Special Rept:On 880416,20,21 & 24,fire Barriers in Listed Areas Declared Inoperable for Greater than 7 Days. Compensatory Measures of Tech Spec 3.7.9 Established as Required
ML20153F800
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/06/1988
From: Olmstead C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-194-88, NUDOCS 8805110050
Download: ML20153F800 (2)


Text

_ _ - - _ _ _ _ _ _ _ _ _ - . - . _ _ - _

g 'w '4-4 :- ' (sisd . '

+

g: en jkum.~ Tem tunaE 4-

, Portland General Electric Company. May 6, 1988

. Trojan Nuclear Plant .

CAO-194-88 71760 Columbia River liwy Rainier, Oregon 97048 (503)SS&3713 U.S. Nuclear Regulat'ory Commission Document Control-Desk Washington, D. .C. 20555 Gentlemen:

Special Report Limiting Condition for Operation (LCO) 3.7.9 of the Trojan Technical Specifications requires submittal of a Special Report if a 3-hour fire barrier is nonfunctional for greater than seven days. Fire barriers in the areas described below were declared inoperable on the dates indicated and remained inoperable for greater than seven days.

.The barri ers were derraded in order to support the indicated maintenance work in each area.

Date Declared Area / Maintenance Required Inoperable P-250 Computer Room (77' Control Building)/ April 24, 1988

. Service' Water maintenance Remote Shutdown Station (45' Control Building)/ April 21, 1988 Remote Shutdown Station installation Diesel' Auxiliary Feedwater Pump Room / April 21, 1988 Remote Shutdown Station installation Steam Turbine Auxiliary Feedwater Pump Room / April 20, 1988 Remote Shutdown Station installation l~

l Component Cooling Water Pump Area / April 20, 1988

! Remote Shutdown Station installation l

l C-160 Room (Old> Remote Shutdown Room)/ April 16, 1988 i Remote' Shutdown Station installation 45' Containment Airlock Access / April 16, 1988

- Support outage work in containment c

l.

! 'esositooso'esosos

/C65

  • l PDR ADOCK 05000344 I

, S. DCD. g

! t

.m .

.e: a.s.

NRC CAO-194-88 Page Two Date Declared -

Area / Maintenance Required. Inoperable-93' Containment Airlock Access / April'16, 1988 Support outage work in containment 93'-' Containment Equipment Access / April 16, 1988 Support outage work in containment The compensatory measures of_ Technical Specification 3.7.9 (checking local smoke detectors and establishing an hourly fire patrol) were established as required. It is expected that these barriers will be

. restored to operable status by June 30, 1988.

Sincerely, 0.4 C. A. Olmstead General Manager CAO/hPS/DWS/LAHisg c: Mr. William Dixon State of Oregon Department of Energy Mr. John B. Martin Regional Administrator US Nuclear Regulatory Commission Mr. R. C. Barr USNRC Resident Inspector Trojan Nuclear Plant Distribution