers 333797 & 333798,issued in Mar 1997 to Install Stem Protectors on Actuators Were Closed W/O Performing Work ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20202D7301997-11-24024 November 1997 Notice of Violation from Insp on 970921-1025.Violation noted:10CFR50.59 SE Had Not Been Performed as Required within 90 Days on Wds Piping non-conforming Condition IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-97-059, on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities1997-11-18018 November 1997 PNO-II-97-059:on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities ML20212B9061997-10-16016 October 1997 Notice of Violation from Insp on 970817-0920.Violations Noted:Scaffolding Control Program Does Not Contain Measures to Assure That Deviations from Design Quality Std for safety-related Equipment Installed Have Adequate Control IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211Q2581997-10-14014 October 1997 Notice of Violation from Insp on 970922-26.Violation Noted:On 970820,individual Was Terminated & Authorized Access Was Not Removed from Plant Security Computer Until 970905 ML20211E4891997-09-12012 September 1997 Notice of Violation from Insp on 970713-0816.Violations Noted:On 970728,licensee Personnel Performed quality-related Work to Restore once-through SGs During Reduced RCS Inventory Operation Without Written & Approved Procedure ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support 1999-09-13
[Table view] |
See also: IR 05000302/1988016
Text
- - - _ _ _ _ _ _ _ - _ _ _ - _ - _ - _ _ - - _ _ _ _ _ _ _ - _ - _ - - - _ _ _ _ _
%
,.
, . , .
'. . . o. NUCLEAR REGULATORY COMMISSION
g^
REGION il
'
e
-h.. *I
8 i b [' ,, 101 MARIETTA STREET.N.W.
ATLANTA, GEORGI A 30323
_ - 't
.
%.J &
+...+
'
-
Report No.: 50-302/88-16--
, Licensee: Florida Power Corporation
, 3201 34th Street, Scuth
St. Peter sburg, FL 33733
, o
Q, ' Docket No.: 50-302 License No.: OPR-72
Facility Name: Crystal River 3
h ' Inspection Conducted: May 12 - June 8,'1988
Insnectors: olvf/> )ny '7 /'? /f f
T. Stetki, Sen R ident inspector Date Signed
t/T1. w9 L
-J. Tedrow, Resident I s ector
7/7 / rd
~
Date ' Signed
~
Approved' by: -
RMrlenjak, Section CHieT-
b[h [@t
Dath Signed
Division of Reactor Safety
SUMMARY
4
Scope: This : routine inspection was conducted by two resident inspectors in
the areas of plant . operations, radiological controls, security,
Licensee Event Reports and_ Nonconforming Operations Reports, facility
modifications, TMI Task Action Plan Review, Offsite Review Committee
Activities, and licensee action on previous inspection. items.
Numerous facility tours were conducted and facility operations
observed. Some of these tours and observations were conducted on
backshifts.
'NRC Region II personnel met with the licensee on May 25, 1988, to
discuss the licensee's efforts in improving the surveillance program
(paragraph 2.b.(8)(e)).
Results: Three violations were identified: Failure to perform a channel
calibration o f. the containment hydrogen analyzers, paragraph
2.b.(8)(a); Failure to - adhere to the requirements of procedure
CH-101, paragraph 2.b.(8)(b); Failure to provide adequate corrective
action to prevent exceeding the maximum release rate for a liquid
release, paragraph 3.b.(1).
'
Management attention to surveillance was evident.
l-
l
8807250301 880708
PDR ADOCK 05000302
Q PDC
.. - - . - . . . . , , . - . .. -
. . - - - _
-- .. , , .
. _______ _ _ _ _ _ - _ _ ___ - - - _ . __
.
,.
