Special Rept:On 880128,listed Fire Barriers Determined to Be Nonfunctional to Provide 3-h Fire Barrier.Compensatory Measures of Tech Spec 3.7.9 Established as Required.Barriers Expected to Be Upgraded to Comply W/Current Stds by 880801
ML20149H981
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/17/1988
From: Olmstead C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-075-88, CAO-75-88, NUDOCS 8802220226
Download: ML20149H981 (1)


Text

M-ff" *

}

(

b

~

sw Portland General 1:lectnc Company Trojan Nxlear l'1 ant February 17, 1988 CaO-075-88 71760 Columbia Rher lia)

Rainier Oregon 9704x (503) 556 3713 U.S.

Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 Gentlemen:

Special Report Limiting Condition for Operation (LCO) 3.7.9 of the Trojan Technical Specifications requires submittal of a Special Report if a 3-hour fire barrier is nonfunctional for greater than 7 days.

On January 28, 1988, the following fire barriers ware determined to be nonfunctional:

1.

The south wall of the east Emergency Diesel Generator Room.

2.

The south wall of the west Emergency Diesel Generator Room.

3.

The south wall of the turbine building Electrical Switchgear room.

None of these walls had a seal between it and its adjacent wall sufficient to provide a 3-hour fire barrier.

The fire barriers were determined to be inoperable during an engineering inspection of the seismic separation areas for the Emergency Diesel Generator rooms and the Electrical Switchgear room.

The barriers appeal to be f r om original construction and do not comply with current standards.

The compensatory measures of Technical Specification 3.7.9 (checking local smoke detectors and establishing an hourly fire patrol) were established as required.

It is expected that these barriers will be upgraded to comply with current standards by August 1, 1988.

Sincerely N

m wxw es C.

A. Olmstead De$

General Manager h MN c an CAO/RPS/Dd&/LAHisg oo

~ 7 SL fj c

Mr. William Dixon Mr.

R.

C.

Barr

$b ca o State of Oregon USNRC Resident Inspector i

\\

f4$

Depar tme n t of Energy Trojan Nuclear Plant Sog Mr. John B.

Martin Distribution

[d[m Regional Administrator US Nuclear Regulatory Concission

.