ML20245F599

From kanterella
Jump to navigation Jump to search
Reissue of Special Rept Re 3-h Fire Barrier Nonfunctional for Greater than 7 Days.Emergency Diesel Generator Ceiling Removed on 890707 for Const.Fireproofing Restored as of 890725.Compensatory Measures of Tech Spec 3.7.9 Established
ML20245F599
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/26/1989
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CPY-177-89, NUDOCS 8908150002
Download: ML20245F599 (1)


Text

. -_-

seemt. _ unge El l.

l Portland General Electric Company July 26, 1989 i Trojan Nuciear Plant CPY-17'f-89 71760 Columbia River IIwy Rainier, Oregon 97048 (503) 556-3713 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Reissue of Snecial Reoort Limiting condition for Operation (LCO) 3.7.9 of the Trojan.

Technical Specifications (TTS) requires submittal of a Special Report if a 3-hour fire barrier is nonfunctional for greater than seven days. The fire barrier in the area described below was declared inoperable on the date indicated and remained inoperable for greater than seven days.

1. West Emergency Diesel Generator (EDG) ceiling. Fireproofing for structural steel, supporting the ceiling, was removed on 7 July 1989 for construction. Additional HVAC ductwork seismic supports are being installed, necessitating the removal of the fireproofing. The fireproofing was restored as of 25 July 1989.
2. East Emergency Diesel Generator (EDG) ceiling. Fireproofing for structural steel, supporting the ceiling, was removed on 7 July 1989 for construction. Additional HVAC ductwork seismic supports are being installed, necessitating the removal of the fireproofing. The fireproofing was restored as of 25 July 1989.

The compensatory measures of Technical Specification 3.7.9 (checking local smoke detectors and establishing an hourly fire patrol) were established as required.

Sincerely, 8900150002 890726 4  ?! #

DR ADOCK 050 C. . Yundt g ~

General Manager

Trojan Nuclear Plant CPY S a eA WS/JWL/ROR