Notice of Violation from Insp on 851011-1115
ML20138C289
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/29/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20138C275 List:
References
50-416-85-39, NUDOCS 8512120532
Download: ML20138C289 (1)


Text

1 i .,

'{

,,' ~

. r s '

k, s ENCLOSURE 1 NOTICE OF VIOLATION N

\' s

'51ssissippiPowerandLight Docket No. 50-416 Grand Gulf License No. NPF-29 s

The following violation was identified durino an inspection conducted on October 11 - November 15, 1985. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification (TS) 6.8.1 requires written procedures be estab-lished, implemented, and maintained covering surveillance of safety related equipment. TS 6.5.3.1.a requires each procedure change to procedures required by TS 6.8 be prepared, reviewed, and approved. These requirements are incorporated by Administrative Procedure ( AP) 01-S-02-2, Control and Distribution of the GGNS Opera', ons Manual. Paragraph 6.3 of AP 01-S-07.-2 defines the methods to be followed when changing procedures.

4 Contrary to the above, Technical Section Instruction 09-S-08-2, Local Leak Rate Test ValV3 Alignment, paragraph 6.3 states "This instruction does not require revision whenever valve lineup tables or sketches or the P&ID's on which they are based are revised."

This is a Severity Level IV violation (Supplement 7).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statemrnt or explanation in reply, including: (1) adniission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full cc.npliance will be' achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date: h0V 23 d 8512120532 851129 PDR ADOCK 05000416 G PDR