ML20128D999

From kanterella
Revision as of 17:01, 8 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-285/85-03 on 850304-08 & Notice of Violation.Actions Taken to Correct Previously Identified Insp Findings Also Examined
ML20128D999
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/23/1985
From: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20128E003 List:
References
NUDOCS 8505290268
Download: ML20128D999 (2)


See also: IR 05000285/1985003

Text

r: ,

...' c .h ,

MAY 2 31985

~

-

In Reply. Refer To:

Docket: 50-285/85-03~.

_

'0maha Public Power District .

~

ATTN: '.R.'L. Andrews, Division Manager-

. . Nuclear Production

1623 Harney Street

Omaha, Nebraska' 68102

Gentlemen:

~

This refers to the inspection conducted by Messrs. J. R. Boardman and D. E.

'Nonnan of this office during the period March 4-8, 1985, of. activities

authorized by NRC Operating License DPR-40 for the Fort Calhou'n Station, and to

_

the: discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas . examined,during the inspection ~ included the licensee's records program,

- calibration,1 measuring and. test equipment, and audit program implementation. -

Within these areas,-the inspection consisted of selectivo examination of

procedures and representative records,. interviews with personnel, and

observations by the. inspectors.- These findings are documented in-the enclosed

.' inspection report..

' During this inspection,. it was found that.certain of your activities were in

violation'of NRC requirements. Consequently, you are required to respond to'.

these violations,-in writing, in accordance with the provisions of

~ Section'2.201 of the NRC's " Rules of Practice," Part 2 Title 10, Code of .

Federal Regulations. Your response should be based on the specifics' contained-

in the Notice of Violation enclosed with this letter.

Two unresolved items are identified in paragraph 12 of the enclosed Linspection

-report.

'

We have also examined actions you have taken with regard to previously

identified . inspection findings. .The status'of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and-the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget'as required.

'

. by the Paperwork Reduction Act of 1980, PL~96-511.

F.

hn .{w

RIV:RPB1/SPES RPB2/B RP 1/SPES RPB2/Bh RPB

JR80ardman/vs D Norman REIreland unnicutt DRHu er

f /ti/85 bl/85 5 /2,,/85 /M/85 fat./85 gD}

-

p52aae!! Bi8Bjhs y

-

- - * - - - _ _ _ _ _ _ - .-___.W

_. -

_ ..

, ,

i ..

.

_

0maha-Public Power District ,

-2-

.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

~

,

.2-

Sincerely,

" Orig nal Signed By:

D. R. HUNTEil"

D. R. Hunter, Chief

Reactor Project Branch 2

-Enclosures: -

1. Appendix A - Notice'of. Violation

2. Appendix B NRC Inspection Report.

,

50-285/85-03

,

cc'w/ enclosures:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

For.t Calhoun, Nebraska 68023'.

2

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby &'MacRae

-.1333 New Hampshire Avenue, M4 ^.

, Washington, DC' 20036

r

'

,

c;bec to DMB (IE01) -

,

,bcc distrib.'by RIV:

<

  • * - * .

. .

s*RPB1

,

R. D. Martin,'RA ,

~

RPB2 * Resident' Inspector ,

.'

  • EP&RPB- *Section Chief (RPB2/A) * MIS System -

,

N- ,

-

  • RIV File R.'Denise, DRSP *RSTS Operator
  • D. Weiss, LFMB (AR-2015)-

'

, KANSAS STATE DEPT. HEALTH ' '

4

- NEBRASKA STATE DEPT. HEALTH *J. R. Boardman 'i

*D. E. Norman-

-

. (*w/.766

'

,

5

6

3