Special Rept:Listed Fire Barriers Declared Inoperable on Dates Indicated & Remained Inoperable for Greater than 7 Days.Barriers Degraded in Order to Support Indicated Maint Work in Each Area.Barriers Will Be Restored by 880630
ML20154M671
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/26/1988
From: Olmstead C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-220-88, NUDOCS 8806020037
Download: ML20154M671 (2)


Text

. . . . , , _- - - . .. . _ - - . - .

6,:. h sunt X M ,

Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River liwy May 26, 1988

. Rainier, Oregon 97048 CAO-220-88

-(503) 556-3713 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Special Report Limiting Condition for Operation (LCO) 3.7.9 of the Trojan Technical Specifications requires submittal of a Special Report if a 3-hour fire barrier is nonfunctional for greater than seven days. Fire barriers in the areas described below were declared inoperable on the '

dates indicated and remained inoperable for greater than seven days. '

The barriers were degraded in order to support the indicated maintenance work in each area.

Date Declared Area / Maintenance Required Inoperable North wall of Fuel Building May 10, 1988 (north / south corridor, 77' Fuel Building)/

Fire damper failed routine test

'B' Electrical Switchgear Room May 5, 1988 (69' Control Building)/

Remote Shutdown Station installation

'A' Electrical Switchgear Room May 7, 1988 (69' Turbine Building)/

Electrial cable pulls through wall Mechanical Room (105' Control Building)/ May 10, 1988 Remote Shutdown Station installation

'B' -125 volt Battery Room May 7, 1988 (69' Control Building)/

125 volt battery replacement North wall of Electrical Penetration Area May 4, 1988 (45' Electrical Penetration Area)/

Remote Shutdown Station installation

[b 8886$88SE$$88!!g4 .

'i t S

. _ _ . . _ . ~ . , . _ . _. . . . . _ - . , _ - . _ . . ~ . _ _ _ _ _ _ _ . - _ . -

,,r- ~

~8,'

NRC CAO-220-88 Page Two-Mechanical' Room (61' Control Building)/ May-16,.1988 Remote Shutdown Station installation

'A' (west) Emergency Diesel Generator Room May 3, 1988 (45' Turbine Building)/

Perform pipe hanger work and Remote Shutdown Station installation The compensatory measures of Technical Specification 3.7.9 (checking local smoke detectors and establishing an hourly fire patrol) were established as required. It is expected that these barriers will be restored to operable status by June 30, 1988.

Sincerely, f' he C. A. Olmstead General Manager CAO/RPS/DWS/LAH:sg c Mr. William Dixon State of Oregon Department of Energy Mr. John B. Martin Regional Administrator US Nuclear Regulatory Commission Mr. R. C. Barr USNRC Resident Inspector Trojan Nuclear Plant D.stribution

%,