Special Rept:On 870408,Door 126,separating Electrical Penetration Fire Area E-1 & Turbine Bldg Fire Area T-1, Determined Nonfunctional for More than 7 Days.Caused by Deficient Latching Mechanism.Latch Corrected
ML20209E418
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/24/1987
From: Olmstead C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-146-87, NUDOCS 8704300046
Download: ML20209E418 (1)


Text

- .-m 'N[

Portland General Electric Cornpany Trojan Nuclear Plant April 24, 1987 P.O. Box 439 CAO-146-87 Rainier, Oregon 97048 (503) S56-3713 S p - 3 '+ +

US Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen Special Report Limiting Condition for Operation (LCO) 3.7.9 of the Trojan Technical Specifications requires the submittal of a Special Report if a 3-hour fire barrier is nonfunctional for greater than 7 days. On April 8, 1987, door #126 was determined to be nonfunctional for greater than 7 days.

During a routine inspection, door #126, which separates the electrical penetration fire area (E-1) and the turbine building fire area (T-1), was discovered to have 'a deficient latching mechanism and was not rated as a 3-hour door. The door was assumed to be nonfunctional for greater than 7 days, since it could not be verified the door was nonfunctional for less than 7 days. Compensatory measures described in Technical Specification 3.7.9 were fulfilled on April 8, 1987.

The estimated completion date for repair and return to service is May 1, 1987.

Sincerely, f hr C. A. Olmstead General Manager CAO[ S/D K:sg c: Mr. David Kish, Acting Director State of Oregon Department of Energy Mr. John B. Martin Regional Administrator US Nuclear Regulatory Commission USNRC Resident Inspector Trojan Nuclear Plant 0704300046 870424 PDR I 0