IR 05000302/1988017

From kanterella
Jump to navigation Jump to search
Insp Rept 50-302/88-17 on 880523-27.No Violations Noted. Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Security Sys Power Supply,Lighting,Assessment Aids & Alarm Stations
ML20195C710
Person / Time
Site: Crystal River 
Issue date: 06/10/1988
From: Mcguire D, Tilman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20195C685 List:
References
50-302-88-17, NUDOCS 8806220263
Download: ML20195C710 (1)


Text

.(

,$

pa Rion UNITED STATES

.

  • NUCLEAR REGULATORY COMMISSION

'

REGION li g

j 101 MARIETTA STRE ET, N.W.

'"

t ATLANTA, GEORGI A 30323

\\ **"* /

JU N 141989 Report No.:

50-302/88-17 Licensee:

Florida Power Corporation 3201 34th Street, South St. Petersburg, FL 33733 Docket No.:

50-302 License No.:

OPR-72 Facility Name:

Crystal River 3 Inspection Conducted:

May 23-27, 1988 Inspector:

( f! It 'W

[[/O /S f W W lillman PhysjcalSecurityInspector Date Signed Approve by: b U2 W Vs '

h//O/N j

v1. R. McGuire, Chief Data SjQned J

T Physical Security Section L

Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine unannounced inspection was in the areas of Security PlanandImplementingProcedures;SecurityOrganization;Recordsand Reports; Securit Assessment Aids; Alarm Stations; y System Power Supply; Lighting; Contingency Plan Communications; and Safeguards j

Implementation Review.

Results:

The licensee was found to be in compliance with regulatory requirements within the nine areas inspected.

l ENCLOSURE CONTAINS [$hs"le%l10%;"

8806220263 880614 DEcoyypotf,g PDR ADOCK 05000302

-- PCD -

- -

.c

,

pn Riog%

UNITED STATES

.

/

NUCLEAR REGULATORY COMMISSION

'

y"

REGION il g

3, j

101 MARIETTA STREET,N.W.

  • c ATLANTA, GEORGI A 30323 s '"* * /

JUN 141988 Report No.:

50-302/83-17 Licensee:

Florida Power Corporation 3201 34th Street, South St. Petersburg, FL 33733 Docket No.:

50-302 License No.:

DPR-72 Facility Name:

Crystal River 3 Inspection Conducted:

May 23-27, 1988 Inspector: b O! ; tty' '

(c//0/Vf st %: fillman Phys;j1 cal Security Inspector Date Signed Approve by: b a il it % '

/,//0 / E[

qM.R.McGuire,Chfef Data Signed D

Physical Security Section k.

Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine unannounced inspection was in the areas of Security Plan and Implementing Procedures; Security Organization; Records and Reports; Securit Alarm Stations; y System Power Supply; Lighting; Assessment Aids; Communications; and Safeguards Contingency Plan Implementation Review.

Results:

The licensee was found to be in compliance with regulatory requirements within the nine areas inspected.

,

I I

[hhm s

,

8806220263 880614 IS DE00ntaow"..

PDR ADOCK 05000302 Q

DCD

~ - ~ ~ - - - _ _ _ _ _ _ _ _