_
..
.
-
.
4
SAFEGUARDS INFORMATION
-
.
.
4
U. S. NUCLEAR REGULATORY COMMISSION
REGION 11
5 -
DJcket No:
50-302
'
License No:
]
R'eport No:
50-302/97-03
Licensee:
Florida Power Corporation
Facility:
Crystal River Nuclear Station Unit 3
Location:
15760 West Power Line Street
,
{
Crystal River, FL 34428-6708
4
j
Dates:
March 17-21,1997
Inspector
L. Stratton, Safeguards Inspector
.
l
Accompany
Personnel:
8. Manili, Licensing Reviewer, NRR
i
'
Approved by:
Paul E. Fredrickson, Chief
j
Special Inspection Branch
Division of Reactor Safety
,
.
f
i
3
.
.
!
---
SAFEGUARDS INFORMATION
---
m m a-*
~
9704290134 97u418
(*
"
ADOCK 05000302
.
G
PM c
'
'
.
..
.
..
-
SAFEGUARDS INFORMATION
EXECUTIVE SUMMARY
Crystal River Unit 3
,
NRC Irispection Report 50-302/97-03
This routine, announced inspection was c
Power Reactors and Control of Safeguard I fsafeg
a e were the Physical Security Program for
nal
s n ormation.
o
immediately report the loss and remove th bTh
a ge and subsequent failure to
in a violation of regulatory requirements
e
. The licensee's actions upon d
event were timely and appropriate. (Paragraph S2
o
.1)
Progression of the security upgrade was
modifications were scheduled to be completed
.
. Installation of several
were in place during this inspection. (Paragraph Sppropriate
2.9)
o
(Paragraph S2.9)The Final Access Control Officer was knowl d
e geable of his responsibilities and duties.
o
(Paragraph S2.9) Vital area door checks were observed to b
e within the licensee's procedure.
o
Protection of Safeguards information " was idAn
73.21, " Requirement for the
in response to
reoccurrence. previous similar violations has been inadequat
,
(Paragraph S4.3)
o
Unresolved item 50-302/96-07-03
was reviewed by the NRC. The licensee's respo
was closed
ersonnel History Questionnaire,
appropriate. (Paragraph S8.1)
nse and timely actions were
SAFEC,f !/\\Pr)g iMenggq rim ;;;ii;;:~d w.n
ptrwamWW
..
W
w
f5m
.
i
')**""*"*""
\\
.
.
'
SAFEGUARDS INFORMATION
.-
-
,
EXECUTIVE SUMMARY
Crystal River Unit 3
NRC In'spection Report 50-302/97-03
This routine, announced inspection was conducted in the area of plant support by a regional
safeguards inspector. The specific areas evaluated were the Physical Security Program for
Power Reactors and Control of Safeguards information.
The licensea's loss of control of a security badge and subsequent failure to
o
immediately report the loss and remove the badge from the security computer resulted
in a violation of regulatory requirements. The licensee's actions upon discovery of the
event were timely and appropriate. (Paragraph S2.1)
Progression of the security upgrade was continuing. The licensee had scheduled the
o
completion of the upgrade to be in late June 1997. Installation of several
modifications were scheduled to be completed. Appropriate compensatory measures
were in place during this inspection. (Paragraph S2.9)
The Final Access Control Officer was knowledgeable of his responsibilities and duties.
o
(Paragraph S2.9)
Vital area door checks were observed to be within the licensee's procedure.
o
(Paragraph S2.9)
An apparent violation of the provisions of 10 CFR 73.21, " Requirement for the
o
Protection of Safeguards Information," was identified. The licensee's corrective action
in response to previous similar violations has been inadequate to prevent
reoccurrence. (Paragraph S4.3)
o
Unresolved item 50-302/96-07-03 was closed. The Unresolved Item, with respect to
several contractors falsifying information on their Personnel History Questionnaire,
was reviewed by the NRC. The licensee's response and timely actions were
appropriate. (Paragraph S8.1)