Text
-
,-
-
--
-
>-
UNITED STATES
[4- p% E800g'o4
,
NUCLEAR REGULATORY COMMISSION
'
.. t
REGION 11
.
o
r
$'
j
101 MARIETTA STREET,N.W.
ATL ANTA, GEORGI A 30323
9*****ho
4
20$
Report No.:. 50-302/88-15
Licensee: Florida Power Corporation-
3201 34th Street, South
St. Petersburg, FL 33733
Docket No.: 50-302
License No.: DPR 72
Facility Name:
Crystal River 3
Inspection Conducted: June 7-9, 1988
Inspector:
- dev
7
0
86
W. M. Sartor, Jr.g
Date Signed
Accompanying Personnel:
G. Arthur
P. Hcimes-Ray
Approved by:
b'
/d
'( -
//BS
T. R. Decker, Section Chief
Date Signed
Division of Radiation Safety and Safeguards
SUMMARY
,
Scope: This routine, announced inspection involved the observation and
evaluation of. key emergency and organizational functions and locations during
this partial . participation exercise (full participation by risk counties and
~ FEMA evaluated).
Results: Two exercise weaknesses were identified in the areas of properly
classifying the emergency conditions and providing dose assessment data on a
.
,
timely basis.
Notwithstanding these findings, the licensee staff demonstrated
that they would be able to satisfactorily respond to an emergency at the
facility.
f
l
l
!
'
,
l
8808030158 080720
~
ADOCK 05000302
,
G
PNU
.
,
. - - , . , . . -
-
.. _ . . . . - . _ _ . - _ _ . _ _ . _ . _ _ _ . . _ _ . - . , , _ . _ . . - , . _ . . - ~ . . . - . - ~ . . . _ _ . _ .
-
.
,
.
.
REPORT DETAILS
1.
Licensee Employees Contacted
- A. Auner, Manager, Nuclear Technical Training
- R. Browning, Health Physics Supervisor
- S. Chapin, Radiological Emergency Planning Specialist
- R. Fuller, Senior Nuclear Licensing Engineer
- D. Harper, Nuclear Regulatory Specialist
- B. Hickle, Manager, Nuclear Plant Operations
- S. Johnson, Manager, Site Nuclear Services
- L. Kelly, Manager, Nuclear Training
- J. Laycock, Radiological Emergency Planning Specialist
- G. Longhouser, Security Superintendent
- P. McKee, Director Plant Operations
,
- L. Moffott, Nuclear Safety Supervisor
- S. Powell, Supervisor Quality Systems
- V. Roppel, Manager, Nuclear Maintenance and Outages
- E. Renfro, Director, Emergency Operations Facility
- S. Robinson, Chemistry / Radiological Superintendent
- J. Smith, Nuclear License Training Supervisor
- K. Spilios, Health Services Representative
- J. Stephenson, Supervisor, Radiological Emergency Planning
- E. Welch, Manager, Nuclear Electrical /I&C Engineering Services
- R. Widell, Director, Nuclear Operations Site Support
- D. Wilder, Radiation Protection Manager
- W. Wilgus, Vice President, Nuclear Operations
- D. Worley, Nuclear Chemistry Manager
Other licensee employees contacted during this inspection included
engineers, operators, security force members, technicians, and office
personnel.
Nuclear Regulatory Coninission
- P. Holmes-Ray, Senior Resident inspector
- T. Stetka, Senior Resident Inspector
- J. Tedrow, Resident Inspector
- Attended exit interview
,
2.
Exercise Scenario (82301)
The scenario for the emergency exercise was reviewed to assure that
provisions were made to test the integrated capability and a major portion
of the basic elements defined in the licensee's emergency plan and
organization pursuant to 10 CFR 50.47(b)(14), Paragraph IV.F of Appendix E
to 10 CFR 50, and specific guidance promulgated in Section II.N of
r
'
,
,
'
.
.
