IR 05000302/1990025

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-302/90-25 on 900812-17 (Ref 10CFR2.790(d) & 73.21).One Unresolved Item Identified.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Programs,Organization & Audits
ML20059L956
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/24/1990
From: Masnyk O, Mcguire D, Stansberry W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20059L953 List:
References
50-302-90-25, NUDOCS 9010020247
Download: ML20059L956 (1)


Text

e .

,

'

1, , '*' *

.

SAFEGUAf3DS INFORMATION i '

f$ PUTED STATES

,[(pilog' ,

"

NUoLEARL yALATORY COMMISslON If*' ' .

REGION ll 101 MARIETTA ST RE ET, ;

'

,

N & ATLANTA, GEORGl A 30323

!

,

....,' SEP EA t t

!

Report No.: 50-302/90-25  ;

b Licensee: Florida Power Corporation  !

320134th Street, South '

!

St. Petersburg, FL 33733  !

!

h Docket No.: 50-302 ' License No.: DPR-72 ,

,

.L Facility Name: Crystal River 3 i ;

Inspection Conducted: gust 2-17, 1990  !

Inspectors: [O. . A'(44 ' 9/7/ND W. 3 :an try, Safegu " p ds Inspecto Dhte 51gned -

s

/Q

&

,

X

, ,i k , ! afeguards Inspector WMho Uhte '51gned

Approved by: . Afb 7~~~~ 7/7#

D. R. ficGulre Chief D4te 5fgned l Safeguards Section i Nuclear Materials Safety and Safeguards Section  !

Division of Radiation Safaty and Safeguards

SUMMARY ,

!

Scope:

This routine, unannounced , inspection was conducted in the area' of Physical Security Program for Power Reactors, specifically:- Security Plan and *

.. Implementing Procedures; Management Effectiveness; Security Program; Security '

Organization; Security Program Audit; Records and Reports; Testing and -

Maintenance; Physical Barriers - Protected and Vital Area; Security System i Porer Supply; Access Control - Packages, Personnel and Vehicles; Detection Aids

- Protected and Vital Areas; Alann Stations; Consnunications; Lighting; i Compensatory Measures; and Assessment Aid .

!

Results: ,

In.the areas inspected, one unresolved item was identified. There appears to-be some question as -to interpretation of the Security Plan commitments in regards to assessme_nt. The security program appears to be effective,and the +

security organization is capable of providing an acceptable level of protection 4 for the site reiource l

!

901002o247 900924 ,

PDR ADOCK 0500 p ,,

o y .- ._.- , _

SAFEGU ARDS INFORM ATICM ,7fy~t.:%g, ~ ,,os,, m , ,

,

,

. . -