ML20132H001

From kanterella
Jump to navigation Jump to search
Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant
ML20132H001
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 12/12/1996
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20132G990 List:
References
PGE-8010-01, PGE-8010-1, NUDOCS 9612270108
Download: ML20132H001 (9)


Text

.. - -. -, -. ~.. -. - -. -. _ -.

.. - ~ ~ _ - ~. -, - -... - -. -. -...... -. -. - -. - -.. - - -.. -... _ -.. - _ ~ ~.. ~

5 i

j 1

i 1

8 PGE-8010 i

i 1

i E-1 E;

r 4

i 1

PORTLAND GENERAL ELECTRIC (PGE) i NUCLEAR QUALITY ASSURANCE PROGRAM FOR 4

TROJAN NUCLEAR PLANT t

I d

e I

i f

1 2

i l

5, Revision 20 i

.s.

i 1

i i

4 i-t I

i l

Portland General Electric Company j

121 SW Salmon Street

^

Portland, Oregon 97204 l.

I 1

a 4

t i

1, i

i 2

5 d

'9612270108 961212 i

PDR ADOCK 05000344 p

PDR w

~

o w-e

-.m-.-.m w

wv.

w-

,w,.

,,e,

-n u

l O

PGE-8010 V

PCE NUCLEAR QUALITY ASSURANCE PROGRAM FOR TROTAN NUCLEAR PLANT

~

)

/

Approval

'4 7-

_/O-/O"Tb General ManagW, Atclear Oversight Date f W Td

= g

/2[/2[9C

/

Approval:

Trojan Si'te Executive and Pl W General Manager Date bV Portland General E',ectric Company 121 SW Salman Street Portland, Oregon 97204 Revision 20 e

m.

l PORTLAND GENERAL ELECTRIC COMPANY NUCLEAR QUALITY ASSURANCE PROGRAM

O l

POLICY STATEMENT j

)l Portland General Electric Company implements a Quality Assurance (QA)

Pro 3 ram which directs quality-related activities at the Trojan Nuclear Plant.

j This QA Program complies with Title 10, Code of Federal Regulations, 1

t Part 50, Appendix B, " Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants."

In addition to 10 CFR 50 activities, this QA Program applies to activities covered by 10 CFR 71, Subpart H,

" Quality Assurance for Packaging and Transportation of Radioactive Material," and 10 CPR 72, Subpart G, " Quality Assurance for Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste."

1 The approval of this document consnits the Portland General Electric Company to the requirements of the QA Program described herein and its i

successful implementation.

Portland General Electric Company personnel

{

who perform quality-related functions are responsible for complying with l

the requirements of this QA Program.

Changes to the QA Program must be. documented and approved by the General Manager, Nuclear Oversight and the Trojan Site Executive and Plant

{

General Manager.

i

,Af 'wMO = =y Trojan Site Executive M d Plant General Manager Portland General Electric Company m/ulu (Date) iv -

Revision 20

l

{

PGE NUCLEAR QUALITY ASSURANCE. PROGRAM List of Effective Paama I

Pace Revision i (title page) 20 11 20 iii 19 iv 20 v

20 1-1 through 1-4 20 l

1-5 19 1-6 20 i

2-1 19 2-2 16 3-1 and 3-2 16 4-1 19 5-1 16 6-1 and 6-2 16

{

7-1 and 7-2 16 8-1 16 9-1 16 10-1 16 i

11-1 16 12-1 and 12-2 16 13-1 16 14-1 16 15-1 and 15-2 16 16-1 16 17-1 16 18-1 16 A-1 16 A-2 through A-4 17 B-1 through B-3 19 G1-1 19 G1-2 16 G1-3 through G1-5 19 O

- v-Revision 20 1

I 1.0 ORGANIZATION 3(v 1.1 PURPOSE The Portland General Electric Company (PGE or Company) executive management is responsible for the safety of the Trojan Nuclear Plant (TNP) and the Trojan Independent Spent Fuel Storage Installation (ISFSI).

The Nuclear Quality Assurance Program (hereafter referred to l

as the QA Program) deals specifically with management of quality-related activities pertaining to the operation, maintenance, design, modification, and decommissioning of the TNP and the design, fabrication, construction, testing, operation, modification, and decommissioning of the ISFSI.

This chapter describes the functions, authorities, responsibilities, and interfaces of the PGE management organizations involved with the TNP and the ISFSI.

1.2 ORGANIZATION The management organization (General Manager and above) for control of the TNP and the ISFSI is shown in Figure 1.0-1.

The Chairman of the

(

Board is responsible to the Board of Directors for overall management of the Portland General Electric Company.

He delegates responsibility and authority for all aspects of the TNP and the ISFSI to appropriate Senior Officers.

1,2.1 chairman of the Beard and chief Executive Officer The Chairman of the Board and Chief Executive Officer (CEO) has delegated to the Senior Vice President, Power Supply, and the Senior Vice President, Finance, Accounting, and Administration, the responsibility of assuring that management and staff implement the QA Program.