,
. REPORT DETAILS
1. Persons Contacted
Licensee Employees
- W. Bandhauer, Assistant Nuclear-Plant Operations Manager
- G. Becker, Manager, Site Nuclear Engineering Services
- J. Brandely, Manager, Nuclear Integrated. Planning
- P. Breedlove, Nuclear. Records Management Supervisor
- J. Colby, Manager, Nuclear Mechanical / Structural Engineering Services-
- M. Collins, Nuclear. Safety and Reliability Superintendent
E. Ford,' Nuclear Operations Technical Advisor
J. Gibson, Nuclear Technical Specification Coordinator
- D. Green, Nuclear Licensing Specialist
F. Gross, Engineering Aide
-*B. Hickle, Manager, Nuclear Plant Operations
J. Holton,' Senior Nuclear Results Engineer
- G. Longhouser, Nuclear Security Superintendent
- W. Marshall, Nuclear Operations Superintendent
- P. McKee, Director, Nuclear Plant Operations
- S. Robinson, Nuclear Chemistry and Radiation Protection Superintendent
S. Roe, Nuclear Project Engineer
- V. Roppel, Manager, Nuclear Operations Maintenance and Outages
- W..Rossield, Manager, Nuclear Compliance
L. Sexton, Senior Nuclear Mechanical Engineer
- E. Welch, Manager, Nuclear Electrical / Instrumentation and Control
Engineering Services
- R. Widell, Director, Nuclear Operations Site Support
"M. Williams, Nuclear Regulatory Specialist
Other licensee. employees contacted -included office, operations,
-engineering, maintenance, chemistry / radiation and corporate personnel.
Acronyms and initialisms used throughout this report are listed in the
last paragraph.
2. Review of.P! ant Operations (71707)
The plant continued in power operations (Mode 1) for the duration of this
Linspection,
a. Shift Logs and Facility Records (71707)
The inspector reviewed records and discussed various entries with
operations personnel to verify compliance with the Technical
Specifications (TS) and the licensee's administrative procedures.
p
,
,.
2
The following records were reviewed:
Shift Supervisor's' Log; Reactor Operator's Log; Equipment
Out-0f-Service Log; Shift Relief Checklist; Auxiliary . Building
Operator's Log; Active Clearance Log; Daily Operating Surveillance
Log; Work Request Log; Short Term Instructions (STI); and Selected
Chemistry / Radiation Protection Logs.
In addition to these record reviews, the inspector independently
verified clearance order tagouts.
No violations or deviation; were identified.
b. Facility Tours and Observations (71707)
Throughout the inspection period, facility tours were conducted to
observe operations and maintenance activities in progress. Some
operations ' and. maintenance activity observations were conducted
during backshifts. Also, .during this inspection period, licensee.
meetings were attended by - the inspector to observe planning and
management activities.
The facility tours and observations encompassed the following areas:
security perimeter fence; control room; emergency diesel generator
room; auxiliary building; intermediate building; battery rooms; and
electrical switchgear rooms.
During these tours, the following observations were made:
(1) Monitoring Instrumentation - The .following instrumentation
and/or indications 'were observed to verify that indicated
parameters were in accordance with the TS for the current
operational mode:
Equipment operating status; area atmospheric and liquid
radiation monitors; electrical system lineup; reactor
operating parameters; and auxiliary equipment operating
parameters.
No violations or deviations were identified.
L
(2) Safety Systems Walkdown (71710) - The inspector conducted a
walkdown of the emergency feedwater system (EF) to verify that
the lineup was in accordance with license requirements for
system operability and that the system drawing and procedure
correctly reflected "as-built" plant conditions.
No violations or deviations were identified.
7
. . .
3
-(3) Shift Staffing (71707) - The inspector verified that operating
shif t staffing was in accordance owith TS requirements and that
control room operations were being conducted in an orderly and
professional manner. In addition, the inspector observed shift
turnovers' on varinus occasions to verify the continuity of plant
status, operati."=1 problems, and other' portinent plant
information during these turnovers.
No violations or deviations were identified.
(4) Plant Housekeeping Conditions (71707) - Storage of material and
components and cleanliness conditions of various areas
throughout the facility were observed to determine whether
safety and/or fire hazards existed.
No violations or deviations were identified.
