ML20215G891
| ML20215G891 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/17/1987 |
| From: | Olmstead C PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CAO-217-87, NUDOCS 8706230427 | |
| Download: ML20215G891 (1) | |
Text
.
i2 L' h
1
' Portland General Electric Company
' Trojan Nuclear Plant P.O. Box 439 -
. Rainier, Oregon 97048
. June 17, 1987 CAO-217-87
.(503)556 3713 -
US' Nuclear Regulatory Commission,
" Document Control Desk 4
Washington,-D.C.
20555 Gentlemen:
U Special Report Limiting Condition for Operation (LCO)-3.7.9 of'the Trojan
' Technical Specifications requires the submittal of a Special Report'if a. fire; barrier protecting safety-related equipment l
'is; inoperable 1for greater than.7 days.
On June 5, 1987, door number'428 was determined to.be' inoperable:for' greater J
than-.7 days.;
i During a routine inspection, door number 428, which separates the Service Water Boster Pump area from the crane bay on I
the 45' Auxiliary Building, was discovered not to close and latch properly.
The door was assumed-to be inoperable for greater than 7 days since it could not be' determined exactly when the door became-inoperable.
Compensatory measures ~de-scribed in Technical Specification 3.7.9 were fulfilled on June 5,.1987.-
E The estimated completion date for repair and return to service is. August 1, 1987.
Sincerely,
.N wgO C. A. Olmstead General Manager CAO/RPS/DWS/
- sg c:
Mr. David Kish, Acting Director i
State of Oregon Department of Energy Mr. John B. Martin Regional Administrator US Nuclear Regulatory Commission f
Mr.
R.
C.
Barr USNRC Resident Inspector Trojan Nuclear Plant I
h 8706230427 870617 ADOCK0500g43.
PDR S
.