Forwards Special Team Insp Rept 50-302/85-09 on 850304-08. Eight Open Items Noted
ML20125D022
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/10/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20125D025 List:
References
NUDOCS 8506120225
Download: ML20125D022 (3)


See also: IR 05000302/1985009

Text

2

44

0

o

UNITED STATES

",i

NUCLEAR REGULATORY COMMISSION

g.

5

j

WASHINGTON, D. C. 20555

June 10, 1985

,,,,,

Docket No. 50-302

Florida Power Corporation

ATTN: Mr. Walter S. Wilgus

Vice President

Post Office Box 14042

St. Petersburg, Florida. 33733

Gentlemen:

SUBJECT:

INSPECTION NO. 50-302/85-09

Enclosed is the report of the special team inspection conducted by Mr. R. C. Wilson

and other NRC representatives on March 4-8, 1985, at the Crystal River 3 site of

Florida Power Corporation of activities authorized by NRC License No. DPR-72.

The team's findings were discussed with you and members of your staff at the

conclusion of the inspection. The inspection reviewed your implementation of a

program as required by 10 CFR 50.49 for establishing and maintaining the

qualification of electric equipment within the scope of 10 CFR 50.49. The

inspection also included evaluations of the implementation of equipment quali-

fication corrective action commitments made as a result of the January 11, 1983,

Safety Evaluation Report (SER) and the October 1,1982, Franklin Research Center

Technical Evaluation Report (TER). Within this area, the inspection consisted

of examinations of selected procedures and records, interviews with personnel,

and observations by the inspectors.

You stated that you plan to complete implementation of your program for meeting

i

the requirements of 10 CFR 50.49 by the end of the refueling outage that began

March 9, 1985. The inspection determined that you have made considerable

progress toward completing that plan, but a substantial amount of work must be

performed before restart. The Qualification Documentation Files generally were

deficient because they lacked some necessary information, although much of that

information was provided during the inspection in response to questions. Quali-

fication of several components has not yet been established pending resolution

of additional concerns detailed in the Inspection Report, but no equipment was

found to be not qualified. Your Qualification Maintenance Program Manual was

I

found to be generally satisfactory, but only one of the implementing procedures

'

was in effect. Your master list was found to be adequate.

0

4

/

t t

8506120225 850610

PDR

ADOCK 05000302

70" ".8 6

G

PDR

origamal deemment not M t#W

oortified d 0^ ^^ L N O d N

v

t

'

' Florida Power Corporation

-2-

June 10, 1985

The enclosed Inspection Report describes eight Open Items.

Your actions

concerning these items will be' addressed in a future NRC inspection.

You

should carefully review the inspection findings and take appropriate action

so as to achieve full compliance with the requirements of 10 CFR 50.49 prior

to restart from your March 9,1985 outage, since noncompliance with 10 CFR 50.49 requirements after that time will result in enforcement action.

We are available to discuss any questions you have concerning this inspection.

Sincerely,

,

,

Gary . Zech, Chief

Vendor Program Branch

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 50-302/85-09

m.;

~

n

'

Florida Power Corporation

-2-

June 10, 1985

DISTRIBUTION:

DCS --

PDR

-VPB Reading

'

-lDQAVT Reading'

JJTaylor

.RVollmer

BKGrimes

UPotapovs

GHubbard

GHolahan, NRR/0RAB

RWilson

RLaGrange,NRR/EQB

HGarg,NRR/EQB-

RKarsch,NRR/0RAB

HSilver,'NRR/DL

M. Yost,' Idaho National Engineering Laboratory

-

' LBustard,-Sandia National Laboratories.

-

'LFoster, RII

AHerdt,.RII

NMerriweather, RII

JThomaa, DPC

Q

(b

%

(Wb&

VPB:DQAVT

SC/ B:DQAVT

h

RR

C/N:NRR

NII

RWilson: sam

UPotapovs

GHolahan

RLaGrange-

ARHerdt

5/3 # 85

5/3o/8

ff/3 /85

f/3 /85

g/4/85

C

C

6

BC/VPB:DQAVT

V

R:

E

-

Zech

ri

s

J

lor

3 /85

///85

i

..w

.m..

a,

- - - -- . - - - ---r--,.-.

+ ..,, .-

.