(5) Radiological Protection Program (71709) - Radiation protection
control' activities were observed to verify that these activities
were'in conformance with the facility policies and procedures,
and in compliance .with regulatory requirements. These
observations included:
-
Selected licensee conducted surveys;
-
Entry to and exit from contaminated areas including
step-off pad conditions and disposal of contaminated
clothing;
-
Area, postings and controls;
-
Work activity within radiation, high radiation, and
contaminated areas;
-
Radiation Control Area (RCA) exiting practices; and
-
Proper wearing of personnel mon;toring equipment,
protective clothing, and respiratory equipment.
Area postings were independently verified for accuracy by the
inspector. The inspector also reviewed selected Radiation Work
Permits (RWPs) to verify that the RWP was current and that the
controls were adequate.
The implementation of the licensee's As Low As Reasonably
Achievable (ALARA) program was reviewed to determine personnel
involvement in the objectives and goals of the orogram.
No violations or deviations were identified.
(6) Security Control (71881) - In the course of the monthly
activities, the inspector included a review of the licensee's
physical se:urity program. The composition of the security
organizatior, was checked to insure that the miaimum number of
guards were available and that security activities were
t
. .-_ . . _ . . . _. ._ -~
. ;
. , .
4
.
conducted with proper supervision. The performance of ~ various
shifts of the security force was observed in the conduct of
daily activities to include: protected and vital area access
controls;~ searching of personnel, packages, and vehicles; badge
' issuance and retrieval; escorting of visitors;- patrols; and
,
compensatory posts. In addition, the inspector observed the
operational status of Closed Circuit Television (CCTV) monitors,
-the Intrusion Detection system in the central and secondary-
alarm stations, protected area lighting, protected and vital
area barrier integrity, and the security organization interface
,
with cperations and maintenance.
No violations or deviations were identified.
(7) Fire Protection (71707) - Fire protection activities, staf fing,
and equipment were observed to verify that fire brigade staffing
- was appropriate and that fire alarms, extinguishing equipment,
actuating controls,- fire fighting equipment, emergency
equipment, and fire barriers were operable.
No violations or deviations were identified.
(8) Surveillance (61726) - Surveillance tests were observed to
verify that approved procedures were being used; qualified
personnel were conducting the tests; tests were adequate to
verify equipment operability;. calibrated equipment was utilized;
and TS requirements _were followed.
The following tests were observed-and/or data reviewed:
"o-1608, Functional and Operability Che P cf the
Containment Hydregen Monitoring WS-10-CE;
- SP-317, RC System Water Inventory Balance;
- SP-375A, Chilled Water Pump (IA) Quarterly Operability
Demonstration;
- SP-430, Containment Air Locks Seal Leakage Test;
- SP-711, Core Flood Tank "B" Monthly Surveillance Program;
and
^
- PT-319, Discharge Valve Positioning Verification.
(a) Procedure SP-1608 was reviewed to determine the licensee's
compliance with the TS. This procedure was written to
implement TS 4.6.4.1,
'
which requires the licensee to
perform a channel calibration on the containment hydrogen
analyzers at least once every 92 days. The inspector
noticed that this procedure did not include a check of the
analyzers' local alarms or the r earm annunciated on the
main control board ~in the control room. The TS definition
of a channel calibration encompasses the entire channel
including alarm functions. From a review o maintenance
{
. . - _ _ - - -_ _ _ _ _. -, _ - - -
. _ ._ _. _
-
4
n
.
~*
m, .
'
5
.
history for this instrumentation, the inspector determined '
that a check- of these alarms had not been performed since
the analyzers were installed in August 1983.
Through discussions with licensee engineering and operating
personnel, and a review..of the licensee's emergency
procedures, the._ inspector determined that the containment
hydrogen indication would be monitored following an-
accident and that the loss of alarm function. for this
monitor would not prevent the safety function of the
system. However, f ailure to include a check of the alarm
functions during the required channel calibration is
contrary to the requirements of TS 4.6.4.1 and is
considered to be a violation.
