Special Rept:Certain Fire Protection Equipment Taken Out of Svc & Not Returned to Svc within Required Time,Per Listed Tech Specs.Fire Watches Established in All Cases
ML20138Q952
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/10/1985
From: Orser W
PORTLAND GENERAL ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
WSO-705-85, NUDOCS 8512300130
Download: ML20138Q952 (1)


Text

.A - -a,b - -__ _J r _ +_4 _ - _ - . > - - -5.-eA. a . - - _ .e

, m RECEIVED Q HR' Portland General Electric Company Fil12 5 December 10, 1985 Trojan Nudear Plant WSO-705-85 i i

P.O. Box 439 Rainier, Oregon 97048 NEOIdll Vlly (503)556 3713 Mr. John B. Martin Regional Administrator, Region V U.S. Nucl' ear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368

Dear Sir:

As a result of numerous fire protection modifications in progress at the Trojan Nuclear Plant, certain fire protection equipment has been taken out of service. Since some of this equipment could not be returned to service within the required time, this Special Report is being submitted pursuant to the Technical Specifications specified below.

1. Technical Specification 3.7.8.2 requires the deluge system in the electrical penetration area to be operable. Due to the installation of fire protection modifications, this deluge system was removed from i

service on October 28, 1985 and was returned to service on November 25, 1985. During the period the deluge system was inoperaDie, a continuous fire watch was established with oackup fire suppression equipment.

2. Technical Specification 3.3.3.7 requires fire protection instrumentation be operable in the elevation 69-ft switchgear room. Due to the in-stallation of fire protection modifications in the switchgear room, the fire protection instruments were removed from service oa October 29, 1985.

It is currently estimated these instruments will be returned to service by December 20, 1985. While these instruments are inoperable an hourly fire watch patrol is established.

3. Technical Specification 3.7.9 requires all 3-hour penetration fire barriers protecting safety-related areas to be functional. On November 6, 1985, the Auxiliary Building hoistway hatch cover between the 25-ft and 45-ft i

elevations was removed to accommodate tne installation of a new 3-hour rated :1atch cover. The installation of the new cover was completed on December 4, 1985. The smoke detectors on the 45-ft elevation of the A4xiliary Building in the vicinity of the hoistway were verified operable and an hourly fire watch patrol was established while the 3-hour pene-tration was n0n-functional. '

Sine rj1 ,

W. S. Orser General Manager g 2] Q $$ $344 PDR icojan Nuclear Plant I @