Text
.
1 f
o ENCLOSURE 1 l
NOTICE OF VIOLATION System Energy Resources, Inc.
Docket No. 50-416 I
Grand Gulf License No. NPF 29 i
l During the Nuclear Regulatory Commission (NRC) inspection conducted on I
August 20 - September 23,"Gener,al Statement of Policy and Procedure for N 1988 In accordance with the Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:
Technical Specification (TS) 6.8.1.a requires that procedures shall be established,i lesented and maintained covering the applicable procedures recocaended ndix "A" of Regulatory Guide 1.33 Revision 2, dated i
Februa 1978.
inistrative Procedure 01-5 06-1, Revision 21, dent to Protec-tive T ing System states for tha shift supervisor /superinten evalua the tagging, out of breakera and determine the effect on plart i
- i operation by all affected components.
i Contary to the above, the licensee failed to follow Ahinistrative Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any I
affect on other equipment and plant operation.
This resulted in a loss of instrument air inside containment and a reactor scram on September 5, 1988.
i I
This is a Severity Level IV violation (SupplementI),
i Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc.
is I
hereby required to submit a written statement or explanation to the Nucle,ar Regulatory Commission ATTN:
Document Control Desk Region If, Washington, DC 20555and a co!
i j
with a copy to the Re,flional Administrator Resident Jnspector wit tin 30 days of the date of the letter transmitting this l
Notice.
This reply should be clearly marked as a "Reply to a Notice of l
1 Violation" and should include (for each violation):
(1)admissionordenialof the violation, (2) the reason for the violation if admitted, (3) the corrective i
steps which have been taken and the results at.hieved, (4) the corrective steps l
which will be taken to avoid further violations, and (5) the date when full l
l compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
If an adequate reply is not received l
l within the time specified in this Notice, an order may be issued to show cause i
j why the Ifcense should not be modified suspended, or revokec8 or why such other i
actionasmaybepropershouldnotbef,aken, j
FOR THE NUCL REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l
ReactorProjectsiranch1 DivisionofReactorProjects f
i l
Dated at Atlanta Georgia j
this 6th day of October 1988 SS10210484 881006 ADOCKO'500g6 DR
,