Violation (302/88-16-01): Failure to perform a channel
calibration on the containment hydrogen analyzers.
'
(b) Procedure SP-711 was written by the' licensee to implement
the requirements of TS 4.5.1.b to verify the boron
concentration in the core flood tanks. Thi: procedure
specifies that the boron analysis be perform d in
accordance with chemistry procedure CH-101, Determination
'
of Boron, Mannitol Complex Titration Method. During the
performance of this analysis on June 1, 1988, the inspector
noticed that the chemistry technician deviated from the
instructions provided in procedure CH-101. The technician
analyzed a sample volume of 10 milliliters (ml) while
procedure step 9.2.1 and Table 1 required a sample volume
of 25 ml. When questioned about this apparent
nonconformance, the technician stated that he had received
verbal _ instructions from his supervisor to perform the
analysis using 10 ml of sample and using a different
titration apparatus than specified by procedure CH-101.
The inspector met with the chemistry supervisor, who
confirmed the verbal instructions provided to the
technician.
Althou the sampling method used by the technician did not
appe. adversely affect the sample results, the use of
verbal instructions' vice written procedures to implement
the requirements of TS 4.5.1.b is contrary to the
requirements of Regulatory Guide (RG) 1.33, November 1972,
Section J, and is considered to be a violation of TS
6.8.1.a.
Violation (302/88-16-02): Failure to adhere to the
requirements of procedure CH-101.
\
l
, ,. .
.
6
(c)L During the performance of procedure SP-375A, the inspector
was informed by the technician performing the procedure
that the point "C" identi fied L by the machine sketch
provided in the procedure did not indicate a pump bearing,
but rather the location of. a packing gland. The licer.see
was etilizing this location for measuring the pump bearing
vibration and temperature specified by the ASME Boiler and
Pressure Vessel ~ Code,Section XI.
This information was discussed with licensee engineering
persennel who provided the inspector with the pump'r
technical manual. This type of pump- does not contain a
pump bearing, but utilizes 'cwo bearings on the pump's
driver (motor) for support. Although, this procedure is
performed by the licensee for information purposes only, in
accordance with NRC relief request V-370 to the licensee's
proposed inservice testing program, the inspector
considered it prudent to record the vibration and
temperature measurements on the motor bearing closest to
the pump as required by ASME Section XI, Article IWP-1200.
Licensee representatives agreed with the inspector's
comments and stated that they would make appropriate
changes to procedure SP-375A and the redurdant B train
SP-375B test procedure.
IFI (302/88-16-03): Review the revision to SP-375A/B to
take bearing vibration and temperature measurements on the
motor bearing closest to the pump.
(d) During the performance of_ procedure PT-319, the inspector
noticad wide variations in the flow ratt for the temporary
flow monitoring instrument on the nucleac services seawater
(RW) system. Also, the indicated flow cpoeared to be much
lower (approximately 1000 gpm) than measured flows during
previous tests. Troubleshooting of- this indication by the
licensee revealed that the flow element nad been damaged
during insertion into the system and silt had accumulated
in the element.
Further inspection by the licensee revealed that the RW
system piping was also slightly damaged during the process
of inserting the flow element. The inspector observed
liceresee personnel perform an ultrasonic test of this
piping to determine the extent of damage. Although the
results of this test showed no sig11ficant deformation of
the piping, the protective lining used on tFis piping to
prevent corrosion could have been damaged. Tie licensee
plans to perform periodic ultrasonic testing of the piping
to determine if corrosion is occurring more rapidly than
expected. The licensee also plans to develop a procedure
. . n .. - - , . -.
N , ,
-
.
-.
7
to address the installation and precautions necessary for
use of this type of flow element,
IFI (3'02/88-16-04): Review the1 licensee's activities to
develop a procedure for use of flow measuring devices in
the RW system and periodic ultrasonic-testing of RW system
piping.