2
.The scenario was reviewed in advance of the scheduled exercise date with
no major problems identified.
Minor inconsistencies noted during the
exercise failed to detract significantly from the overall performance of
thc licensee's emergency organization.
'
- No violations or deviations were identified.
3.
Assignment Of Responsibility (82301)
This ' area was- observed to assure that primary responsibilities for-
emergency response by the licensee were specifically established, and that
adequate staff was available to respond to an emergency pursuant to
10CFR-50.47(b)(1), Paragraph IV.A of Appendix E 'to 10 CFR 50, and
specific guidance promulgated in Section II.A of NUREG-0654.
The inspector observed that specific emergency assignments were made for
the licensee's emergency response organization, and that adequate staff
was available to respond to the simulated emergency.
No violations or deviations were identified.
4.
Emergency Response Support and Resources (82301)
This area was observed to assure that the following arrangement for
requesting and effectively using assistance resources were made pursuant
to 10 CFR 50.47(b)(3); Paragraph IV. A of Appendix E to 10 CFR 50, and
guidance
promulgated
in
Section II.C of NUREG-0654,
namely:
(1) accomodation of selected State emergency response representatives at
the
licensee's
near-site
Emergency Operations
Facility;
and
(2) identification of organizations capable of augmenting the planned
response.
Representatives of the State of Florida and designated counties were
accommodated in the licensee's Emergency Operations Facility (E0F) and
Emergency News Center (ENC).
Licensee contact with offsite organizations
was prompt, effective, and consistent with the scope of the exercise.
Assistance resources from State and local agencies were available to the
licensee.
No violations or deviations were identified.
5.
Emergency Classification System (82301)
This area was observed to assure that a standard emergency classification
and an emergency action level matrix was in use by the nuclear facility
licensee pursuant to 10 CFR 50.47(b)(4), Paragraph IV.C of Appendix E to
10 CFR 50, specific guidance promulgated in Section II.D of NUREG-0654,
and IE Information Notice 83-28.
The licensee's emergency plan and implementing procedures provided for the
standard classification of emergencies using NUREG-0654 as it basis.
-
.
.
.
-
iq.
,
3
However,- the onsite emergency response organization failed to demonstrate
proficiency in recognizing and classifying emergency conditions as listed
-in the_EAL matrix.
Specifically, the exercise controllers prompted the
Site _ Area Emergency declaration when exercise participants failed to
promptly declare a SAE based on greater than 50 mR/hr at the site boundary
for greater than 30 minutes.
This failure to fully meet the exercise
objective' of demonstrating an understanding of EALs and proficiency in
recognizing and classifying emergency conditions.in the TSC was noted as
an exercise weakness (Corrective action to this finding will be tracked by
IFI 50-302/88-15-01).
No violations or deviations were identified.
6.
Notification Methods And Procedures (82301)
This area was observed to assure that procedures were established for
notification of State and local response organizations and emergency
personnel by the licensee, and that the content of initial and followup
messages to response organizations were established.
This area was
further observed to assure that means to provide early notification to the
populace within t% plume exposure pathway were established pursuant to
10 CFR 50.47(b)(5), Paragraph IV.D of Appendix E to 10 CFR 50, and
specific guidance promulgated in Section II.E of NUREG-0654.
The inspector observed that notification methods and procedures were
established and available for use in providing information regarding the
simulated emergency conditions to Federal, State, and local response
organizations, and to alert the licensee's augmented emergency response
organization. Notification to the State of Florida and designated of fsite
organizations appeared to be made in accordance with procedures with the
following exceptions:
(1) the Alert notification to the State Warning
Point was not initiated until 17 minutes after the Alert; (2) the
Emergency Coordinator did not review all notification messages; and
(3) State Notification forms for the Site Area Emergency were not
completoly filled cut (i.e. time and person notified was missing).
Corrective action to these findings will be tracked by IFI
50-302/88-15-02.
No violations or deviations were identified.
