IR 05000302/1997015

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector
ML20211Q271
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/14/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20211Q238 List:
References
50-302-97-15, NUDOCS 9710220222
Download: ML20211Q271 (2)


Text

j.

,

U. f., NUCLEAR REGULATORY COMMISSION

,

-

REGION 11 Docket No:

50-302 License No:

DPR-72 Report No:

50-302/97-15-

'

Licensee:

Florida Power Corporation Facility:

Crystal River Nuclear Station Unit 3 Location:

15760 West Power Line Street Crystal River, FL _ 34428-6708 Dates:

Septernber 22-26,1997 Inspector:

L. Stratton, Safeguards inspector Approved by:

Caudie A. Julian, Acting Chief i

Special inspection Branch Division of Reactor Safety

)

.

mm-n - - *DE

~m u%%

9710220222 971014 PDR ADOCK 05000302 G.

PDR

______.

  • SAFEGUARDS INFORMATlON

-

.

-- EXECUTIVE SUMMARY Crystal River Unit 3 NRC Inspection Report 50-302/97-15 -

This routine, announced inspection was conducted in the area of plant support by a regional safeguards inspector. The specific area evaluated was the Physical Security Program for Power Reactors.

Compensatory posts were appropriately established and in accordance with the o

licensee's Physical Security Plan and applicable procedures. Officers observed and interviewed were knowledgeable in their duties and responsibilities. (S1.1)

A violation of regulatory requirements was identified by the inspector in that the o

licensee failed to control protected area accecs with the requirements specified in the NRC approved PSP and implementing procedures. (S2.1)

l

. Testing and maintenance of security related equipment was being performed on a-o timely schedule and in accordance with the PSP and implementing procedures.

(S2.4)

,

Revision 6-14 of the licensee's PSP did not decrease the effectiveness of the PSP o

and was in compliance with 10 CFR 50.54(p). (S3.1)