(e) NRC Region II personnel met with the FPC staff to discuss
the. status of surveillance program improvements in light of
the pervious SALP 3 rating. The licensee described its
overall surveillance improvement program, which included:
-
instituting a new computerized Surveillance Tracking
- System to address deficiencies in the area of
surveillance scheduling,
-
adopting a ',' system engineer" concept which identifies
a single point of contact for each system in an effort
to. develop expertise in engineers who write
'
,
procedures, and
-
rewriting surveillance procedures, as necessary, and
implementing a verification and validation program to
confirm the adequacy of surveillance procedures.
From discussions with the licensee, management attention to
surviellance was evident.
(9) Maintenance Activities (62703) -
The inspector observed
maintenance activities to verify that correct equipment
clearances were in effect; work requests and fire prevention
work permits, as required, were issued and being followed;
quality control personnel were available for inspection
activities as required; and TS requirements were being followed.
Maintenance was observed and work packages were reviewed for the
following maintenance activities:
-
Replacement of the power supply for the "D" channel of the
reactor protection system in accordance with procedures
MP-531, Troubleshooting Plant Equipment, SP-110, Reactor
Protective System Functional Testing, SP-312, Heat Balance
Calculations, and SP-113, Power Range Nuclear
Instrumentation Calibration;
-
Calibration of the waste gas release flow transmitter
(WD-19-FT) in accordance with procedure SP-168, Radiation
Monitoring Flow Rate Instrumentation Calibration;
-
Ultrasonic testing for nuclear services arid decay heat
seawater piping degradation; and
a
-
. .
- '
.
.
8
,
l
-
Troubleshooting of containment hydrogen analyzer (WS-10-CE)
"Standby" indication in accordance with procedure MP-531.
1
. No violations or deviations were identified. i
l
,(10) Radioactiv'e' Waste Controls (71707) - Selected liquid and gaseous
releases were observed to verify that approved procedures were I
utilized, that ' appropriate release approvals were obtained, and '
that required surveys were taken.
No violations or deviations were identified. l
(11) Pipe Hangers and Seismic Restraints (71707) - Several pipe
hangers and. seismic restraints (snubbers) on safety-related
systems were observed to insure that fluid levels were adequate
and no leakage was evident, that restraint settings were
appropriate, and that anchoring points were not binding.
No violations or deviations were identified.
3. Review of Licensee Event Reports (92700) and Nonconforming Operations
Reports (71707)
a. Licensee Event Reports (LERs) were reviewed for potential generic-
. impact, to detect trends, and to determine whether corrective actions
appeared appropriate. Events which were reported immediately were
reviewed as they occurred to determine if the TS were satisfied.
LERs 87-22, 87-28, 88-03, 88-04, 88-11, and 88-12 were reviewed in
accordance with the current NRC Enforcement policy. LERs 87-22,
87-28, 88-03 and 88-04 are closed.
(1) (Closed) LER 87-22: This LER reported an Engineered Safeguards
(ES) actuation that occurred while electricians were installing
an e ctrical jumper across a pressure switch. The licensee has
revised procedure SP-178, Containment Leakage Test - Type "A",
Including Liner Plate, (revision 13 dated May 3, 1988) to
L require the use of jumper leads with insulated connections.
l
l (2) (Closed) LER 87-28: This LER reported an ES system actuation
which occurred during the operation of a vital bus transfer
switch and inverter manual bypass switch. The licensee has
completed the operator training on proper switch operation, and
has provided a schematic diagram of the vital bus power supplies
in the inverter rooms.
(3) (Closed) LER 88-03: This LER reported that a surveillance
procedure was not adequate to implement the 31 day containment
in+egrity verification required by TS 4.6.1.1. The licensee has
implemented enhancements to their TS amendment review process
which will include a list of other technical specifications
requirements most likely affected by the amended specifica+1on.
-
1
,
s
.
. . .