7.
Emergency Communications (82301)
This area was observed to assure that provisions existed for prompt
communications among principal response organizations and emergency
personnel pursuant to 10 CFR 50.47(b)(6), Paragraph IV.E of Appendix E to
10 CFR 50, and specific guidance promulgated in Section II.F of
The inspector observed communications within and between the licensee's
emergency facilities, the licensee and offsite agencies, and the offsite
environmental monitoring teams and the E0F. The inspectors also observed
._
__
_ . _ _ _ .
_ _ _ _ _ _ _
._ ________ ___ __ _ - _-_ ____
.
..
,
.
.
4
information flow among the various groups within the licensee's emergency
-organization.
Emergency communications involving notification of the
State, local agencies and the NRC of all Emergency classifications
discussed above, . appeared adequate and consistent with the Radiological
Emergency Plan and Implementing Procedures except as noted above.
No violations or deviations were identified.
8.
Accident Assessment (82301)
This area was observed to assure that adequate methods, systems, and
equipment for assessing and monitoring actual or potential offsite
consequences of a radiological emergency condition were in use as required
by 10 CFR 50.47(b)(9), Paragraph IV.B of Appendix E to 10 CFR 50, and
specific guidance promulgated in Section II.I of NUREG-0654.
The accident assessment program included an engineering assessment of
plant status, and an assessment of radiological hazards to onsite and
offsite personnel resulting from the accident. During the exercise it was
noted by the inspector that timely and correct offsite dose projection
data was not available in the E0F.
The licensee also noted in their
critique that dose assessment data was not available on a timely basis.
The NRC inspection identified these observations as a significant concern
that required early corrective action.
In a brief meeting held after the
formal exit interview, the licensee committed to an increased dose
assessment training effort followed by a mini drill of the dose assessment
portion of the emergency organization.
The licensee also committed to
inform the NRC of the schedule of the drill. This finding was identified
as an exercise weakness and the corrective action will be tracked by
IFI 50-302/88-15-03.
No violations or deviations were identified.
9.
Exercise Critique (82301)
The licensee's critique of the emergency exercise was observed to
determine that shortcomings identified as part of the exercise, were
brought to the attention of management and documented for corrective
action pursuant to 10 CFR 50.47(b)(14), Paragraph IV.F of Appendix E to
10 CFR 50, and specific guidance promulgated in Section II.N of
A formal critique was held on June 9,1988, with exercise controllers and
evaluator,, licensee management, and NRC representatives.
Findings
identified during the exercise designated for licensee corrective action
were discussed.
Licensee action on identified findings will be reviewed
during subsequent inspections.
The licensee's critique was sufficiently
detailed and appeared to be consistent with regulatory requirements and
guidance cited above.
Immediately following the exercise critique a short
meeting was held to discuss the scope of early corrective action needed to
__
___
_
-
.
.
.
.
5
address -the dose assessment concerns identified in Paragraph 8 of this
report.
No violations or deviations were identified.
10. Federal Evaluation Team Report
The report by the Federal Evaluation Team (Regional Assistance Committee
and Federal Emergency Management Agency, Region IV Staff) concerning the
5
activities of offsite agencies during the exercise will be forwarded by
separate correspondence.
11. Licensee Action On Previous Enforcement Matters (92701)
(Closed) Violation (50-302/87-36-01):
Emergency Plan Implementing
Procedure EM-202 did not implement the Emergency Plan for the emergency
classification of an "all alarms lost" condition; the annotated copy of
EM-202 used during the Alert declaration on October 16, 1987, with the
"all alarms lost" condition was not retained. The inspector reviewed the
revised EM-202 and found it to-implement the Emergency Plan for the "all
alarms lost" condition; personnel interviewed by the inspector were aware
of the need to retain completed copies of emergency procedures.
12. Exit Interview
The inspection scope and results were summarized on June 9,1988, with
those persons indicated in Paragraph 1.