1-1 Revision 20

1.2.2 San 4er Vice President. Power Sunniv

)

The Senior Vice President, Power Supply, reports to the CEO for nuclear i

activities and delegates the responsibility for assuring ~ implementation of the QA Program to the Trojan Site Executive and Plant General Manager, hereafter referred to as the Plant General Manager.

1.2.3 plant'danaval Manmaar The Plant General Manager reports to the Senior Vice President, Power Supply.

The Plant General Manager has overall authority and responsibility for operations, maintenance, radiation protection, l

emergency planning, and for execution of this QA Program at the plant to ensure safety.

The Manager, Operations; Manager, Maintenance; and Manager, Personnel / Radiation Protection, report to the Plant General Manager.

In addition, the General Manager, Nuclear Oversight; the General Manager, Engineering / Decommissioning; and the General Manager, Plant Support and Technical Functions report to the Plant General Manager and their responsibilities are addressed in the following subsections. The Plant General Manager has delegated to the nuclear Division managers responsibility for implementation of this QA Program.

(r)

N

The Independent Review and Audit Committee (IRAC) reports to him, and he is responsible for evaluating recommendations of the IRAC and assuring that responsible management acts on recommendations which are to be implemented.

j 1.2.3 1 IRAC The IRAC performs review functions required by the license. The IRAC i

annually assesses the adequacy of the QA Program'e implementation.

Additionally, the IRAC is responsible for conducting a biennial audit'of j

the Nuclear Oversight Department, i

The results of the annual assessment of the QA Program's implementation, the biennial audit of the Nuclear Oversight Department, and audits of the IRAC, are forwarded to the Plant General Manager.

1-2 Revision 20

i l

1.2.3.2 Nuclear Oversicht Denartment The Nuclear Oversight Department is under the direction of the General Manager, Nuclear Oversight. This department is independent of other departments performing quality-related activities.

j i

To control deviations from QA Program requirements, the Nuclear Oversight Department has the authority and responsibility to initiate stop work orders, as necessary, for any condition adverse to quality j

that has occurred or is developing.

i 1.2.3.2.1 General Manmaer. Nuclear Overnicht The General Manager, Nuclear Oversight, together with the Plant General Manager, is responsible for approving revisions to the QA Program. The General Manager, Nuclear Oversight, has the authority and independence to identify quality problems; initiate, recommend, or provide solutions to quality problems through designated channels; and verify implementation of solutions to quality problems.

The General Manager, j

Nuclear Oversight, directs the Nuclear Oversight staff in the I

implementation of the overall QA Program, including contractor QA involvement.

m 1.2.3.2.2 Oualification Recuirements for the General Mannaer.-Nuclear Oversicht The General Manager, Nuclear Oversight must be knowledgeable of the QA Program and 10 CFR 50, Appendix B, and maintain up-to-date knowledge of applicable regulatory guides, codes, and standards related to quality assurance.

The General Manager, Nuclear Oversight, must meet the following qualifications:

Eight years of experience in the field of quality assurance or equivalent number of years of nuclear plant experience in a.

1-3 Revision 20

supervisory position or a combination of the two.

Graduation from a four-year accredited engineering or science college or 7-)g I

(,

university may be substituted for four years of this experience.

At least one year of this experience shall be nuclear power plant i

experience in the implementation of the quality assurance program.

I 1.2.3.3 General Manmaer. Enaineerina/Decomm4maionina The General Manager, Engineering / Decommissioning, has primary responsibility for direction and coordination of decommissioning, design engineering, and for design control to ensure safety and reliability.

1.2.3.4 General Manmaer. Plant Sunnert and Techn4 cal Punctinna The General Manager, Plant Support and Technical Functions, has been delegated responsibility for the direction and coordination of nuclear regulation and for security, training, and the overall administration and maintenance of records.

1.2.3.5 Plant Staff The plant organization described in procedures details the functional areas and responsibilities, qualifications, and training required for personnel performing quality-related activities.

s l

1 1

4 1-4 Revision 20 I

O O

O

=

' CHAIRMAN OF THE BOARD AND CHIEF EXECUTIVE OFFICER

~

l l

SENIOR SENIOR VICE PRESIDENT PRESIDENT MmEME POWER SUPPLY PGE E

AND ADMINISTRATION 3

6 f

h

<n

.9 TROJAN SITE EXECUTIVE VICE PRESIDENT PLANT GEN MANAGER INDEPENDENT REVIEW AND AUDIT COMMITTEE

[

DIRECTOR ENVIRONMENTAL POUCY i

I I

GENERAL MANAGER GENERAL MANAGER GENERAL MANAGER NMEAR MRSGHT PLANT SUPPORT AND ENGINEERINGl yo TECHNICAL FUNCTIONS DECOMMISSIONING Bo T3

.og N

ao IO m

T3 E h,,-

t 5.

t a

s g-n 3

3 i

I

.