,
9
. (.4 ) (Closed) LER ' 88-04: This LER reported that the weekly channel
check of the incore detector system was not completed within the
required frequency and that the 1.nitial data collected was not
evaluated 'to determine system operability. The licensee has
removed the applicable channel check instructions from procedure
SP-433, Incore Backup Recorder Calibration, and has incorporated
these instructions'in procedure SP-438, Incore Neutron Detectors
Channel Check. This new procedure has been assigned to reactor
engineering for accomplishment.
LERs 88-11 and 88-12 will remain open for the following reasons:
,
(5) (0 pen) LER 88-11: This LER reported that the inservice testing
program valve stroke tot was not performed during the first
three months of 1988 as required by TS 4.0.5. The licensee
identified this matter during a routine review of surveillance
procedures. To prevent recurrence of this event, the licensee
will revise procedure SP-443, Master Surveillance Plan, to
specify surveillance tests subject to the ASME Section XI test
frequencies. The licensee plans to implement this procedure
change by July 15, 1988. This matter is considered to be a
licensee identified violation in which appropriate corrective
action was taken to prevent recurrence.
(6)' (0 pen) LER 88-12: This LER reported the inadequate electrical
isolation betdeen reactor coolant system hot leg. temperature
instruments in the control room and remote shutdown panel. The
licensee identified this matter during an engineering design
review. Upon discovering this situation, the licensee verified
that a previously established roving fire watch was in effect
and continued this compensatory measure until electrical
separation could be provided for this instrumentation. The
licensee installed modifications MAR 82-05-03-06, FCN-23, and
MAR 82-05-03-01, FCN-36A, to provide the required electrical
isotation. This matter is considered to be a licensee
identified violation in which appropriate corrective action was
taken to prevent recurrence.
The licensee's corrective action associated with this event will
include a detailed review of other modifications that interface
with the remote shutdown panel to determine if similar problems
exist. This review will be completed by June 10, 1988. This
LER will remain open pending completion of this corrective
action,
b. The inspector reviewed Nonconforming Operations Reports (NCORs) to
verify the following: TS are complied with, corrective actions as
identified in the reports or during subsequent reviews have been
accomplished or are being pursued for completion, generic items are
identified and reported as required by 10 CFR Part 21, t.nd items are
reported as required by TS.
k
.. - - .
.=. .
.
10
All NCORs were reviewed in accordance with the current NRC
Enforcement Policy.
.e (1) NCOR 88-69 reported that on May 14, 1988, the maximum
permissible liquid release rate specified by liquid - radwaste
release permit number L 88-160 was exceeded. This release was
being performed in accordance with procedure OP-407H, Operation
of the Laundry and Shower Monitoring Tanks, which requires in
step . 3.2.S.5 that the release rate specified on the release
permit not be exceeded. The actual release rate of 36 gpm
exceeded the maximum release rate permitted of 34'gpm. Further
review of the post-release records,- however, indicated that no
radiological limits ware exceeded by this event.
The licensee attributed the cause for this event to be the use
of chart paper on the release recorder that indicated only half
of the actual flow. This event is similar to an event which
occurred in September 1987 and was the subject of a NRC
violation (Violation 302/87-30-02). The licensee's corrective
. action for this violation was documented in a response letter to
the NRC dated November 18, 1987, and included, inpart, ordering
new chart paper for the flow rate recorder to indicate the
correct release flow rate.
This corrective action was insufficient to prevent recurrence of
this event. Failure to provide adequate corrective actions is
contrary to the requirements of 10 CFR Part 50, Appendix B,
Criterion XVI and is considered to be a violation.
-
Violation (302/88-16-05): Failure to provide adequate
corrective actions to prevent exceeding the maximum release rate
for a liquid radwaste release.
(2) NCOR 88-77 reported that a fire service valve (FSV-14) was found
in the closed position vice the open position required by plant
procedures. The licensee discovered this . situation during the
removal of an equipment clearance (CL-88-05-106) and discovered
that this valve was inadvertently closed during the
implementation of the clearance which specified that a nearby
valve (FSV-13) be closed. The improper implementation of the
clearance rendered two of three fire service pumps out of
service for approximately one day. The TS allows up to 7 days
of operation with only one fire service pump.