The inspector described the areas
inspected and discussed in detail the inspection results listed below. No
dissenting comments were received from the licensee.
The licensee did not identify as proprietary any of the material provided
to or reviewed by the inspector during this inspection.
Item Number
Description and Reference
302/88-15-01
IFI - TSC failed to demonstrate
understanding of EAL's and proficiency in
recognizing
and
classifying emergency
conditions.
302/88-15-02
IFI - Alert notification to State not
initiated in 15 minutes; all notification
messages not received by EC; State forms
lacked time and person notified.
302/88-15-03
IFI - Dose assessment data not available on
a timely basis.
f
Attachment:
Exercise Scope, Objectives and
Listing of Events
,
i
!
!
..
.
. . . .
.
_
'
.
.
.
'
.
.
.
1988 ANNUAL RADIOLOGICAL EMERGENCY RESPONSE PLAN EXERCISE
PURPOSE
The purpose of this Exercise is twofold:
to test the state of
emergency prepa' redness of Crystal River Unit 3 (CR-3), the Florida
Power Corporation (FPC) Corporate Emergency Response Organization,
and the State and local response organizations; and to meet the
annual Exercise requirement for licensees as. defined in 10CFR50,
Appendix E.
SCOPE
The Exercise will be a "partial participation exercise."
The
State's Division of Emergency Management (DEM) and Department of
Health and Rehabilitative Services (DHRS) will participate only to
the degree necessary to test directi6n and control functions.
The
State will provide a limited staff in the State's Emergency
Operations Center and at FPC's Emergency Operations Facility.
The
response organizations of the risk counties will participate
fully.
The Exercise will simulate events that will initiate a minimum of
three of the four emergency classifications.
The Exercise will'be conducted in a manner that simulates actual
,
emergency conditions as close.'.y as possible,
~
,
.
Throughout the Exercise events may be scheduled such that two or
more drills may be conducted simaltaneously.
Implementation will occur via Message Cards that will be provided
to Exercise participants by Implementors.
The Message Cards will
contain information that will require the participants to evaluate
conditions and initiate specific emergency responses.
Incorrect
response, or failure to respond within a reasonable time, will be
corrected.
The correction will be provided both as on-the-spot
training, and as a method for keeping the Exercise on schedule.
All corrections and prompts will be documented.
The Exercise will be formerly critiqued by participants and
Implementor / Evaluators.
The purpose of this critique will be to
evaluate the performance of response organizations, and to
determine the degree to which exercise objectives were met.
J
T
-
.
,
'
.
.
EXERCISE OBJECTIVES
,
NOTE: The information contained in the brackets ([]) after the
stated objective represents a cross reference to the
Exercise Element Matrix contained in FPC Procedure P.EP-06,
"Schedule for Radiological Emergency Plan Maintenance".
This~ Matrix is cross-referenced to elements listed in
,
OPERATIONS OBJECTIVES
1.
Demonstrate the understanding of Emergency Action Levels
(EALs) and proficiency in recognizing and classifying
emergency conditions.
.
'
2.
Demonstrate accident assessment and mitigation in the Control
Room, including recognition of ' degrading plant conditions,
evaluation of plant conditions, and recommendation of
specific corrective actions to stabilize the plant.
3.
Demonstrate the ability to perform 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> emergency
notifications, as required, to the State o! Florida, local
authorities, and the Nuclear Regulatory Gummission. (E.3,
E.4, F.la, F.ic, J.7)
' ' :
4.
Demonstrate'an effective turnover of Emergency Coordinator
responsibilities between the Shif t SupervAsor and the
Director, Nuclear Plant Operations or Man-On-Call.
ONSITE EMERGENCY RESPONSE CRGANIZATION OBJECTIVES
1.
Demonstrate the capability for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ("off hours")
emergency response. (A.le, K.2, N.1h]
2.
Demonstrate effective implementation of EM-206, "Emergency
Plan Roster and Notification". [B.5, F.le)
3.
Demonstrate site evacuation and provisions to warn all
personnel within the Owner Controlled Area. [J.1)
4.
Demonstrate accident assessment and mitigation capabilities
in the Technical Support Center (TSC). (B.7a]
5.
Demonstrate adequate management and control of onsite
emergency response ca9 abilities.
6.
Demonstrate an understanding of EALs and proficiency in
recognizing and classifying emergency conditions in the TSC.
7.
Demonstrate an effective transfer of notification
responsibilities from the Emergency Coordinator to the EOF
Director when the Emergency Operations Facility is
activated.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
,
.
,
-
.
8.
Demonstrate the effectiveness and control of the Emergency
Repair Team and the plant Fire Brigade.
9.
Demonstrate the receipt and analysis of all field monitoring
data and coordination of those results with non-FPC agencies
at the EOF.
(H.12)
.
10.
Demonstrate the effectiveness and control of the Medical
Emergency Team. [L 2)
,
11.
Demonstrate the communications link to offsite medical
facilities (fixed or mobile). [F.2]
12.
Demonstrate provisions and/or decision-making capability for
utilization of evacuation routes. (J.2]
CORPORATE EMERGENCY RESPONSE ORGANIZATION OBJECTIVES
1.
Demonstrate the capability for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ('Off hours")
response. [A.le, N.lb)
2.
Demonstrate effective implementation of REP-02, "Activation
and Notification of the Corporate Emergency Response
Organization". [F.le]
3.
Demonstrate the capability to dispatch an FPC representative -
to principal governmental Emergency Operations Centers.
,
[C.2b)
,
4.
Demonstrate the ability to establish command and control
authority, and the ability to maintain continuity of
authority throughout an emergency at CR-3,
5.
Demonstrate the ability to establish and maintain appropriate
communications with State and Federal emergency management
representatives including the recommendation of protective
actions. (B.7b, F.1d]
S.
Demonstrate the ability to formulate a recovery /re-entry
plan. (B.7a, H.3]
i
RADIOLOGICAL CONTROL OBJECTIVES
l
l
1.
Demonstrate the ability to perform radiological monitoring
and assessment in the plant and site environments. [I.7,
I.9,
H.7)
2.
Demonstrate effective estimation and assessment of a
(simulated) release o.1 airborne radioactivity to the
environment, including formulation of onsite/offsite
radiological dose projections. (I.3a, I.10]
.-
3.
Demonstrate the ability to provide the Emergency Coordinator,
the EOF Director, or the Emergency / Recovery Director timely
and sound emergency protective action recommendations. (I.10]
_ _ _ _ _ _ _ _ _ _ _ - -
'
.
~
.
.
4.
Demonstrate the availability and operability of emergency
supplies and equipment.
CHEMISTRY AND WASTE MANAGEMENT OBJECTIVES
1.
Demonstrate the ability to utilize emergency sampling
procedures and equipment in response to an accident at CR-3
(samples will be simulated)
t
ENGINEERING OBJECTIVES
1.
Demonstrate the capability of ascertaining the need for, and
requisitioning, parts and components that will be used during
recovery and corrective maintenance of damaged equipment.
2.
Demonstrate the ability to use and coordinate engineering
support as outlined in REP-02,
4
SECURITY OBJECTIVES
1.
Demonstrate the ability to perform accountability onsite,
within 30 minutes of a site evacuation. (J.5)
2.
Demonstrate the capability of providing timely access into
the CR-3 protected area to non-FPC personnel who are part of
the accident response.
3.
Demonstrate the capability of maintaining, site security
'
throughout an emergency at CR-3, including the capability of
establishing and enforcing access control points.
4.
Demonstrate Security escort capabilities.
5.
Demonstrate security control during an in plant emergency.
INFORMATION SERVICES OBJECTIVES
1.
Demonstrate timely activation of the Emergency News Center.