As part of their corrective actions associated with this event,
the licensee is reviewing procedures to determine if the
requirement for independently verifying the implementation of
equipment clearances needs clarification. This matter is
considered to be a licensee identified violation in which
\
_ -
. . -* *
..
,
11
'
appropriate corrective action will be taken to prevent
recurrence.
IFI (302/88-16-06): Review the licensee's activities to clarify
the requirements .to provide independent verification of
equipment clearances,
e
4. Design, Design Changes and Modifications (37700) -
Installation of new or modified systems were reviewed to verify that the
changes were reviewed and approved. in accordance with 10 CFR 50.59, that
the changes were performed in accordance with technically adequate and
approved procedures, that subsequent testing and test results met
acceptance criteria or deviations were resolved in an acceptable manner,
and that appropriate drawings and facility procedures were revised as
necessary. This review included selected observations of modifications
and/or testing in progress.
The folicwing l modification approval records (MARS) were reviewed and/or
associated testing observed:
-
Separation of hot leg temperature instrumentation between the remote
shutdown panel and the control room in accordance with modifications
MAR 82-05-03-06, FCN-23, and MAR 82-05-03-01, FCN-36A and functional
test in accordance with procedure TP#11A, RC-004A-TE1 and RC-0048-TE4
Isolation Module; and
-
Installation and test of the containment high range radiation monitor
recorder in accordance with MAR 84-08-10-07, FCN-29A and functional
test in accordance with procedure TP#48, MAR Functional Test for RNR
Recorders and Indicator Verification / Calibration.
5. NUREG 0737 - TMI Task Action Plan Item Review (92701)
The licensee's activities associated with the TM1 Task Action Plan Item
II .E.1.1.,
2 , Auxiliary Feedwater System Evaluation, were reviewed. The
licensee has completed construction of the emergency feedwater tank and
has submitted the Probability Risk Analysis (PRA) for the emergency
feedwater system in a letter to the -NRC dated December 2,1986. The
inspector performed a walkdown of the completed tank and verified that the
licensee's system drawings and procedures reflect the "as built" plant
i
configuration. The licensee's action on this item is complete and this
item is considered closed.
6. Review of Offsite Review Committee Activities (40701)
-The inspector attended a meeting and reviewed the activities of the
'
. licensee's offsite review committee, the Nuclear General Review Committee
<
(NGRC). This review included a determination that TS requirements were
being met uith regard to the following:
\
.t
~
.,, '4 '
_
12
-
Commi ttee' quo' rum;
-
Committee composition with respect to disciplines and' expertise;
-
Qualification of committee members; and
- :
Review activities of the committee.
No violations or deviations were identifled.
.7. - Licensee Action on - Previously Identified Inspection Findings (92702 &
92701)
a, (Closed) Violation 302/87-40-01, Failure to Perform Certifications on
Active Clearances as Required by Procedure CP-115
The licensee has revised the distribution list for notification of
open clearances, issued a memorandum dated December 9, 1987,
emphasizing clearance holder responsibilities, and reviewed this
event with operators.
b'. (Closed) Deviation 302/87-19-01, Failure to Meet a Commitment as-
Stated in the Response Letter to Violation- 302/86-31-01 Dated
January 22, 1987-
The licensee has combined its two separate tracking systems to avoid
similar incidents from occurring. In addition, the FSAR was revised
on February 1, 1988, revision 9, to include descriptions for the
normal operation of cooling water systems thct supply cooling water
for.the makeup pumps.
-c. (Closed) .FI 302/86-38-13, Review Completion of Licensee's Long-term
Protective Measures for Sulfur Dioxide Tanks
Corrective actions were . verified as complete, as stated in NRC
Inspection Report 50-302/87-28, with the following exceptions:
-
installation of improved door and damper seals to reduce
inleakage into the control room; and
-
installation of control logic to reposition the control complex
HVAC system dampers to the recirculation mode in the event toxic
gas is detected at the storage tanks' local monitors.