2.
Demonstrate the ability to obtain emergency related
information. (B.7c]
3.
Demonstrate the ability to prepare and distribute news
releases in a timely manner. (B.7c]
4.
Demonstrate coordination of news release preparation and
release with State and County Public Information Officers.
(B.7c]
5.
Demonstrate the ability to conduct news briefings for the
media. (B.7c]
6.
Demonstrate the ability to respond to telephone inquiries
concerning an emergency at CR-3 and to direct these inquiries
to the proper source for resolution. (B.7c]
1
n
,
.
.
'
.
1988 RADIOLOGICAL EMERGENCY RESPONSE PLAN EXERCISE
'
LISTING OF EVENTS
0440 Initial conditions distributed to control room operators
0450 Control room receives a report of a fire in the Health
Physics Calibration Lab (95* elevation Control Complex).
The
fire alarm is sounded and,the Fire Brigade is dispatched.
0500 The Fire Brigade arrives at the scene to discover smoke and
flames in-the area. An individual nearby reports seeing 2-3
people in the vicinity before the fire broke out. The Medical
Emergency Team is notified.
0505 The fire is still in progress, the Shift Supervisor declares
an UNUSUAL EVENT based on a fire >10 minutes in duration.
State and local authorities as well as the NRC are notified.
0510 Fire Team Leader reports that one person has been rescued and
is being attended to by the MET but does not appear to be
seriously injured.
The fire is still burning and the Fire
Brigade is uncertain as to how many more people are trapped.
0525 The Fire Team Leader reports that the fire has been
extinguished.
A second person has been rescued.
The extent
of the injuries appear to be first and second degree burns on
,
chest and legs and smoke inhalation.
The,first person
. , ~ .
rescued suffered minor smoke inhalation only.
An ambulance
is requested and dispatched. Seven Rivers hospital is
notified.
0527 A work crew that evacuated the Auxiliary Building due to the
fire left an improperly installed hoist in place in the waste
gas valve alley on 95' elev.
The hoist causes a failure of a
waste gas header line resulting in a small crack and a
release of activity into the Auxiliary Building. The source
of the leak is the Waste Gas Decay Tank (WGDT) and cannot be
isolated.
l
0527 The control room receives an alarm (RM-A3 WARNING) indicating
increased activity in the Aux. Bldg.
l
f
0536 The control Room Receives an alarm (RM-A2 WARNING) indicating
low level release to the environment below Technical
'
Specifications.
!
!
0545 The ambulance arrives onsite and transports both victims to
Seven Rivers Hospital.
0555 The waste gas line fails completely causing a large increase
in release rate.
The control room receives an RM-A2 HIGH
I
alarm.
w-
I
0559 RM-A2 reaches Technical Specification levels.
1
_
- - - . _ ___ _____
'
,
.
.
0605 RM-A2 reaches 10 times Tech. Spec. limits, based on this the
Emergency Coordinator declares an ALERT.
State, local, and
NRC authorities are notified. TSC activation begins and the
Environmental Survey Team and Dose Assessment Team prepara to
activate.
0625 The TSC is staffed and operational and the release continues
from the WGDT.
,
0630 The Emergency Coordinator receives follow-up information
concerning the accident victims.
The first victim is good
condition but is being held for observation (mild smoke
inhalation), the second victim is in critical condition and
is being airlifted to Tampa Burn Center.
0635 A SITE AREA EMERGENCY is declared based on a dose rate of
>50 mr/hr for greater than 30 minutes at the Site Boundary.
State, local, and NRC authorities are notified and the EOF is
activated.
0645 WGDT pressure continues to decrease due to the leak thus
decreasing radioactive release rate through the plant vent
(RM-A2) to the environment.
0654 A Heater Drain Limit Switch shorts causing a reactor trip.
The turbine fails to trip and is tripped locally.
0657 The transient (Reactor Trip) causes a small break reactor
coolant system leak of 30 gpm in the Reactor Building.
0706 The control room receives a Reactor Building Sump alarm.
0715 RM-A2 is at normal levels (< Tech. Spec.) and WGDT pressure is
O psi thus terminating the release to the environment. The
RCS leak in the Reactor Building is now at ~48 gpm.
0720 The Control Room receives an RM-A6 (GAS) WARNING alarm
indicatingincreased activity in the Reactor Building
Atmosphere. The decision is made to initiate plant cooldown
procedures. Preliminary steps are started to prepare for
cooldown (OP-209).
0733 Control Rod Group 1 (safeties) withdrawn, Plant cooldown is
started per (OP-103B)
0736 The Control Room receives an RM-A6 (GAS) HIGH alarm, activity
in the Reactor Building continues to increase.
0737 The RCS leak continues in the Reactor Building. RB Pressure
is at 1 psig, the Reactor Building sump is full, and plant
cooldown rate is 74 degrees per hour.
0801 The crack in the cold leg of the RCS inside the Reactor
Building 'significantly degrades causing a large leak into the
Reactor Building. The Engineered Safeguards System is
~
actuated.
i
i
b
.
,
'
.
.
0803 RB pressure is at 28 psig, RB temperature is at 237 degrees,
and the Containment High Range Monitor (RM-G29) reads 40
R/hr. Building spray is initiated and one pump fails due to a
failed Building Spray Valve (BSV-3). The Emergency Repair
Team is dispatched to the Auxiliary Building to investigate.
High RB pressure and operation of the Building Spray System
causes a failure of the penetration seal for the supply line
for RB Spray Ring No. 2 (l'ocated in quadrant 3,
106'elev., 8"
pipe). This causes the elevated RB activity to be released
into the Auxiliary Building.
0806 Control Room receives an RM-A2 HIGH alarm due to penetration
failure. Activity is again released to the environment.
0814 Reactor Building pressure is at 43 psig, RB temperature is at
317 degrees, and the Containment High Radiation Monitor reads
20,000 R/hr and is increasing.
0820 The Containment High Radiation Monitor peaks at 40,000 R/hr.
The release into the Auxiliary Building and the environment
also peaks at this time.
0829 A GENERAL EMERGENCY is declared based on the RB conditions
listed above. The following Protective Action Recommendations
are given to.offsite authorities:
-
'
- IVACUATE 0-5 MILES, 380 DEGREES
- EVACUATE 5-10 MILES, SECTORS B,C,&D
- SHELTER 5-10 MILES, ALL REMAINING 9ECTORS
0845 The Emergency Coordinator receives an update on the injury
victim.
He is in stable but guarded condition at the Tampa
Burn Center.
The wind begins shifting from out of the WSW (230 degrees) to
out of the west (260-270 degrees) prompting a change in
Protective Action Recommendations.
- EVACUATE 0-5 MILES, 360 DEGREES
- EVACUATE 5-10 MILES, SECTORS B,C,D,E,&F
- SHELTER 5-10 MILES, ALL REMAINING SECTORS
0.900 The Environmental Survey Team / Dose Assessment reports
>2 Rem /hr Child Thyroid at 3 miles.
0915 The Emergency Repair Team completes repairs on BSV-3 allowing
operation of the second Building Spray Pump, Reactor Building
pressure decreases at a faster rate. As RB pressure decreases
the release rate decreases.
l
1000 RM-A2 begins trending downward at a faster rate reducing the
environmental release.
<
2
s.
.
.
,
1020 RB pressure is at 7 psi. The penetration seal holds at this
'
reduced pressure thus terminating the radioactive release
,"
through the Auxiliary Building.
1030 RM-A2 is at normal levels (< Tech. Spec.) indicating the
release tp tne environment is terminated.
1100 The' plant is stable and recovery efforts begin.
1130 The Exercise is terminated.
.
6
-
.
- e
$
'
.
.
s
.
1