The licensee completed these modifications in accordance w1th MAR
85-03-10-01. The inspector reviewed the completed modification
package, including work requests and test procedures, and where
possible, conducted visual observations to verify the modification.
The inspector considers action on this item complete,
d. (Closed) IFI 302/88-11-05, Follow the Licensee's Troubleshooting
Activities Associated with Reactor Protection System (RPS) Channel
"0"
1
L .
- -- - - ------ __ ---_ -- . _ _ _ - - - - - - - - - . _ - - - _ _ - - _ _ _ _ _ _
.
,.4
^
^ 13
The licensee has-identified the most probable cause for the spurious
trips to be. due to a faulty power supply. The power supply has
subsequently been replaced,
e. (Closed); IFI 302/88-01-04, Review the Licensee's Flow Measurement
Test to -Verify Discharge Valve Throttling Method and Pump
Ferformence.
The. inspector ob' served the performance of the flow measurement test
conducted in accordance with procedure PT-319, Discharge Valve
Positioning Verification. This test verified that the discharge-
valve throttling ' method used provided consistent results and that
pump performance did not significantly vary with tide level.
f. (Closed) IFI 302/86-38-07', Review the Licensee's Progress in
Developing ~ Maintenance Procedures to Cover Certain Electrical
Equipment.
The licensee has implemented proce'dures PM-130, Static Inverters, and
MP-152, Performance Checks of Power Supplies, to direct maintenance
activities on the vital inverters. The licensee has decided not to
develop an electrical maintenance procedure for the Emergency Diesel
Generators (EDG) since no significant maintenance has been performed
on these electrical generators in the past. Instead, the licensee
.has implemented a preventive maintenance procedure for this
equipment,. PM-123, Periodic Electrical Checks of Emergency Diesel
Generators, to - direct the periodic maintenance performed or the
EDG's.
g. (Closed) Deviation 302/87-40-03, Failure to Install a Recording
Display as Committed to Meet Regulatory Guide 1.97.
The inspector reviewed and verified the implementation of the
corrective actions stated in FPC's letter of March 16, 1988.
-
The
inspector reviewed modification MAR 84-08-10-07, FCN-29A and
functional test procedure TP#4B which installed and tested the
containment high range radiation monitor recorder.
7. Exit Interview (30703)
The inspector met with licensee representatives (denoted in paragraph 1)
at the conclusion of the inspection on June 8,1988. During this meeting,
the inspector summarized the scope and findings of the inspection as they
are detailed in this report with particular emphasis on the violations and
IFI's.
-The licensee representatives acknowledged the inspector's comments and did
not identify as proprietary any of the materials provided to or reviewed
by the inspectors during this inspection.
- - - -
_
.
i(
.
.S.- ,
14
-
During the exit meeting, licensee representatives stated that they may.
.take exception _to the violation described in paragraph 2.b,(8)(b) of.this
~
'
-report_'~ regarding the applicability .of RG 1.33 . to certain chemistry
procedures.
8. . -Acronyms and Abbreviations
^ALARA - As Low.As Reasonably Achievable
ASME - American Society of Mechanical Engineers
CCTV ~- Closed Circuit Television
EDG - Emergency Diesel Generators
EF -
Emergency Feedwater
ES ' - Engineered Safeguards
- FPC - Florida Power Corporation
-FSAR -
. Final Safety Analysis. Report
IFI -
Inspector Followup Item
.LER -
Licensee Event Report
MAR -
~ Modification Approval Record
ml -
' Milliliters
NCOR - Nonconforming Operations Report
NGRC - Nuclear. General Review Committee
NRC- -
Nucleai Regulatory Commission
PRA - Probablility Risk Analysis
RCA -
Radiation Control Area
RG -
Regulatory Guide
RPS -
Reactor Protection System '
RWP -
Radiation Work Permit
SALP -
Systenatic Assessment of Licensee Performance
STI -
Short' Term Instruction
TMI -
Three Mile Island
TS -
Technical Specification
t
-
.